Loading...
HomeMy WebLinkAboutA000.24GYMBOREE ]00 � EXTERIOR 1 D207 EXTERIOR 7� D106 P � VACANT MATCHLINE j """""""""'_\/ 600 CVS a i aoo J z ozo� OGLE DESIGN 5�a �� � EXTERIOR I� 9 10 71 12� � ENLARGED PLAN RELEA5E0 FOR CONSTRUCTION 1'-0" Su6ject �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��_ DATE: 08�� 3�20 2� � � 6� 13 iJ 15 16 7 7 GENERAL DEMOLITION NOTES: A. ALLEXISTINGCONSTRUCTIONTOREMAINUNLESSOTHERWISE NOTED. B. SEE MEP DRAWINGS FOR SCOPE OF MEP DEMOLITION. Q NOTIFYARCHITECTOFANVDIMENSIONALORPHYSICAL DISGREPANCIES BETWEEN EXISTING CONDITIONS AND REPRESENTATIONS IN THE DRAWINGS FOR CLARIFICATION PRIOR TO PROCEEDING WITH WORK IN THE AFFECTED AREA. D. CONTRACTORSHALLGOORDINATEWORKTIMESANDPOWERI SERVICEINOISE DISRUPTIONS WITH OWNER PRIOR TO COMMENqNG WITH WORK. E CONTRACTOR SHALL PROVIDE TEMPORARV PROTECTION OF E%ISTING FlNISHES AND EQUIPMENTAS NEEDED DURING �EMOLITION/CONSTRUCTION. ANV DAMAGE TO EXISTING CONSTRUCTION SHALL BE RESTORED BV CONTRACTOR TO NEW CONDITION PRIOR TO COMPLETION OF CONSTRUCTION. DEMOLITION PLAN NOTES: oX 01. REMOVE COOLER FIXTURE IN ITS ENTIRETY. 02. REMOVE SHELVING FIXTURE IN ITS ENTIRETV. D3. REMOVE FRAMED WALL IN ITS ENTIRETY. 04. REMOVE �OOR IN ITS ENTIRETV. D5. REMOVE PORTION OF WALL TO ACCOMMODATE NEW STOREFRONTWIN�OW. SEEOEMOELEVATIONS,SECTIONS,AND NEW WORK PLANS. D6. REMOVE OFFlCE STRUCTURE IN ITS ENTIRETV. �]. REMOVE CHECK-OUT IN ITS ENTIRETV. 08. REMOVE EXTERIOR WALL TO ACCOMODATE NEW STOREFRONT WINDOW. SEE DEMO ELEVATIONS, SECTIONS, AND NEW WORK PLANS. �9. REMOVE MASONRY RREPLACE IN ITS ENTIRETV. D10. REMOVE CASEWORK IN ITS ENTIRETY. Dii. REMOVESWK,FAUCET,ANOASSOQATEDITEMSINTHEIR ENTIRETY D12 REMOVE PLUMBING FIXTURES, ACCESSORIES, AND ALL FlNISHES IN THEIR ENTIRETV. D13. REMOVE ALL FLOOR FINISHES IN THEIR ENTIRETY. D14. REMOVE PORTION OF WALL TO ACCOMMODATE NEW WORK. D15. REMOVE ALL LOOSE FlXTURES I FURNITURE. D16. REMOVECOLUMN.SEE�EMOLITIONELEVATIONSAND DEMOLITION SECTION. 017. REMOVE LEAN-TO STRUCTURE IN ITS ENTIREN. D18. REMOVEPORTIONOFCONCRETESLAB. D19. REMOVE STAIR IN ITS ENTIRETV. D20. REMOVE MEZZANINE IN ITS ENTIRETV. SEE MEZZANINE DEMOLITION PLAN. 021. CWLERTOBEREMOVED. COOROINATEWITHOWNERONTHE SALVAGE OFCOOLER PANELS,COMPONENTS,ETC. D22 COMPRESSORS AND RACKING TO BE REMOVED. D23. REMOVECOOLERDOORSANDFRAMES. 024. REMOVE WIN�OW AND FRAME IN THEIR ENTIRETV. �25. REMOVE COOLER DOOR DRAPES FRAME IN THEIR ENTIRETY. 026. EXISTING EXHAUST HOOD TO REMAIN. PROTECT DURWG �EMOLITION. 027. REMOVE MISCELLANEOUS SHELVING IN ITS ENTIRETY. 028. EXISTING WINOOW FRAMETO REMAIN. REMOVEAN� REPLACE GLASS THAT HAS 1" MUNTINS WITH STANDARD CLEAR 1" LOW-E GLASS M EXISTING FRAME REPAIR ANV DAMAGED SECTIONS OF STOREFRONT. CAULK ALL EXISTING W INDO W PERIMETER. 029. DEMOLISH PORTION OF WALL ANO ROOF FRAMING TO ACCOMMODATE NEW ENTRANCE STRUCTURE. SEE DEMOLITION SECTION. 030. DEMOLISHPORTIONOFCORNERROOFANOSOFFITSTRUCTl1RE IN ITS ENTIRETV. SEE NEW WORK PLANS. D31. DEMOLISHPORTIONOFBRICKOVERBUILDAREABACKTOMAIN WALL IN ITS ENTIRETV. SEE NEW WORK PLANS. 032. DEMOLISH EXISTWG FINISHES IN THIS AREA. w � � U W � 2 U � a LW 1 v ! corvsraucriorvoocomerv*s Sn� ilnl�ab�9a^�C�liyol eiPian w. �u �6$ID2O ARCHITECTI LANDSCAPE ARCHITECT: SITE ARCHITECTURE aHa�ecrcarvrncr�. eknosmiTn, kn I �eeoaa ietaa Ensr iaerH sTaeer rvoa�esva�e.w.nsaeo pH�.31 ] 3]0 0]ID �"iHIL �20LAstlea¢lil�aclu� mm STRUGTURALENGWEER: STROCTORAL OESIGN, INC. Peo�eci mminci�. cHna�[s v. scHn[r[rt e� �n� w ussz swTe a NEW PALESTINE M.46163 aw. aizeei nae bMAIC. cscM1ae(er@s�mtltlesign com MEP ENGINEER: THE ENGINEERING COLLAB00.ATIVE PROJECT CONTACT�. SAM HURT, RC. znio exwurive oarve suire wo iNoinNnvous, w.as�ai vH: aizaas �ai e-�nAlc. sem@teomep mm NL i Z W G W i Q°� Na Qg� J�w aZ� a ���o � � � + � Z � � y J O�aw � ~ N � m W � V FIRST FLOOR OVERALL DEMOLITION REFERENCE PLAN ♦ ENLARGEDPLANS D100 2019-031I ��FIRST FLOOR OVERALL DEMOLITION REFERENCE PLAN SCALE: 1/32" = 1'-0"