Loading...
HomeMy WebLinkAboutA000.2RELEASEO FOR CONSTRIlCTION � E N LARG E D F LOO R P LAN Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes CityofCarmel SCALE: 1/4" = 1'-0" r �un��\i lo•rvalM��' DATE: 08�� 3�20 2 25. 6-0• I2 a.. 5. 8. �. $.. ! 0 ��ENLARGED FLOOR PLAN SCALE: 1/4" = 1'-0" 47 105/8" � 4'-7 il2" � 9 ]I8 tu I , - -i . "'� e _ '• � m m___-__ �r � , ?+ J ,...1-..I < m i� 1'-T O ioa � 5,1915.F. � 10 9 25. 2� 3 il � I A201 A301 1/4" II 10'-4 3/4" I 10'-0 3/4•• 10'-0114" � 4 VT' iI .�__________________26'-11 5/8" A� T�P EXTERIOR �__-__-__-__-__-__-_ � i T _ � �20'-0 VT' �NEW GROCERY I zoa 48 \ � � ��� 19'-] il2" � 28_8 10'-0" 4'-21/4" 6"� EXTERIOR � 27 GENERAL PLAN NOTES: A. NOTIFVARCHITECTOFANVDIMENSIONALORPHYSICAL DISCREPANCIES ON �RAW WGS RELATNE TO CONDITIONS IN THE FIELD. RE�UESTCLARIFICATIONFROMARCHITECTPRIORTO PROCEEDING WITH WORK M THE AFFECTED AREA. B. CONTRACTOR SHALL PROVIDE PHVSICAL SAMPLES AND SHOP DRAWINGS FOR ALL NEW $TRUCTURAL AN� EXTERIORIINTERIOR FINISH MATERIALS TO ARCHITECT FOR REVIEWIAPPROVAL PRIOR TOORDERINGIFABRICATION AND INSTALLATION. FLOOR PLAN NOTES: 0 1. STAW ED / SEALED CONCRETE FlNISH M EXPOSED FLOOR AREAS IN NEW NEEOLER'$ GROCERV $PACE I$ TO BE PROVIOE� BY GC IN THIS PROJECT SCOPE (LANDLORD SHELL/TENANT FINISH WORK). FLOOR FlNISH WORK WILL NEED TO BE COORDINATED WITH TENANT RNISH CONTRACTOR AND SEQUENCE OF TENANT FINISH WORK. FLOOR FINISH WORK WILL NOT GOMMENCE UNTIL ALL NEW SLAB CUTS FOR NEW UNDERSLAB UTILITIES ARE COMPLETE COOROINATE WITH ARCHITECT FOR AREAS THAT ARE TO RECEIVE STAIN I SEAL V5. AREAS THAT HAVE OTHER �A FLOORCOVERINGS. ( 29 � 2. NO NEW FLOOR FINISH OR STAINED / SEALED CONCRETE IN Y THIS FUTURE TENANT AREA FLOOR FlNISHES TO BE INSTALLED AS PART OF FUTURE TENANT WORK. i 3. NEW AUTOMATIC SLIDING DOOR PACKAGE AND SIDELITE I TRANSOM WINDOW. SEE DOOR / WINDOW SCHEDULE. 4. NEWDARKBRONZEALUMINUMSTOREFRONTWINDOW. SEE EXTERIOR ELEVATIONS, WINDOW SCHEDULE. 8�_� S EXISTING WINDOW FRAME TO REMAIN. REMOVE AND REPLACE GLASS THAT HAS 1"MUNTINS WITH STANDARD CLEAR 1" LOW-E GLASS IN EXISTING FRAME. REPAIR ANV DAMAGED 5•_g• 8� SECTIONS OF STOREFRONT. CAULKALL EXISTING WINDOW PERIMETER. ' �p 6. NEW DARK BRONZE ALUMINUM STOREFRONT ENTRANCE AND SIDELITE / TRANSOM WINDOWS. SEE DOOR I WINDOW SCHEDULE. 7. NEWEXTERIORCOLUMNCONSTRUCTION: -8" STEEL TUBE COLUMN - SEE STRUCTUR4L DWGS -5/8" EXTERIOR GRADE PLVWOOD ATTACHED TO COLUMN Q1 -BUILDING WR4P OVER EXTERIOR GRADE PLYWOOD m _ -AIR SPACE I MASONRY WALL TIES __ __8 _ -MODULAR FAGE BRICK TO BE PAINTED PER EXT ELEV NOTES - P. 7 -TOTAL EXTERIOR DIMENSIONS FROM FINISH FACE TO FINISH 9 � FACE = 1'-7 SB". � '�, �. -TVPICAL. A3�A' �' NOTE: m� �'�, -FORCOLUMNSAGAINSTBUILDING,PROVIDE2"SPACE Q BETWEEN EXISTING EXTERIOR FACADE AND FACE OF NEW �' �� STEEL WLUMN. PROVIDE METAL STUDS TO INFILL GAP AND � �5 ) �� PROVIDE 1/2" EXPANSION MATERIAL BETWEEN NEW/ � EXISTING BRICK. 8. DASHED LINE HERE INDICATES EXTERIOR LINE OF EXISTING 0 FASCIA/OVERHANG. 9. �ASHED LINE HERE INDICATES NEW FASCIA I TERMINATION OF R. q EXISTING OVERHANG AT NEW ENTRANCE FEATURE. SEE � SECTIONS. 10. DASHED LINE HERE INDICATES OUTLINE OF NEW ENTRANGE FEATURE ROOF OVERHANG ABOVE. 