HomeMy WebLinkAboutA030.02'-6" 4 1/2" 3'-1 1/4" 2'-3" 7'-0"3'-0" 4" 3'-8"6'-6" FIELD VERIFY1"
21 SQ FT
FIELD VERIFY MIRROR AND
LIGHT FIXTURE INSTALL
HEIGHTS
1'-6" 2'-0" 1'-4 1/8"3'-5" 1'-5 3/4"6'-6" FIELD VERIFY PLUMBING32 SQ FT
3 SQ FT
INSTALL NEW 3X6 SUBWAY TILE
WITH SHLUTER FOR EXPOSED
EDGES AND AROUND NICHE FRAME
RUN SHOWER WALL TILE
THROUGH NICHE AND FRAME
WITH WHITE L-STICK TO
MATCH
FIELD VERIFY INSTALL HEIGHTS
FOR NEW SHOWER PLUMBING
5'-5" 4 1/2" 2'-6"7'-0"21 SQ FT
SCHLUTER FOR EXPOSED
EDGES
FIELD VERIFY INSTALLATION
HEIGHTS AND PLACEMENT OF
ALL ACCESSORIES WITH H.O.
2'-4"5"7'-0" +/-6'-2"INSTALL NEW CLEAR GLASS
SHOWER DOOR WITH
CHAMPAGNE BRONZE
HARDWARE
FIELD VERIFY ACCESSORY
LOCATIONS FOR HARDWARE
#1
of
10
Date:
3.5.20
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Goldman ResidenceBasement RemodelDana & Mitchell Goldman14051 Knightstown Dr. West, Carmel, IN 46033Approved By:
Date:
A501
FINAL
#4
2.27.20
6.15.20
7.6.20
PROPOSED INTERIOR ELEVATIONS
SCALE: 1/2" = 1'
Maggie Smith
Designer
msmith@caseindy.com
AA
Sydney Spurgeon
Project Developer
sspurgeon@caseindy.com
#2
CC
#3
BB
DD
08/10/20
Adam Schriner