Loading...
HomeMy WebLinkAboutM004.02x6 Ledger- ByBuilderSheathing Ledger- ByBuilder Sh'tg Ldgr. 2x4LedgerB.O.L. 9' 1 1/8" Scale: 1/4" =1' 0" Truss T05C 4 12 9' 1-1/8" Wall Detail 'A' 2x4Ledger B.O.L. 8'-5 7/8"Nail JacksLUS24Nail JacksLUS24 LUS24HTU26 HTU26 HTU26 HTU26 HTU26 LUS2 4 Nail Jacks HTU262x4Ledger 2x4Ledger- See Detail 'A'2x4Ledger- See Detail 'A'2x4Ledger BP02 BP03 BP03 BP03 BP03BP01BP02 BP03 BP03 BP03 BP03 TG05TG05BT05BT05BT05BT05C2x4Ledger Porch Header 1st FloorWall Upper Level Cantileverd Wall LUS24LUS24LUS24LUS24LUS24LUS24 Blocking Panel Layout Hardware List 16 - LUS24* 6 - HTU26 160 - H2.5A *QtyIncludes (1) Extra Hgr. 2x4Ledger CG0 5 2x4Ledger- ByBuilder LAY01 LAY02 LAY03TG01AT01ATG01JG01 JG01CG01 CG02J03 J02 J05J04 JG01 J01 J01 CG02J02J04 TG02 T02 T02A GE02 JG02GE03 T03 T03 CG03J07J08 GE04TG05 JG03 T05 T05 GE05 CG04 J09 J10TG05BT05CT05CT05DTG05AJ12 J11 BP01 V01V02V03T01(5)T02B(8)T02B(2)T02C(3)T02D(2)T02D(2)J06(3)J01(5)T04(6)T05A(3)T05B(3) M01(10) 3-11-04 12-00-00 1-09-00 3-11-04 10-00-00 1-10-04 13-11-0821-10-08 35-10-00 10-00-0044-00-00 6-00-00 60-00-003-10-08 2-00-00 1-10-08 2-01-08 20-00-00 2-01-00 1-11-00 2-00-00 1-10-00 2-02-00 2-00-00 2-00-00 3-05-12 14-00-00 2-00-00 2-00-12 21-08-00 9-04-00 2-00-002-00-002-00-00 1-10-042-00-00 10-00-00 2-00-00 2-00-00 1-10-04 5-12 5-1219-10-0010-00 23-01-00 16-03-00 3-08-00 2-00-002-00-00 2-00-121-11-04 2-00-00 2-00-00 2-00-002-01-08 6-00-0010-03-007-04 5-11-08 4-08 2-00-00 1-10-042-00-004-094-0917-10-00 1-08-00 16-00-00 Customer: Location: Model: Designer: Job#: Date: Scale:Design Information:9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 IRC 2018 TPI 2014 20TLL - 10TDL - 10BDL MI HOMES Lot 77 The Groves at Legacy Tribeca (Hip) TL B20001796 July3, 2020 1/4" =1' 0"Mike Eder Salesperson: Sheet Of: 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 07/17/20 Mike Sheeks