Loading...
HomeMy WebLinkAboutP000.1Plumbing 1. General: A. All work [o be in compliance with ihe Intliana Plumbing Gotle. Indiana Fccessibility Cotle antl all state antl local ortlinances. B. All applicable pwvisions of ihe Generel Conditions and ihe Generel Requiremenis for Meohanctal Work are a pan of thts seMion. 2 Scope ot Work: A Fumish all lebor, materials, aquipmant, supervision and services raquired for comple�a ins�alla�ion of plumbing service as requiretl �or comple�e ins�allation o� plumbing sys�ems as intliw�eQ speci�ietl or reasonably implietl. B. Sys[ems shall be comple�e, aperable ins�alla�ions. All work ro be tlone in accortlance with local antl national plumbing cotles. 3. General Fequiremen�s: A. Piping shall not be ins[alletl a[ lowtions having tluciwork until after air tluc[s are in place antl [his con�recbr shall be responsible lor rou�ing his work �o clear air duc�s as well as ligh� fixWres and equipmen� of other Vades. B. Rws of piping are in par6 tliagremmatiq and conirector shall run piping ro best fit field conditions. Field variation of scale dimensions oi drawings is required. Since acNal locations. dimensions antl levels will be governetl by archi�ecWlal tlfawings and actual fieltl condi�ions. G FiMures shall be ins�alletl so �ha[ connec�ing antl tlisconnec�ing of piping antl accessories can be matle reatlity antl par[s are easily accessible tor inspec�ian, opera[ions, maintenance antl repaic Provitle access panels where requiretl. 4. Shop Drawings: A. Review of shop tlrewings does not relieve Coniredor of responsibility for correct ortlering of material or equipment. B. Include all siqnificant tlata on shop tlrawinq submittals shown in Specifications and Equipment Schedules. C. Con��ac�or review should insu�e �ha� equipment will fit in�o available space. �. Submi� shop tlrawings in brochure form antl indutle all relatetl equipment in one brochure. E. Submi� �wo �2� copies more �han ConVaqor neetls for his use. Or, provide eledronic copies. F. Atter awartl o! conVact, submit wi�hin 30 tlays. G. Submi� shop drawinqs of all major plumbing componenis, such as plumbinq fixWres, etc. Coordlnate with Engineer. H. GonVac�or shall review antl appmve antl a0ix his company name (in [he form of a stamp) antl pmjec� name �o all shop tlrawings and submittals before submitting. 5. Electrical Wiring: A. Will be turnishetl by Elec[rical ConVac�oc This ConVactor shall Wmish necessary conimis, wiring tliagrams antl ins[mctions. s. Piping Drawings: A. Drawings are patlially tliagramma[ic antl are not intentletl to show in tletail all feaWres of work. B. Location o! piping shall be checketl lo tletermine that it clears openings and imporlant sVucWral members. Tha� piping indica�ed as concealetl can be pmpedy concealed in walls or par�itions of linishetl rooms. Antl ihat i� tloes not inter�ere with cabinets, lights or other equipment having lixed locations. G Piping shall be concealed except where specifically noted otherwise. D. All plumbing openings ihrough walls and floors shall be fire stopped, by caulking annular spaces air �ight, Ii �he pipas ax�entl in�o atljaaen� areas. Z Tes�ing: A. WaterGnes- 1. Tes� for leaks and defeds in new piping antl pahs o� exis�ing piping �hat have been apered. extentled, or repairetl. 