HomeMy WebLinkAbout01367IN_M1SECiION 23 0593
TESTING, ADJUSiING, AND BAIANCING FOR HVAC
PART 1 GENERAL
1.01 SECiION MCLUDES
E TESTING, ADJUSiMENi, AND BAUNCING OF AIR SYSTEMS.
R MEASUREIAENT OF FlNAL OPERAiING CONDIiION OF HVAC SYSiEMS.
G. SOUND MEn$UREMENT OF EQUIPMENi OPERAiING CONDIiIONS.
H. VIBRAiION IAEASUREMENT OF EQUIPMENT OPERATING CONDITIONS.
1.02 REFERENCE SiANDARDS
A. ASHRAE STD I11 - MEASUREMENT, iESiING, ADJUSiING, AN� BALANCING OF BUILDING HVAC
SY4EMS; 2008.
B. SMACNA (TAB) - HVAC SYSTEMS TESTING, ADJUSTING AN� BAIANGNG 2002.
L03 SUBMITfALS
A. SEE SECTION 01 3000 - ADMINIS7RATIVE kEQUIkEMENTS, FOk SUBMITfAL PROCEDUkES.
B. TAB PIAN: SUBMIT A WRITfEN PIAN INDICATING THE TESTING, ADJUSTING, AN� BALANCING
STAN�ARD TO BE FOLLOWE� AND THE SPECIFIC APPROACH FOR EACH SYSTEM AN�
WMPONENT.
1. INCWDE AT LEAST THE PoLLOWING IN THE PIAN:
A LISi OF ALL AIR FLOW, WATER FLOW, SOUN� LEVEL, SYSTEM CAPACItt AN� EFFICIENCY
MEASUREMENTS TO BE PERFORMED AN� A �ESCRIPTION OF SPECIFIC TEST PROCEDURES,
PARAMEfERS, FORMUTAS TO BE USED.
B. COPY OF FlELD CHECKOUT SHEETS AND LOGS TO BE USEq LISTING EACH PIECE OF
EQUIPMENT TO BE TESTED, ADJUSTED AN� BALANCED WITH THE �ATA CELLS TO BE GATHERED
FOR EACH.
C. DISCUSSION OF WHAT NOTATIONS AND MARKINGS WILL BE MADE ON THE DUCT AND PIPING
DRAWINGS DURING THE PROCESS.
D, FINAL TEST REPORT FORMS TO BE USED.
E. PROCEDURES FOR FORMAL �EFIQENCY REPORTS, INCLU�ING SCOPE, FREWENCY AN�
DISTRIBUTION.
G FINAL REPORT: IN�ICATE DEFICIENCIES IN SYSTEMS THAT WOULD PREVENT PROPER TESTING,
ADJUSTING, AND BALANCING OF SYSTEMS AND EQUIPMENT TO ACHIEVE SPECIFIED
PERFORMANCE.
1. REVISE TAB PUN TO REFLECT ACTUAL PROCEDURES AND SUBMIT AS PART OF FINAL
REPORT.
2 SUBMIT DRAFf COPIES OF REPORT FOR REVIEW PRIOR TO FINAL ACCEPTANCE OF PROJECT.
PROVIDE FINAL COPIES FOR ARCHITECT AND FOR INCWSION IN OPERATING AND
MAINTENANCE MANUALS.
3. INCWDE ACTUAL INSTRUMEM LIST, WITH MANUFACTURER NAME, SERIAL NUMBER, AND DATE
OF CALIBRATION.
4, FORM OF TEA REPORTS: WHERE THE TAB STANDARD BEING FOLLOWE� RECOMMEN�S A
REPORT FORMAT USE THAT; OTHERWISE, FOLLOW ASHRAE SiD 111.
5. UNITS OF MEASURE: REPORT DATA IN BOTH I-P (INCH-POUN�) AND SI (MEfRIC) UNITS.
PART 2 PRO�UCTS - NOT USEO
PART 3 EXECUTION
3.01 GENERAL RWUIREMENTS
A. PERFORM TOTAL SYSTEM BAIANCE IN ACCOR�ANCE WITH ONE OF THE FOLLOWING:
1. SMACNA (TAB).
B. BEGIN WORN AFfER COMPLETION OF SYSTEMS TO 6E TESTED, ADJUSTED, OR BALANCED AN�
COMPLETE WORK PRIOR TO SUBSTANTIAL COAIPLEfION OF THE PROJECT.
