HomeMy WebLinkAboutA000.24GYMBOREE
]00
�
EXTERIOR
1
D207
EXTERIOR
7�
D106
P
�
VACANT MATCHLINE j
"""""""""'_\/
600 CVS
a i aoo J
z
ozo�
OGLE
DESIGN
5�a
��
�
EXTERIOR
I�
9 10 71 12�
� ENLARGED PLAN
RELEA5E0 FOR CONSTRUCTION 1'-0"
Su6ject �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��_
DATE: 08�� 3�20
2� � � 6� 13 iJ 15 16
7 7
GENERAL DEMOLITION NOTES:
A. ALLEXISTINGCONSTRUCTIONTOREMAINUNLESSOTHERWISE
NOTED.
B. SEE MEP DRAWINGS FOR SCOPE OF MEP DEMOLITION.
Q NOTIFYARCHITECTOFANVDIMENSIONALORPHYSICAL
DISGREPANCIES BETWEEN EXISTING CONDITIONS AND
REPRESENTATIONS IN THE DRAWINGS FOR CLARIFICATION PRIOR
TO PROCEEDING WITH WORK IN THE AFFECTED AREA.
D. CONTRACTORSHALLGOORDINATEWORKTIMESANDPOWERI
SERVICEINOISE DISRUPTIONS WITH OWNER PRIOR TO
COMMENqNG WITH WORK.
E CONTRACTOR SHALL PROVIDE TEMPORARV PROTECTION OF
E%ISTING FlNISHES AND EQUIPMENTAS NEEDED DURING
�EMOLITION/CONSTRUCTION. ANV DAMAGE TO EXISTING
CONSTRUCTION SHALL BE RESTORED BV CONTRACTOR TO NEW
CONDITION PRIOR TO COMPLETION OF CONSTRUCTION.
DEMOLITION PLAN NOTES: oX
01. REMOVE COOLER FIXTURE IN ITS ENTIRETY.
02. REMOVE SHELVING FIXTURE IN ITS ENTIRETV.
D3. REMOVE FRAMED WALL IN ITS ENTIRETY.
04. REMOVE �OOR IN ITS ENTIRETV.
D5. REMOVE PORTION OF WALL TO ACCOMMODATE NEW
STOREFRONTWIN�OW. SEEOEMOELEVATIONS,SECTIONS,AND
NEW WORK PLANS.
D6. REMOVE OFFlCE STRUCTURE IN ITS ENTIRETV.
�]. REMOVE CHECK-OUT IN ITS ENTIRETV.
08. REMOVE EXTERIOR WALL TO ACCOMODATE NEW STOREFRONT
WINDOW. SEE DEMO ELEVATIONS, SECTIONS, AND NEW WORK
PLANS.
�9. REMOVE MASONRY RREPLACE IN ITS ENTIRETV.
D10. REMOVE CASEWORK IN ITS ENTIRETY.
Dii. REMOVESWK,FAUCET,ANOASSOQATEDITEMSINTHEIR
ENTIRETY
D12 REMOVE PLUMBING FIXTURES, ACCESSORIES, AND ALL
FlNISHES IN THEIR ENTIRETV.
D13. REMOVE ALL FLOOR FINISHES IN THEIR ENTIRETY.
D14. REMOVE PORTION OF WALL TO ACCOMMODATE NEW WORK.
D15. REMOVE ALL LOOSE FlXTURES I FURNITURE.
D16. REMOVECOLUMN.SEE�EMOLITIONELEVATIONSAND
DEMOLITION SECTION.
017. REMOVE LEAN-TO STRUCTURE IN ITS ENTIREN.
D18. REMOVEPORTIONOFCONCRETESLAB.
D19. REMOVE STAIR IN ITS ENTIRETV.
D20. REMOVE MEZZANINE IN ITS ENTIRETV. SEE MEZZANINE
DEMOLITION PLAN.
021. CWLERTOBEREMOVED. COOROINATEWITHOWNERONTHE
SALVAGE OFCOOLER PANELS,COMPONENTS,ETC.
D22 COMPRESSORS AND RACKING TO BE REMOVED.
D23. REMOVECOOLERDOORSANDFRAMES.
024. REMOVE WIN�OW AND FRAME IN THEIR ENTIRETV.
�25. REMOVE COOLER DOOR DRAPES FRAME IN THEIR ENTIRETY.
026. EXISTING EXHAUST HOOD TO REMAIN. PROTECT DURWG
�EMOLITION.
027. REMOVE MISCELLANEOUS SHELVING IN ITS ENTIRETY.
028. EXISTING WINOOW FRAMETO REMAIN. REMOVEAN� REPLACE
GLASS THAT HAS 1" MUNTINS WITH STANDARD CLEAR 1"
LOW-E GLASS M EXISTING FRAME REPAIR ANV DAMAGED
SECTIONS OF STOREFRONT. CAULK ALL EXISTING W INDO W
PERIMETER.
029. DEMOLISH PORTION OF WALL ANO ROOF FRAMING TO
ACCOMMODATE NEW ENTRANCE STRUCTURE. SEE DEMOLITION
SECTION.
030. DEMOLISHPORTIONOFCORNERROOFANOSOFFITSTRUCTl1RE
IN ITS ENTIRETV. SEE NEW WORK PLANS.
D31. DEMOLISHPORTIONOFBRICKOVERBUILDAREABACKTOMAIN
WALL IN ITS ENTIRETV. SEE NEW WORK PLANS.
032. DEMOLISH EXISTWG FINISHES IN THIS AREA.
w
�
�
U
W
�
2
U
�
a
LW
1
v !
corvsraucriorvoocomerv*s
Sn� ilnl�ab�9a^�C�liyol eiPian w.
�u �6$ID2O
ARCHITECTI
LANDSCAPE ARCHITECT:
SITE ARCHITECTURE
aHa�ecrcarvrncr�.
eknosmiTn, kn I �eeoaa
ietaa Ensr iaerH sTaeer
rvoa�esva�e.w.nsaeo
pH�.31 ] 3]0 0]ID
�"iHIL �20LAstlea¢lil�aclu� mm
STRUGTURALENGWEER:
STROCTORAL OESIGN, INC.
Peo�eci mminci�.
cHna�[s v. scHn[r[rt e�
�n� w ussz swTe a
NEW PALESTINE M.46163
aw. aizeei nae
bMAIC. cscM1ae(er@s�mtltlesign com
MEP ENGINEER:
THE ENGINEERING
COLLAB00.ATIVE
PROJECT CONTACT�.
SAM HURT, RC.
znio exwurive oarve suire wo
iNoinNnvous, w.as�ai
vH: aizaas �ai
e-�nAlc. sem@teomep mm
NL
i
Z
W
G
W
i
Q°�
Na
Qg�
J�w
aZ�
a
���o
� �
� + � Z
� � y J
O�aw
� ~ N �
m W � V
FIRST FLOOR
OVERALL DEMOLITION
REFERENCE PLAN ♦
ENLARGEDPLANS
D100
2019-031I
��FIRST FLOOR OVERALL DEMOLITION REFERENCE PLAN
SCALE: 1/32" = 1'-0"