2. Tes� �o a hytlmstatio pressura o� 100 psi., fo� e pefiod oi hvenry�four (24) hours. 3. Repair leaks antl tle�ec�s wi[h new materials antl re�es[ piping, or potlion �hereof, un[il sa�isiac�ory resul�s are ob�ainetl. 4. Prepare repotl �or �es�s antl requiretl correc�ive aRion. B. Sanitary antl Vent Lines: 1. Test for leaks and tletecls in new piping antl parls o� existing piping �ha[ have been alteretl, ex�entleq orrepairetl. 2 Tes� acmrtling �o pmcetlures o! authorities having juristlic�ion. 3. Repair leaks antl tle�ec�s wi[h new materials and re�es[ piping, or potlion ihereof, un[il sa�isfactory resul�s are ob�ainetl. 4. Prepare report for tesis antl requiretl corrective adion. G Natural Gas Lines: 1. Tes� for leaks and defec�s in new piping antl pahs o� exis�ing piping �hat have been apered. extended, or repaired. 2. Tes�. inspect antl purge lines according to �he Imernational Fuel Gas Code and Amhori�ies hevingfutlstllc�ion. 3. Repair leaks antl de�ao�s with new materials end ra�ast piping, or potlion �hera of, un�il sa�is�ac�ory resul�s are ob�ainetl. 4. Prepare repotl for �es�s antl requiretl corrective action. B. Ma[erials: A. In [he even� a ma[erial �or a speci�ic use is no[ men�ionetl, conhac�or shall supply bes� ma�erial suitabletoruseintentletl. B. Sanitary Waste antl VenL 1. All tlrein lines �o be Solitl wall PVC (ASTM � 2665), Type K Copper (ASTM 8306) or Hubless Cas� Iron (ASTM A 888�. DO NOT USE CELWLAR CORE PVC. 2. TmnklinetobesWbbedou�five 5 fee��mmbuildin . O e 3. Tmnk Ilne shall be suppotled by unexcavated or compacted fill, or other material ihat will not senle or deteriorate. 4. Vetlical antl horizon�al lines shall be concealetl. unless specifically intlica�etl as exposetl. 5. Ins�allation oi sani�ary piping shall be carefulty planned �o mee� invetl elevations as requiretl. 6. Tums in ho�izontal lines shall be accomplishetl via long Wm wye branches o� �hrough combination wye antl eigh[h bentls. ]. Slope 21/2" entl emeller Ilnes e� 1/4"/fl. Slope 3" antl lerger Ilnee a� e minlmum of 1/8 /tl. Q Oomes[ic Water: 1. Copper service line �o be sWbbed oW live (5) fee� irom building. 2 All titlings to be wrought copper (ASTM B t6 22) with soldered joints. 3. Soitler and fluxes shail be lead-free, equal to or iess than 02 percent lead. 4. Ins�all dielechic fitlings where ma�erial changes make it necessary. 5. ConVacror shall verity wi�h wa[er co. be�ore ins�allation of ine[erfor clearances requiretl for maintenance by wa�er co. F. Gas 1. Gas Plpe Ma�erials�. a. S�eel Pipe: NSTM A 53/A 53M, black s�eel, Schedule 40, Type E or S, Grade B. (1) Malleable-Imn Threadetl Fi��ings: ASME 816.3, qass 150, s�antlard patlem. (2) Wmugh4S�eel Weltling FiVinge: ASTM A 234/A 234M �or bu�[ weltling entl eocke� welding. 