G TAB AGENCY OUALIFlCATIONS:
1. COMPANY SPECIALRING IN THE TESTING, ADJUSTING, AND BAUNCING OF SYSTEMS
SPECIFlED IN TH5 SECTION.
2. HAVING IAINIMOM OF THREE YEARS DOCUMEMED EkPERIENCE.
3. CERTIRED BY ONE OF THE FOLLOWING.
A. AABC, ASSOCIATED AIR BAIANCE WUNCIL WWW AABC.COM; UPON COAIPLEfION SUBMIT AABC
NATIONAL PERFORMANCE GUARANN.
B. NEBB, NATIONAL ENVIRONAIENTAL BALANCING BUREAU. WWWNEBB.ORG.
C. TABB, THE TESTING, ADJUSTING AND BALANCING BUREAU OF NAiIONAL ENERGY MANAGEMENT
INSiIiUTE: WWWTABBCERTIFlED.ORG.
�. TAB SUPERVISOR AND TECHNICIAN QUALIFlCAiIONS: CER➢FlED BY SAME ORGANIZATION !S iAB
AGENCY.
3.02 FXAMINATION
A. VERIFY THAT SYSTEMS ARE COMPLETE AN� OPERABLE BEFORE COMMENCING WORK. ENSURE
THE FOLLOWING CONDITIONS:
1. SYSTEMS ARE STARTED AN� OPERATING IN A SAFE AND NORIAAL CONDITION.
2 TEIAPERATl1RE CONTROL SYSTEMS ARE INSTALLED COMPLEfE AND OPERABLE.
3. PROPER THERIAAL OVERLOAD PROTECTION IS IN PUCE FOR ELECTRICAL E�UIPIAENT.
A FlNAL FlLTERS ARE CLEAN AN� IN PLACE. IF REQOIRE�, INSTALL TEMPORARY MEDIA IN
ADDITION ID RNAL FlLTERS.
5. DUCT SYSTEMS ARE CLEAN OF DEBRIS.
6 FANS ARE ROTATING CORRECTLY.
7. FlRE AND VOWIAE DAIAPERS ARE IN PLACE AND OPEN.
8. AIR COIL FlNS ARE CLEANED AND COMBE�.
9. ACCESS DOORS ARE CLOSED AND DUCT END CAPS ARE IN PUCE.
10.AIR OUTLETS ARE INSTALLED AND CONNECTE�.
11.DUCT SYSTEM LEAKAGE IS MINIIARE�.
B. SUBMIT FlELD REPORTS. REPORT DEFECTS AND �ERCIENCIES THAT WILL OR WULD PREVENT
PROPER SYSTEM BAUNCE.
C. BEGINNMG OF WORK MEANS ACCEPTANCE OF EXISTING CONDIiIONS.
3.03 PREPARATION
A. PROVIDE INSiRUMENTS REOUIRE� FOR TESTING, A�JUSTING, AND BALANCMG OPERATIONS.
MAKE INSTROMEMS AVAILABLE TO ARCHITECT ID FAQLITATE SPOT CHECKS DURING TESTING.
B. PROVIDE AD�ITIONAL BAUNCING DEVICES AS REQUIRED.
3.04 ADJUSTMENT TOLERANCES
A. A'R HANDLING SYSTEMS�. ADJUSi TO WITHIN PWS OR MINUS 5 PERCENT OF DE9GN FOR
SUPPd SYSTEMS AN� PWS OR A�INUS 10 PERCENT OF �ESIGN FOR RETURN AND EXHAUST
SYSTEMS.
B. AIR OUTLETS AND WLETS: ADJUST TOiAL i0 WITHIN PWS 1� PERCENT AND MINUS 5
PERCENT OF DESIGN TO SPACE A�JUST OUTLEfS AN� WLEfS IN SPACE TO WITHIN PWS OR
MINUS 10 PERCENT OF DESIGN.
