Loading...
HomeMy WebLinkAboutLegacy Ridge 115 - Southill BBasement Foundation Front Elevation B Set No. 8960B2 Reversed (Left-Hand Garage) Orientation Lot 115, Legacy Ridge 6792 Grantsville Lane, Carmel, IN 46033 Southill B Integrated Plan Options Job Notes THIS PLAN SET REFLECTS THE FOLLOWING CHECKED OPTIONS: Plan Revisions Artist Rendering Only. See Construction Drawings andSelection Sheets for Finish Materials, Colors, Masonry Locations,Door, Window and Garage Door Specifications.EstateSouthill B8960B2 T-1Title PageHomesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Selected Options EstateSouthill B8960B2Front Elevation B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 A1.1ElevationsExterior Trim Key Note: Note: Note:Homesite-Specific Plan SetGenerated on: 6/5/202034'-5"07/27/20 William Hohlt Selected Options Southill B8960B2Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033A1.2ElevationsRight Elevation Rear Elevation Left Elevation Exterior Trim Key Note: Note:Homesite-Specific Plan SetGenerated on: 6/5/2020 07/27/20 William Hohlt Selected Options Southill B8960B2Roof Plan B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033A1.3Roof PlanSection at Porch Box-Beam Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Basement Slab Garage Slab Selected Options EstateSouthill B8960B2Foundation Plan B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033Bsmt. Slab Areas A2.1Foundation PlanSection at Porch Slab Homesite-Specific Plan SetGenerated on: 6/5/2020Note: 07/27/20 William Hohlt BasementFinished Bath BasementFinishedUnfinishedStorage/Utility Rm. Den ClosetWalk-In Hobby orExercise rm.EstateSouthill B8960B2Area Calculations Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 A2.2Foundation PlanFinished Basement Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Great Rm. Dining Rm. PowderRoom 3-Car Garage Sunroom Morning Rm. PlanningCenter Kit. FamilyFoyer 2-Story Bath 4 Pantry CoveredEntry Foyer Home Office /5th Bdrm. Suite Covered Porch Area Calculations Selected Options EstateSouthill B8960B2First Floor Plan B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 A3.1First Floor PlanNote: General Notes:Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt SharedBath Owner's Suite Laundry ClosetWalk-In Walk-InCloset Bedroom 4 Bedroom 2 Suite Owner'sBath Open toBelow Bedroom 3 Walk-InClosetOpen toBelow Bath 3 Closet Walk-In Selected Options EstateSouthill B8960B2Second Floor Plan B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 A3.2Second Floor PlanHomesite-Specific Plan SetGenerated on: 6/5/20202'-8"30502'-8"3050 07/27/20 William Hohlt EstateSouthill B8960B2Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 A4.1Building SectionBuilding Section Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt EstateSouthill B8960B2Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 A4.2Stair Section9' BasementStair Section Landing Detail at Niche Stair 9' Basement Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033Southill B8960B2A4.4Covered Patio DetailsPorch Slab Porch Box-Beam Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt EstateSouthill B8960B2Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 AD-4Family Org. DetailsSection at Built-Ins Plan Section at Built-Ins Elevation at Built-Ins Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt EstateSouthill B8960B2Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 AD-5Shower DetailsWalk-In Shower Plan at Walk-In Shower Elevation at Walk-In Shower Interior at Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt EstateSouthill B8960B2Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 E2.2Foundation Elec.Finished Basement Electrical Homesite-Specific Plan SetGenerated on: 6/5/2020Electrical Legend Note: Elevation A Shown, All Other Elevations Similar For Electrical Purposes Only Switch and Receptacle Locations May Vary 07/27/20 William Hohlt Selected Options EstateSouthill B8960B2First Floor Electrical B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 E3.1First Floor Elec.Electrical Legend For Electrical Purposes Only Switch and Receptacle Locations May Vary Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Selected Options EstateSouthill B8960B2Second Floor Electrical B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 E3.2Second Floor Elec.Electrical Legend For Electrical Purposes Only Switch and Receptacle Locations May Vary Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Selected Options EstateSouthill B8960B2First Floor Framing B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 S1.1First Floor FramingLegend Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Selected Options EstateSouthill B8960B2Second Floor Framing B Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033 S1.22nd Floor FramingLegend Homesite-Specific Plan SetGenerated on: 6/5/202007/27/20 William Hohlt