3 Unions: ASME B16.39 Class 150. malleable imn with brass-to-iron seat rountl O 9 join6 and Ihreaded ends. b. Cormgated, S1ainlessSteel Tubing: Comply wi�h ANSI/IHS LC 1. (1) Manu�acWrers:Suble��tocompliancewi�hrequiremen�s.providepmductsbyone of [he �ollawing: (2) Tubing'. NSTM A 240/A 240M, corruge[etl, Sariea 300 atalnlese e�eal. (3) Coating: PE wlih llame re[artlent. c. Fittings: Copper-alloy mechanical littings with entls matle b fit and listed for use with cormgated stainless-steel tubing and capable ot metal-to-metal seal without gaskets. Include brazing socket or �hreadetl entls complying wi�h ASME B120.1. d. SViker Pla�es: S�eel, tlesigned �o pm�ec� Wbing �mm peneVa�ions. e. Menlloltla: Malleeble iron or s�eel wlth �ecroryapplletl pmtacOve coe[ing. Threatlatl connections shall comply wiN ASME B120.1 !or pipe inlet antl mrmgatetl Wbing outle�s. f. Operating-Pressure Rating:5 psig. 2. Comply wi�h �he In�ema�ional Fuel Gas Code b� ins�alla�ion and purging oi naWral-gas piping. 3. Drawing pians, schematics, antl diagrams indicate generai iocation and arrangement of piping systems. Indicated bcations and arrengemenis are used ro size pipe and calculate �riction loss, expansioq antl other design considera�ions. Ins�all piping as intliw�etl unless deviations �o layout are appmvetl on Coordina�ion Drawings. 4. Arrange �or pipe spaces, chases, slots, sleeves. antl openings in builtling simcWre tluring pmgress o� mns[mc�ion. �o allow for mechanical ins�alla�ions. 5. Ins�all piping in concealetl loca[ions unless o�herwise intlica�etl antl excep[ in equipment moms and service areas. 6. Inslall piping intlicatetl to be exposetl antl piping in equipment moms antl service areas at tlght angles or perellel to bulltling walle. �iegonal rune ere prohlbltetl unleea apecl0cally intlica[ed mherwise. ]. Inslall piping above accessible ceilings �o allow sutficient space for ceiling panel removal. 8. Lowte valves foreasy access. RELEASEDFORCONSTRACTION 1z°e'°e"'tl°"""'°"a'°tl"°a"°se°""e"` Su6jecitocompliancewithallregulations �ranchconnections. of State and Local Codes City of Carniel � y ��m� V"? \oxv�Aln1.T �. DATE: 08�'� '3�2 � 12. Veri�y �inal equipmen� locations �or mughing�in. 13. Gas lines mn on mo! to be suppotletl by Roo� Top Blox or similar antl equal. DO NOT USE WMBER FORGAS PIPING SUPPORT. 14. Drips and Sediment Traps�. Install drips a� poin�s where condensate may colleIX, Including service-meter outlets Locate where accessible to permit cleaning and emprying. Do not install where contlensale Is sublect to ireezing. a. Construc� drips antl setlimeN traps using �ee fitling wi�h boflom outle� plugged or capped. Use nipPle a minimum leng�h of 3 pipe diame�ers. bu� not less than 3 inches long antl same size as connectetl pipe. Ins�all wi�h space below bottom of tlrip �o remove plug or cap. 15. Ex�entl relief ven� connections �or service regula�ors. line regula[ors, antl overpressure pro[ec[ion tlevices to ou[doors antl terminate with weaNerproof vent cap. 16. Conceal pipe installations in walls. pipe spaces. Wility spaces, above ceilings, below gratle or tloors, antl in lloor channels unless intlicatetl to be exposetl to view. 1]. Ose eccen�ric retlucer IiVings �o make reductions in pipe sires. Install litlings with level sitle tlown. te. Connect branch piping from top or side of horizontal piping. 19. Ins�all unions in pipes NPS 2 antl smalleL atljacen� to each vaNe, a� final connection �o each piece of equipment. 20. Do not use naWrabgas piping as gmunding elec�mde. 21. Install sVainer on inlet oi each line�pressure regulator and automatic or elecVically operated vaNe 22. Ins�all sleeves �or piping peneVa�ions o� walls. ceilings. antl �loars. 23. Ins�all sleeve seals for piping peneVa�ions of concre�e walls and slabs. 