HomeMy WebLinkAbout12955 Old Meridian St - Site Parking + Signage C5-2NEW BUILDING ADDITION
5,940 SQ FT
FINISHED FLOOR ELEVATION: 856.20
PI
V
NEW BMP
EASEMENT
ACCESSIBLE PARKING SIGNAGE (TYP OF 2)
SHORT TERM
BIKE PARKING
(4 SPACES)
50.
5'76.1'62.9'
ZONED: UC
JR FARMER FINANCE
ZONED: R1
CARMEL CLAY SCHOOLS
ZONED: UC
JR FARMER FINANCE
ZONED: UC
KG MAIN LLC
JPS Consulting Engineers - K:\Civil Projects\19JPSC26 Meridian Design Center\Drawings\C5-2 Parking + Signage.dwg September 17, 2019 - 2:32 PM NvergatosOVERALL SITE
PLAN, PARKING
AND SIGNAGE
1" = 20"
NBV
NBV
NBV
C5-2
CONSTRUCTION
DOCUMENTS
19 AUGUST 2019
19JPSC26
0 20 40
FEET
SCALE:1"=20' LOADING BERTHTOTAL BUILDING AREA = 5,940 SF
REQUIRED RATIO = 1 SPACE PER 200 SF
TOTAL SPACES REQUIRED = 30
EXISTING PARKING REMOVED ON-SITE= 33
STANDARD PARKING (9'X18') ON-SITE USE = 41
ADA PARKING PROVIDED = 2 (1 VAN)
TOTAL PROPOSED PARKING = 43
PARKING DATA
TOTAL LOT SIZE = 98,982 SF
TOTAL BUILDING FOOTPRINT = 5,940 SF
BUILDING COVERAGE RATIO = 0.06
TOTAL IMPERVIOUS PAVEMENT = 24,393 SF
IMPERVIOUS PERCENTAGE = 81.16%
TOTAL DISTURBED AREA = 0.69 AC
LOT COVERAGE
08/04/20