Legacy Ridge, Lot 1156792 Grantsville Lane, Carmel, IN 46033EstateSouthill B8960B2Typical Rim Board Closure Typical Squash Block Detail Typical Point-Load Detail Hanger Detail at Solid BeamI-Joist Brick Cantilever Detail Typical I-Joist Cantilever Detail Hanger Detail at I-Joist Brick Cantilever Detail D-3Floor Framing DetailsHomesite-Specific Plan SetGenerated on: 6/5/2020Typical I-Joist Load-Bearing Cantilever Detail 07/27/20 William Hohlt Frame Business Partner Community & Home Site Construction Manager Frame Checklist Frame Check Garage FC ______ FC ______ CM ______ Frame, House Interior Attic Access location correct per Print, access has 14 inch sides if an insulated attic. Check size of Gables Access. Post plumb and strapped to beam at top Garage beam will be sealed to prevent air infiltration to floor space after Drywall is hung Walls in Attic have sheathing installed All panels are taped in Attic & Verticals Taped. House band board in garage attic has insulated sheathing installed House wrap installed at Band system in Garage and pulled down Truss bracing installed if required 2x Framing for trusses/girders nailed directly house to framing without foam sheathing between frame members Truss hanger’s nailed completely with required nails Garage door opening correct size and location Smart trim at bottom of door at concrete is ¼ inch off of concrete Anchor bolts in garage plate installed 12 inches from each plate end at foundation and not more than 6 foot on center and 12 inches from corner. Garage Portal frame 2x2 square washers in place at door. Nuts tight. Garage steps are of equal rise to top of door threshold from garage floor. Not more than 8 ¼ rise Sill sealer installed under wall or floor system between house and garage Garage door bucks installed floor to ceiling in 1 piece 2x6 minimum. Buck is not to be in contact with concrete nailed 12 inches on center Garage door buck installed above door 1 piece 2x6. 2x10 installed above center of door to ceiling for garage door opener nailed 12 inches on center Estate/Side load electrical panel walls build if required. Note these walls may not be on print. OSB is cut back 2 inches on each side of ridge, Ripper row no less than 2' at Peak. Bowed studs are marked. Note these markings may be visible to customer if garage in not finished Garage to house door set with 3 shims on each side and/or Exerior Service Door. Drywall nailer in place on ceiling and corners/check for insulation access. Garage door Portal framing correct per IRC 2008 Indiana amendments. Truss to girder connection 1/4" or less Solid Bearing. Truss Drawings and print hung in Garage Girder truss bearing is complete to foundation Garage to house door set with correct reveal 6 shims total Bowed studs checked and marked in orange on the stud and floor with a B Check each room per print for wall and door opening placement Check each room for window placement. Check walls for plumpness mark correction using OOP OOL Windows centered in the opening shim sides if needed window to sit on sill with 1/8 bumper on bottom. Does the window operate smoothly Mark each doorway with correct door size and swing Example of how to mark… 2/6 RH with an arrow. Mark in writing if an opening wraps in drywall wright the word out Drywall wrap or do not drywall or Wood wrap. Add cabinet dimensions to verify correct wall length Layout CL of range hood location vertical and horizontal. Layout cabinet locations in kitchens and baths. Verify correct space for cabinets Think about outlet/switch location in kitchen. Are all location either under cabinets or outside of cabinets? This has to do with backsplash tile Think about the locations for the outlets in bathrooms, no outlets in side splashed or behind mirrors. Check ½ wall height to be certain it is tall enough to allow casing and vanity side splash to not interfere same applies in home office area Check to be sure toilet and shower drains do not interfere it the Joist locations Verify correct walls or no walls are installed at stairway, walls vs rails. Check floor joist layout for correct placement Check roof truss layout for correctness Check for correct truss bracing, note you will need truss drawings for this. Additionally correct overlapping is required at brace connections Shower pan blocking is in place Stud placement in a shower location is to be no more than 16 inches O.C Drywall nailers are in place in corners all locations Drywall nailers are in place at ceilings. Parallel wall to trusses should be cross blocked 2 foot OC laid out for drywall placement Floor decking nailed and glued Nails 4 in the field 6 on the seams missed nails need pulled Floor joist are nailed and glue is present in hangers Air sealing in dead cavities is complete Stairs are secures with 2-16d nails from back of stringer. No visible nails from the top. Roof decking is