24. Ins�all escu[cheons �or piping pene[ra�ions of walls, ceilings, antl floors. 25. Outtloar Piping Schetlule a. Abovegmund naWral-gas piping shall be one of ihe following: (1) Steel pipe wph malleable�wn fittings and ihreadetl loinis (2) Steel pipe with wrouBhtsteel fittings and welded joints. 9_Hangers and Supports: A. CarbonSteel Pipe Hangers and Suppons: 1. Descriplion: MSS SP-58, Types 1 ihmugh 58, fac�ory-�abricatetl components. 2. Galvanizetl Metallic Coatings: Pre9alvanized or hot tlipped. 3. Nonmetallic Coatings: Plastic coating, jacke6 or liner. 4. Patltled Hangers: Hanger with liberglass or other pipe insulalion patl or cushion m suppotl bearing sudace of piping. 5. Hanger Rods: Continuous-threatl md, nuts, antl washer made of carbon steei or stainiess steel. B. Install hangers and supports comple�e with necessary attachments, insetls, bops, �otls, nuts, washers, end o�her accessories. G. Vetlical Piping: MSS Type 8 or 42, damps. D. Install hangers for s�eel piping wi�h the following maximum horizontal spacing and minimum mtl tliame�ers: 1. NPS 1-0/4 antl Smaller. 84 inches with 3i8-inch rod. 2. NPS 1-0/2 108 inches with 3/B�nch md. 3. NPS 2 10 feet with 3/8-inch rod. a. NPS2Vz: tlfeetwithl;2inchrod. 5. NPS3andNPS3�1/212fee�wi�h1/2�inchmd. 6. NPS 4 antl NPS 5: 12 �ee� wi[h 5/8-inch mtl. ]. NPS6: 12�ee[wilh3/4-inchrotl. 8. NPS 8 �o NP5 12: 12 teet with D8-inch mtl. E. Install supporls for verlical steel piping every �5 feet. 10. Cleanouts: A. Provide cleanouts on ihe ends of each sanitary line and at any other locations as required or as intliwtetl on �he tlrawings. B. In no ceas shall claenou�s be locatetl more �hen one huntlretl (100) fset epar[. 11. VaNes: A. Watec 1. Valves shall be pmvitle for wa�er lines. 2. Valves shall manufacWred by Nibco, Hammond or equal. 3. All service vaNes shall be �ulb�low rype ga�e valves or ball vaNes. 4. Valves shall be mountetl in accessible lowtions antl in woMable posi�ions. Care shall be taken tor mounting in correct loca�ions. e. Gas: 1. General Requiremen�s tor Me�allic Valves, NPS 2 and Smaller Comply wi�h ASME B16.33. 2. CWPRa�ing:125psig. 3. Threatletl Entls: Comply wi�h ASME B120.1. 4. Dryseal Threatls on Flare Entls: Compty wiN ASME B120.3. 5. Lis[ing: Lisletl antl labeletl by an NRTL accep�able to au[hori�ies having juristliction tor valves 1 inch antl smaller. 6. Service Mark: Valves 1-1,4 inches �o NPS 2 shall have ini�ials "WOG" permanently marketl on valve botly. ]. Two-Piece, Full-Porl, Bronze BaII Valves wi�h Bronze Trim: M55 SP-11p. e. Bmnze PWg Valves: MSS SP-�e. 9. Valve Ins�allation a. Ins�all manual gas shmofl valve for each gas appliance ahead o� cormga�ed stainless�s�eel Wbing or copper connector. b. Instali regularors and overpressure pmtection devices with maintenance access space adequa�e for servicing and �es�ing. 10. Abovegmuntl Manual Gas Shu[ofl Valve Schetlule a. Valves tor pipe sizes NPS 2 antl smaller at service me�er shall be one of ihe �ollowing: (1) Two-piece, full-potl, bronre ball valves with bronre Vim. (2) Bmnze plug veNe. b. Ois�ribu�ion piping valves for pipe sizes NPS 2 and smaller shall be one of �he following: (1) Two-piece,full-potl,bronzeballvalveswithbronzeVim. (2) Bmnze plu8 �aroa- c. Valves in branch piping tor single appliance shall be one of ihe following: ��) Two�piece, fulbport, bronze ball valves with bronze trim. �2) Bronze plug valve. 