Loading...
HomeMy WebLinkAboutA000.2889_10 // 2 �� GENERAL DEMOLITION NOTES: A. ALLE%ISTINGCONSTRUCTIONTOREMAINUNLESSOTHERWISE NOTED. B. SEE MEP DRAW INGS FOR SCOPE OF MEP DEMOLITION. G NOTIFYARCHITECTOFANYDIMENSIONALORPHYSICAL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND REPRESENTATIONS IN THE DRAWINGS FOR CLARIFICATION PRIO TO PROCEEDING WITH WORK W THE AFFECTED AREA. D. CONTRACTOR SHALL COORDINATE WORK TIMES AND POWERI SERVICEINOISE �ISRUPTIONS WITH OWNER PRIOR TO COMMENCING WITH WORK. E CONTRACTOR SHALL PROVIDE TEMPORARV PROTECTION OF EXISTING FINISHES AND EQUIPMENTAS NEEDED DURING DEMOLITION/CONSTRUGTION. ANV DAMAGE TO EXISTING CONSTRUCTION SHALL BE RESTORE� BY CONTRACTOR TO NEW CONDITION PRIOR TO COMPLETION OF CONSTRUCTION. ROOF DEMOLITION NOTES: �HATCHAREAINDICATESMATERIALS/AREATOBE DEMOLISHE�, $EE ASSOCIATE� NOTE FOR DESCRIPTION. Di. DEMOLISH EXISTING METAL COPING I WALL CAP. D2. DEMOLISH EXISTING METAL PANEL ROOF IN ITS ENTIRETV, INCWDINGASSOCIATE�TRIMS, EDGES, ETC. D3. �EMOLISH EXISTING GUTTER AN� DOWNSPOl1TS IN THEIR ENTIRETV D4. EXISTING ROOF MEMBRANE AND INSULATION TO REMAIN. PREPARE SURFACE FOR NEW ROOF OVERLAV SVSTEM. D5. �EMOLISH ROOF AN� ROOF FRAMING TO ACCOMMODATE NEW ENTRANCE STRl1CTURE. SEE DEMOLITION SECTION. D6. EXISTING ROOFTOP EQUIPMENTTO REMAIN. REMOVE EXISTING RTU'S, INCREASE CURB HEIGHT WHERE REQUIRED. INSTALL NEW FLASHING/RW F TERMINATIONS TO TIE INTO NEW ROOF OVERLA' SVSTEM. RESET EXISTING RTII'S ANO MAKE FULLV FUNCTIONAL. THIS PROCESS WILL RE�UIRED CLOSE COORDINATION WITH LANDLORD ANO EXISTING TENANTS. ATALL OTHER EXISTING ROOF PENTETRATIONS, INSTALL NEW BOOT/FLASHINGS TO BE INTEGRATED WITH NEW ROOF OVERLAV SVSTEM TO PROVIDE GONTINl10US WATERTIGHTNVARRANTIED ROOF SVSTEM. DZ EXISTING ROOF EXPANSION JOINT. INSTALL NEW EXPANSION JOINT MATERIAL AS NEEDED AS PART OF NEW ROOF OVERLAY SVSTEM. D8. DEMOLISH EXISTING ASPHALT SHINGLE ROOF IN ITS ENTIRETV, INCLUDWGASSOCIATEDTRIMS, EDGES, ETC. D9. �EMOLISH EXISTING LEAN-TO STRUCTURE IN ITS ENTIRETV. D10. SALVAGE EXISTING GUTTER AND DOWNSPOUT ON BACKISERVICE SIDE OF BUILDING. REPAIRAS NEEDED. PERIMETER RASHINGI TERMINATIONS TO BE INTEGRATED WITH NEW ROOF OVERLAV SVSTEM. DN. CREATE NEW ROOF PENETRATIONS AS RE�UIRE� IN THIS AREA FOR NEW TENANT RTU'S. SEE MECHANICAL DRAWINGS FOR NEW LOCATIONS AND STRUCTURAL DR4WING5 FOR STRUCTURALSTEEVSUPPORTDETAILS. D12. SEE MECHANICAL PLANS FOR SCOPE OF REMOVAL OF EXISTING ROOFTOPEQUIPMENT/PENETRATIONS. WHEREEQUIPMENTOR PENETRATIONS ARE REMOVED - MRLL EXISTWG METAL DECK WHERE REQUIRED AND PATCHIREPAIR ROOF TO BE COMPATIBLE HEIGHT WITH NEW ROOFOVERLAYSVSTEM. ww' I..L � � U W � 2 U � a W � Vl CONSiRIIGTION DOCIIMENTS ae�=.i�ss+remm eaiwm+P�,w a�iweaionYm��n��rco�re� . iu e. na w.a�� iEi95VE0�, 6-3.3020 ARCHITECTI LANDSCAPE ARCHITECT: SITE ARCHITECTURE PROJCCT CONTACT�. BRA� SMITH. RA I LEE� AP 1314<EAST i86TH STREET Nos�esviue. w. asoso PH�.31].3]4.8]20 EMHIL �20LAstlea¢litlaclu� mm STRUGTURALENGWEER: STROCTORAL OESIGN, INC. aaodecr coNrncr�. cHna�s v. scHneFea. v.e. nn w. us sn, swTe a NE W PALEST W 6 M. A6163 PH'.3P_0fi1 ]930 EJVIAIC. cscM1aeler@s�mtltlesign com MEP ENGINEER: THE ENGINEERING COLLAB00.ATIVE PROJEQ CONTACT�. SAM HURT RE. zaia execbnve oarve suiTe mo INDIANAPOLIS, W.A62<{ PH:31ZFiAfi 3901 e�mc sam@�o.riep �om Q N Q J a wN L�f. _ � � 0 0 � m M M O CC � Z J � � V w w � � � H tG N � � Q W � N ti � ROOF DEMOLITION PLAN RELEA5E0 FOR CONSTRIlCTION Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��_ DATE: 08�� 3�20 �1 ROOF DEMOLITION PLAN SCALE: 1" = 25'-0" D121 N H Z W � W i 0 � a � H z a z H ♦ � � � H LLI 2019-031