Loading...
HomeMy WebLinkAbout525WMb - Truss PlacementStick frame porch roof Stick frame 16-06-00 TOP 16-06-00 TOP 16-02-12 TOP 20-02-14 TOP 20-02-14 TOP 18-00-12 TOP 16-06-00 TOP HGUS26-2 HGUS26-2 HGUS26-2 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 16-06-00 TOP 11-01-02 TOP 9-01-02 TOP 11-01-02 TOP 5-03-00 TOP 6-11-00 TOP 6-11-00 TOP 5-01-00 TOP Stick frame eyebrow roofs HGUS26-2 HTU26 HTU26 Stick frame Stick frame MUS26 MUS26 MUS26 MUS26 MUS26 MUS26 MUS26 GE01 GE02 GE03 GE04 TG01 TG02 TG03 T04 TG04 TG05 GE05 T06 GE06 TG06 T13 GE07 GE08 T12 TG07 V01 V02 V03 V04 V05 PBE01 PBE02 PBE03 PBE04 T02(2) T03(2) T05(3) T07(3) T08(3) T10(10) PB01(10) PB02(8) T11(5) PB03(6) M02(7) T09(3) T09(4) M01(3) PB04(3) T01(7) 37-04-00 18-03-00 10-08-00 7-00-00 14-06-00 30-11-00 66-03-00 4-08-00 2-04-00 1-10-00 13-04-00 15-03-00 7-04-00 7-08-00 15-04-00 16-00-00 13-07-00 14-08-00 12-07-08 18-05-08 45-05-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-06-08 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 12-07-08 2-00-00 2-00-00 1-05-00 2-00-00 2-00-00 1-10-08 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-10-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-06-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-09-00 3-11-00 IRC 2018 TPI 2014 20TLL - 10TDL - 10BDL Wedgewood Building Company Putka Residence 525Mb 1/4"=1' April 23, 2020 PH B20000275 CUSTOMER: LOCATION: MODEL: JOB #: DATE: DESIGNER: DESIGN INFORMATION: SCALE: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol