HomeMy WebLinkAboutGN010.0#1
of
10
Date:
3.5.20
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Goldman ResidenceBasement RemodelDana & Mitchell Goldman14051 Knightstown Dr. West, Carmel, IN 46033Approved By:
Date:
G002
FINAL
#4
2.27.20
6.15.20
7.6.20
Maggie Smith
Designer
msmith@caseindy.com
Sydney Spurgeon
Project Developer
sspurgeon@caseindy.com
GENERAL / CONSTRUCTION NOTES
DDEEMMOOLLIITTIIOONN NNOOTTEESS EELLEECCTTRRIICC NNOOTTEESS
BASEMENT GENERALBASEMENT GENERAL
R/H ALL EXISTING CARPET & CARPET PAD IN BASEMENT
DEMO WALL PER PLANS FOR NEW BARN DOOR OPENING
R/S DOOR & HARDWARE FROM EXISTING STORAGE SPACE; TO BE REINSTALLED IN NEW LOCATION
PPRROOPPOOSSEEDD NNOOTTEESS
BASEMENT GENERALBASEMENT GENERAL
FRAME FOR NEW 2X4 WALLS ACCORDING TO PLAN; FRAME FOR (1) NEW 28x80 DOOR TO BATHROOM, (1)
SALVAGED 30x80 DOOR TO UNFINISHED STORAGE, (1) NEW 48x80 BEDROOM CLOSET DOOR & (1) NEW BARN
DOORS
INSULATE NEW WALLS FRAMED AT EXTERIOR BASEMENT WALLS WITH STANDARD R-13
FRAME NEW HEADER AROUND STEEL BEAM IN BEDROOM
F/I NEW DRYWALL FOR ALL NEW WALLS AND CEILINGS PER PLANS
F/I NEW BASE & SHOE FOR NEW BEDROOM, BATHROOM HALLWAY, AND BATHROOM SPACE
FURNISH AND INSTALL NEW CASING AND JAMB FOR NEW BASEMENT BEDROOM WINDOW
F/I NEW DOORS PER PLANS TO CLOSELY MATCH EXISTING; INCLUDES NEW CASING, JAMB & HARDWARE
REINSTALL SALVAGED DOOR IN NEW LOCATION PER PLANS; INCLUDES NEW CASING, JAMB, & REINSTALLED
HARDWARE
BASEMENT BATHBASEMENT BATH
INSTALL NEW EJECTOR PUMP TO EXISTING PIT
F/I NEW SUPPLY LINES AND P TRAP FOR (1) UNDERMOUNT SINK & SINGLE HOLE FAUCET IN EXISTING BASEMENT
ROUGH LOCATION
F/I NEW TOILET IN EXISTING BASEMENT ROUGH IN LOCATION
F/I NEW DRAIN LOCATION FOR MUD PAN; CUT AND FILL CONCRETE AS NEEDED FOR NEW DRAIN
F/I NEW NEW ROUGH IN VALVE & SUPPLY LINES FOR SHOWER; F/I NEW VALVE TRIM; F/I NEW SHOWER HEAD
F/I CONCRETE BOARD & PREP FOR TILE ON SHOWER WALLS & FLOOR; F/I NEW CUSTOM MUD PAN
F/I NEW 3X6 PORCELAIN TILE ON SHOWER WALLS W/ METAL TRIM FOR EXPOSED EDGES & TO FRAME SHOWER
NICHE
F/I NEW PENNY TILE FOR SHOWER MUD PAN; INSTALL IN BACK OF NICHE ALSO
F/I NEW VANITY CABINET & HARDWARE
FURNISH AND INSTALL NEW COUNTERTOP WITH 4" SPLASHES
FURNISH AND INSTALL NEW VANITY MIRROR
F/I NEW TISSUE HOLDER, TOWEL BAR & ROBE HOOK
#2
#3
BASEMENT BATHROOMBASEMENT BATHROOM
F/I (1) NEW VANITY SCONCE FIXTURE & (1) NEW RECESSED CAN ON NEW DIMMER SWITCH
F/I (1) NEW EXHAUST FAN/ CAN COMBO ON NEW SWITCH
F/I (1) NEW GFCI OUTLETS AT VANITY
BASEMENT BEDROOMBASEMENT BEDROOM
F/I (5) NEW RECESSED CANS IN NEW LOCATION ON NEW DIMMER SWITCH
F/I (1) NEW CEILING MOUNT FAN IN NEW LOCATION ON NEW SWITCH
F/I (5) NEW OUTLETS IN NEW LOCATIONS
BASEMENT UNFINISHED SPACEBASEMENT UNFINISHED SPACE
F/I (2) NEW BARE BULBS ON RELOCATED SWITCH IN UNFINISHED STORAGE SPACE
RELOCATE EXISTING BULB & SWITCH TO NEW LOCATION