12. Finishing: A. Plumbing fixtures shall be supporled securely with concealed breckets, anchors or cleats or required. B. Cu�[ing antl pa�ching shall be tlone using me�hotls speci�icalty appmvetl by Amhi[ecVEngineer. Q CareWlly loca�e fiVings using amhi�ecWral tlrawings. Do not scale plumbing tlrawings. D. Rough�in shall be in accortlance wi[h equipmen� antl fixWre supplier's mughing-in tlimensians. Plumbing Fixture Schedule Mark Descriptlon Plpe Connectlons Qn) Motlel Numbers Acceptable Manu�acW�ars No. HW CW W V �Q A EXTERIOR CLEAN OUT -(Pavetl areas) Cas� imn botly. heavy . . q . ZURN ttZN1400-HD-BP JOSAM, J.R. SMITH, MIFAB, WATTS dury mund swria�etl nickel bmnze cover, bmnze plug. 44 45 48� �1 - - � _ ___\ O O wa�er. p. ; line. ans nion. FJ FIRST FLOOR ENLARGED PLUMBING PLAN SCALE: 1/8" = 1'-0" General Notes: A. All fi�linqs, piping, lixWres. ma�erials. etc. to mee� �he currenl Safe Drinking Wa�er Ac� wi�h all of i�s amendments and the Retluction of Lead in Drinking water Act. B. All work shall comply wi�h all na�ional, s�ate, local cotles antl ordinances petlaining to �he work in �his pwjem. C. All plumbing fixWres shall be supplied with individual wa�ersupptys�opsandcodeappmvetltraps Exposetl piping shan be chmme plated. D. All plumbing �ixWres shall be ins�alletl with appmvetl backilow preven�ion devices. E No piping shall pass tlirec�ly ove� elecVical power tlishibWioncabinets,panelboartls,elu ConVactorto coortlina�e panel locations prior m piping installation. F. All plumbing vents to be a minimum ol 10'-0" imm any air in�ake. Coordinate lowtions wi�h HVAC plans. G. Single mnouts to plumbing fixtures shall be ihe same size as on �he plumbing fixWre schedule unless otherwise noted. H. Concealetl gas piping shall be cons�mc�etl in acmrtlance wiN cotle withoW unions, Wbing fiVings ar mnning �hreatls. I. Gas lines mn on roof [o be supporletl by Roof Top Blox or similar and equal. DO NOT USE LUMBER FOR GAS PIPING SUPPOFT. J. All waste, water, vent gas and condensate Ilnes shown �o be conneded to �heir associated fixture'equipment unless noted o�heiwise. All equipment and sys�ems shown must be complete and usable upon completion o� project. ww'� I..L � U �` � 1 � U U� W °' �� � U 2 � � C U� LL + a �' � W` a� 1 � - U � � CONSTRUCTIONDOCUMENTS aciryoic° .. u�in9.a udB �91D20 rre�isioms�ssueo ARCHITECT/ LANDSGAPE ARGHITECT: SITE ARCHITECTURE etinnaowre. ia�m�ape atini�m�re PROJEQCONTACT�. BRA�SMITH,RA LEE�AP 13140 EAST 1 B6TH STREET rvos�esviue. w. asoso PH' 31 ] 3]6 8]ID EMAIC.bratl@site-arcM1ltedure_mm STRIICTURALENGINEER: STRUQURAL �ESIGN, INC. PROJECTCONTACT: CHARLES P. SCHAEFER, P.E. ]2]i W. 115 5$ SI1RE B NEW PALESTWE IN.46163 PH_ 0�] 881 ]]O8 EMAIL'.rsonaefer�sVuo�tleslqn.rqm MEP ENGINEER: THE ENGINEERING COLLABORATNE PROJECT CONTACT�. SAM HURT, RE. 24ID EXEIXITIVE DRIVE SUITE 10� IN�IANAPOLIS,IN 4624� PH�.9� / 648 994� F MAII �. Sdm@I¢0 mBp.00m VL/ r Z W G W` / a° Na Q � W J aZ� W Z N M �W2r� � L � o � T � Z ��� J O�Qw W ��N� m W � U FIRST FLOOR ENLARGED PLUMBING PLAN P101 20�9-031 6"Sani�ary Was�e. ■ rv� Ex[entl �0 5'�0" rv� LJ beyond bldg. line. LJ ❑� ❑