gapped on 4 foot ends 1/8 to ¼ inch. Nailed 4 in the field 6 on the edge Exterior doors are to be shimmed with 3 places each side for a 6/8 door 4 each for a taller door or a door with a transom. Ensure finish width of Halls, landings will be 36 inches. Nailers for Tub Flange (32 inches for tub shower & 34 inches for fiberglass shower) CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______07/27/20 William Hohlt Frame Check Basement Finished Basement Post plumb and tabs wrapped around the top Post locations are correct, point loads from above in floor system installed Beam is bearing in pocket at least 3 inches Squash block are in place from over beam if there is a load bearing wall above. No visible gaps in basement rim board Floor joist laid out per print, LVL beans if needed are located in correct location. Look for nails that have missed the joist and remove them Joist hangers are secure with correct nails and joist are glued Straps at bottom plate secured with 2 nails each strap on top and spaced 12 inches from plate ends and corners 6 feet on center. Basement is clean no debris Basement stairs are shimmed ½ inch from wall. There are no visible nails from top through stringer. All nails are driven through 2x from under stairs. 3 Nails per step. Stair Head height is correct. At minimum 6’8 inches in a plane diagonal line to stair header plumb. Nosing not at top of stairs at first floor but is present and basement landing if stair case has a landing Basement wall at basement landing is furred out with 2x material and wall is covered with insulation board or house wrap. This depends on the space available. Unfinished basement stair walls have 2x4 stud’s 16 inch OC on all 3 sides to close accessibility Basement wall secured to floor with concrete nails and walls are plumb. Door opening plumb and marked with 2 inch over call size of door 2 inches taller 2x4 studs 16 inches OC treated bottom plate Drywall nailers present in in corners and at ceiling All unfinished space must have a door opening into the area. Bulkheads build shall be no lower than 7’ 1 inch from concrete floor. Fire block weed cap above framed wall filling gap to bottom of joists. Daylight Walkout Basement Exterior To the bottom of a daylight window there in not more than 42 inches to the opening. 100% braced sheathing used. Wall must meet bracing requirements of 2008 IRC. This means consideration for full 4 foot sheets. Wall cannot be all windows. Proper nailing pattern of braced sheathing. Sill sealer is located under exterior walls. Walls are bolted per the 2008 IRC 12” plate ends 6 ‘OC Any stud distance from concerate wall & each step wall face will need to have concrete wall insulation installed. All horizontal seams flashed with house wrap a minimum of 6 inches hanging out Holes and cuts in sheathing repair by tape or damaged sheathing replaced Window tape install on 3 sides, 2 sides first and top last. Top must be even past the sides. No tape or sealer on bottom. Over hangs on home correct per print. Eyebrows installed per print Windows correct per print and are in alignment Exterior trim to be installed no closer to a shingled roof than 1 inch. Account for shingle thickness All trim installed has the vertical ran past the horizontal at the intersections. All horizontal smart trim used in board and batten style application must be installed prior to MDF board and have drip cap installed over the horizontal 5/4 trim board. Board batten panel is to be installed between the horizontals with ¾ trim over MDF to create the vertical. Azeck trim installed at under doors on basement homes 1x2 trim installed at horizontal brick transitions Window mantles install with Ice and water behind. Ice and water to extend 6 inches past sides and top and is taped at top House wrap install with overlaps of 6 inches horizontal and vertical Vertical seams of house wrap need taped with correct brand seathing tape House warp install on all inside & outside corners House wrap install with cap nails no more that 32inch square Raptor roof paper installed professionally verticle laps are to be a minimum of 4 inches, horizontal laps 6 inches, cap nails at seams 12 inches OC 24 inch cap nails on seams. Raptor paper to be installed to create a valley that sheds water by laps Roofer to install roof edge under raptor at eaves and over paper gables. Plan nail placement accordingly Roof less than 4/12 must have 2 layers of felt. Exterior door trim to be taped as windows. Exterior doors to be sat on rubber membrane that drapes to the exterior Rubber membrane to be installed so after concrete is poured it will be between the concrete and the house Gutter overhang or porch tiding back to verticle wall should have Ice & Water installed @ transition. FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ FC ______CM ______ Notes: 07/27/20 William Hohlt