11. EXTERIOR SIDEWALK / SITE IMPROVEMENTS TO BE ISSUED IN SEPARATEPACKAGEBYOTHERS. 12 NEWSTEELCOWMN-$EESTRUCTURALDRAWWGS. 13. NEW INTERIOR CONCRETE SLAB IN THIS AREATO FINISH FWSH WITH EXISTWG / ADJACENT CONCRETE - SEE STRUCT DWGS. 14. NEW EXTERIOR WALL BUILDOUT: -FOUNDATIONSPERSTRUCTURAL -6" METAL STUO FRAMING AT i6" O.C. W/ BATT INSULATION -5/8" PLVWOO� OR O56 EXTERIOR SHEATING -BUILDING WRAP AIR $PACE -MODUL4R BRICK MASONRY - RUNNING BOND - PANT PER ELEVS -5/ B" GYPSUM BOARD ON INTERIOR FACE OF STUDS -PROVIOE 2X W000 BLOCKING AROUNO PERIMETER OF NEW ENTRANCE 15. EXISTING EXTERIOR WALL CONSTRUCTION TO REMAIN. PREP AND PAIM EXTERIOR FACE OF EXISTWG BRICK - SEE EXTERIOR ELEVATIONS. i6. NEW EXTERIOR WALL BUILDOUTTO INFILL FORMER WINDOW OPENINGS: -fi" METAL STUD FRAMING AT 16" O.C. W/ BATT INSULATION -5/8" PLVWOODOROSBEXTERIORSHEATING -BUILDING WRAP AIR SPACE -MODULAR BRICK MASONRV - RUNNING BOND - PANT PER ELEVS TOOTH IN MASONRY AT E%ISTING JAMBS - FINISH FLUSH W ITH EXISTING ADJACENT MASONRY. -5/8" GVPSUM BOARD ON INTERIOR FACE OF STUDS FINISH FLUSH WITH ADJACENT EXISTING GVPSUM BOARD. 10'-0 1/4" 1'�5 1/2" '� 41/2" �9]IS" � 101I8' ______________ ______I�____: II� II _-'_p_ _ -__-__-__-__-_ �__ _-__ 3 I�� � �� ��, 13 49 1 A30� , 5,_9,. 4'-11114" , , , 91/4•• � 2 � � I A103 14 �••_•••s TVP • ' I �N _'-_ _-_-_ _ 11_ _-_-_ _-_-_- _ III 11_ _ � � � 3 VJ AJ A103 TVP � � -_ _-_ _ � _ _-_ _-_ _-""-""-_-_ _-_ _-_ _-_ _-_ _-_ _-_ _-_ _-_ I FUTURETENANT �� ENLARGED FLOOR PLAN SCALE: 1/4" = 1'-0" � �� � I� � � �-__-__-_ -__�-_-_i-__- I „ I I ,o I 15 I Q9 �-"-1-" ""�""�""-" 11. NEW EXTERIOR WALL BUILDOUT TO WFlLL FORMER WINDOW �� OPENINGS: -6" METAL STUD FRAMING AT i6" O.C. W/ BATT INSULATION ���% -5/8"PLVWOODOROSBEXTERIORSHEATING / -BUILDING WRAP � m a Y - - � -AIR SPACE P -MODUL4RBRICKMASONRV-RUNNWGBOND-PANTPERELEVS TOOTH IN MASONRV AT EXISTING JAMBS - FlNISH FWSH WITH EXISTING ADJACENT MASONRV. -5/8" GVPSUM BOARD ON INTERIOR FACE OF STUDS FlNISH RUSH WITH ADJACENT EXISTING GYPSUM BOARD. -� 18. 8"X8" STEEL TUBE GOLUMN - SEE STRUCTURAL DRAWINGS. Q 19. 5l8"EXTERIORGRADEOSBORPLVWOODSHEATHINGATTACHED TO STEEL COLUMN. _ �\ 20. CONTINUOU$ BUILDING WRAP OVER SHEATHING. R 1 21. MASONRY WALLTIES. � 22. AIRSPACE. 23. MODULAR FACE BRICK TO BE PAINTED PER EXT ELEV NOTES. 24. il2" EXPANSION MATERIAL BETWEEN NEW AN� EXISTING BRICK o �_� MASONRY. 25. 3 Sl8" METAL STUD FRAMING AT SPACE BETWEEN STEEL COLUMN � AND EXISTING MASONRV. �__-_�__-__-__� � m EXTERIOR w � � � U W � _ UN I..L � � uJ CONSTRUCT�orvooCumervTS �°ia.i"ssc(�a i "�° i�va�re°�'mae ��s: e 'a"ms. �oa*eisweo�. s�a.zoao Evi6i0N6iS5UEP ARCHITECTI LANDSCAPE ARCHITECT: SITE ARCHITECTURE PROJECTCONTACT�. �RA�SMITH,RA LCC�AP 13144 EAST iB6TH STREET Nos�[sviu[. w. asoso PH�. 3P3]6.BD0 bMHIL �20LAstlearclitlaclu� mm STRUGTURALENGWEER: STROCTORAL OESIGN, INC. aaodmi caNinci�. CHARLESP SCHAEFER. P.E. �n� w us sz swTe e NEW PALESTINE M.46163 PH'.3P_061 ]930 EJNAIL cscM1aeler@s�mtltlesign com MEP ENGINEER: THE ENGINEERING COLLAB00.ATIVE PROJECT CONTACT�. SAMHURT,RE. zaio ExECurrvE oarvE suirE ioa INDIANAPOLIS W.4624� PH139_636904t EJNAIC sem@�eomep wm N wC C W � Q � NaL Q � r J�w aZ� Q � � H.^ o,A W W � t � Z ��y J O�aw � ~ N � mW�c� ENLARGEDFLOOR PLANS A102 2019-031