Loading...
HomeMy WebLinkAboutA000.33� 18 19 20 21 22 C \ J \ J � � � 10 � � 12 � CC �J GG HH C GENERAL DEMOLITION NOTES: A. ALL E%ISTING CONSTRUCTION TO REMAIN UNLESS OTHERWISE NOTED. B. SEE MEP DRAWINGS FOR SCOPE OF MEP DEMOLITION. C. NOTIFYARCHITECTOFANYDIMENSIONALORPHYSICAL 01SCREPANCIE$ BETWEEN EXISTING CONDITION$ AN� REPRESENTATIONS IN THE DRAWINGS FOR CLARIFICATION PRIC TO PROCEEDING WITH WORK W THE AFFECTED AREA. D. CONTRACTORSHALLCOORDINATEWORKTIMESANDPOWERI SERVICEINOISE DISRUPTIONS WITH OWNER PRIOR TO COMMENCING WITH WORK. E. GONTRACTOR SHALL PROVIDE TEMPORARV PROTEGTION OF EXISTING FINISHES AND EQUIPMENTAS NEEDED DURING DEMOLITION/CONSTRUCTION. ANY DAMAGE TO EXISTING CONSTRUGTION SHALL BE RESTORED BV GONTRACTOR TO NEW CONDITION PRIOR TO COMPLETION OF CONSTRUCTION. ELEVATION/SECTION DEMOLITION NOTES: �HATCHAREAINDICATESMATERIALS/AREATOBE DEMOLISHED,SEEASSOqATEDNOTEFOR DESCRIPTION. Di. DEMOLISH E%ISTING METAL COPING I WALL CAP. D2 DEMOLISH EXISTWG METAL PANEL SIDING / ROOF IN ITS ENTIRETV, INC W DING ASSOCIATED TRIMS E�GES, ETC. D3. DEMOLISH EXISTING GUTTER AN� DOWNSPOUT$ IN THEIR ENTIRETV D4. DEMOLISH EXISTING FASCIA IN ITS ENTIRETY. D5. DEMOLISH EXISTING WOOD PERIMETERTRIM ONLY. SIDING TO REMAIN. REMOVEANYSIGNAGEATTACHEDTOSIDING. COORDINATE SIGNAGE REMOVAVREPLACEMENT WITH LANDLORD/TENANTS. D6. DEMOLISH PORTION OF WALL TO ACCOMMODATE NEW STOREFRONT WINDOW. $EE NEW WORK PLANS ANO FRAME SCHEDULE. D�. DEMOLISH PORTION OF WALL AND ROOF FRAMING TO ACCOMMOpATE NEW ENTRANCE STRUCTURE SEE pEMOLITION sEorioN. D8. DEMOLISH PORTION OF WALL IN ITS ENTIRETV TO AGGOMMODATE NEW ENTRANCE STRUCTURE. SEE DEMOLITION SECTION. D9. DEMOLISH COW MN IN ITS ENTIRETY TO ACCOMMODATE NEW ENTRANCE STRUCTURE. SEE DEMOLITION SECTION. D10. REMOVE EXISTING DOORS, FRAME, AND HARDWARE IN THEIR ENTIRETV AT THIS LOCATION. D11. REMWEEXTERIORLIGHTFIXTURE,CIRCUITTOREMAINAND aE REusEo. sEE E�ECTRicn� oRa.wiNcs. D12 DEMOLISH EXISTING WALL CONSTRUCTION IN ITS ENTIRETY. D13. DEMOLISH EXISTING ROOF CONSTRUGTION IN ITS ENTIRETV. D14. DEMOLISH PER OEMOLITION CEILING PLAN. D15. DEMOLISH PORTIONOFCORNERROOFANDSOFFITSTRUCTURI IN ITS ENTIRETV. SEE NEW WORK PLANS. Di6. DEMOLISHPORTIONOFBRICKOVERBUILDAREABACKTOMAIN WALL IN ITS ENTIRETY. SEE NEW WORK PLANS. Di]. REMOVE PORTION OF WALL TO ACCOMMODATE NEW STOREFRONT WINDOW. SEE DEMO ELEVATIONS, SECTIONS, AN NEW WORK PLANS. Die. REMOVE WINDOW AND FRAME IN THEIR ENTIRETV. D19. REMOVE EXISTING OVERHEA� DOOR IN ITS ENTIRETV. D20. EXISTING WINDOW FRAME TO REMAM. REMOVE AND REPLACE GLASS THAT HAS 1" MUNTINS WITH STANDARD CLEAR 1" LOW-E GLASS W EXISTING FRAME (NO MUNTINS). REPAIR ANY DAMAGED SECTIONS OF STOREFRONT. CAULK ALL EXISTING WINDOW PERIMETER. D21. SALVAGE EXISTING GUTTER AND DOWNSPOUT ON BACKISERVICE SIDE OF BUILDING. REPAIR AS NEEDED. PERIMETER FLASHING/ TERMINATIONS TO BE INTEGRATED WITH NEW ROOF OVERLAV SVSTEM. D22. PREPARE EXISTING SURFACE FOR NEW PAINT. SEE NEW ELEVATIONS FOR RECOMMENDED TUCKPOINTINGIBRICK REPAIR AREAS. D23. REMOVE LEAN-TO STRUCTURE IN ITS ENTIRETV. wN L.I_ � � U W � 2 UN I..L Q � vi CONSTRUCTION �OCIIMENTS �°ia.i"ssc(�a i "�° i�va�re°�'mae ��s: e 'a"ms. �oa*eisweo�. e�a.zoao Fvi6i0N6i55UEP ARCHITECTI LANDSCAPE ARCHITECT: SITE ARCHITECTURE PROJECTCONTACT�. �RA� SMITH, RA I LCC� AP 13146 FqST i06TH STRFFT Nos�esviue. w. asoso PH�. 3P3]6.BD0 e-maic oao@sn�rmnac�� �om STRUGTURALENGWEER: STROCTORAL OESIGN, INC. aaodmr caNrncr�. CHARLES P. SCHAEFER. P.E. ,z„ w us s� su�,E a NEW PALESTINE M.46163 PH'3iZ061 ]93tl EJNAIL cscM1ae(er@s�mtltlesign com MEP ENGINEER: THE ENGINEERING COLLAB00.ATIVE PROJECT CONTACT�. SAMHURT,RE. zaw ExECurrve oarve, suirE i0o INDIANAPOLIS, W.462<� PH139_636-:194t EJNAIC sem@�eomep wm Q N Q a WN L�f. 2 � � 0 0 � m w � N H � N � � Q W � N ti � M M 0 � � Z J � � V EXTERIOR DEMOLITION ELEVATIONS RELEA5E0 FOR CONSTRIlCTION Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��_ DATE: 08�� 3�20 � SCALE: 3/16" = 1'-0" D205 NL i Z WC C W\ / ON IL a � z Q Z H ♦ � � � H LLI 2019-031 3 SOUTH DEMOLITION ELEVATION AREA M SCALE: 3/16" = 1'-0" 2 SOUTH DEMOLITION ELEVATION AREA L SCALE: 3/16" = 1'-0" SOUTH DEMOLITION ELEVATION AREA K