3.05 RECORDING AND ADJUSTING
A FlELD LOGS: MNNTAIN WRITfEN LOGS INCWDING:
1. RUNNING LOG OF EVENTS AND ISSl1ES.
2 DISCREPANCIES, DEFlQENT OR 11NCOMPLEfE� WORK BY OTHERS.
3. CONTRACT INTERPREfATION REQUESTS.
A LISTS OF COMPLETED TESTS.
B ENSORE RECORDED �ATA REPRESENTS ACTUAL MEASURED OR OBSERVED CON�ITIONS.
C. PERMANENTLY MARK SEfTINGS OF VALVES, DAAIPERS, AN� OTHER AOJUSTMENT OEVICES
ALLOWING SETfINGS TO BE RESTORED. SEf AN� LOCK MEMORY STOPS.
�. AFfER ADJUSTMENT, TAKE MEASUREMENTS TO VERIFY BAIANCE HAS NOT BEEN �ISRUPTEO OR
THAT SUCH DISRUPTION HAS BEEN RECTIFlEO.
E LEAVE SYSTEMS IN PROPER WORKMG ORDER, REPLACING BELT GUARDS, CLOSMG ACCESS
DOORS, CLOSING �OORS ID ELECTRICAL SWITCH BORES, AN� RESTORMG THERMOSTATS TO
SPECIREO SEffMGS.
3.Ofi AIR SYSTEM PROCE�URE
A. ADJUST AIR HANDLMG AND �ISTRIBUTION SYSTEMS TO PROVI�E REQUIREO OR DESIGN SUPPd,
REfURN, ANO EXHAUST AIR �UANTITIES AT SITE ALTITO�E.
B. MAKE AIR OUANTIN MEASUREMENTS IN DUCTS BY PITOT TUBE TRAVERSE OF ENTIRE CROSS
SECTIONAL AREA OF OUCT.
C. MEASURE AIR OUANTITIES AT AIR WLEfS AND OOTLEfS.
�. ADJUST DISTRIBUTION SYSTEM TO OBTAIN UWFORM SPACE TEMPERATURES FREE FROM
oedecno�ne�e ow�rs allo Noise.
E USE VOWME CONTROL �EVICES TO REGULATE AIR QUANTITIES ONLY ID EXTEND THAT
ADJUSTMENTS 00 NOT CREATE OBJECTIONABLE AIR MOTION OR SOUND LEVELS EFFECT
VOWAIE CONTROL 8Y DOCT INTERNAL DEVICES SUCH AS DAMPERS ANO SPLITfERS.
F. VARY TOTAL SYSTEM AIR QUANTITIES BY ADJUSTIAENT OF FAN SPEEDS. PROVI�E �RIVE
CHANGES REQUIREO. VARY BRANCH NR QOANTITIES BY DAMPER REGULATION.
G. PROVI�E SYSTEM SCHEMATIC WITH REQOIRE� AND ACTUAL AIR QUANTITIES RECOROE� AT EACH
oui�Ei oR m��r.
H. MEASURE STATIC NR PRESSURE CONOITIONS ON NR SUPPLY UNITS, INCWDING FlLTER AN�
COIL PRESSURE DROPS, ANO TOTAL PRESSURE ACROSS THE FAN. MANE ALLOWANCES FOR
sn oc�RELEASEO FOR CON$TRIICTI�N AiR. REruRN aR, nuo EZHnusT oaMaERs
Su6jec��ocompliancewithallregula�ions 7E AIR, REfORN AIR, AN� EXHAUST
of S�a�e antl Local Codes
Ci ofCarmel SUPPLY, RETURN, AN� EHHAl1ST AIR
r
ty NEEN EACH TO MAINTAIN APPROXIMATELY
�un��\i lo•rvalM��'
DATE: OH/ZO/2O
0.05 INCHES (125 Pl� POSITIVE STATIC PkESSURE NFAR THE BUILDING ENTkIES.
3.07 SCOPE
A. TEST, ADJU57, AND BALANCE THE FOLLOWING:
1. PACKAGE� ROOF TOP HEATING/COOLING UNITS.
2. FANS.
3. AIR MLEfS AND OUTLEfS
CTION 23 0713
Dl1CT INSULATION
PART I GENERAL
i.oi sEcnoN iNcwoEs
A. Dl1CT INSULATION.
1D2 REFERENCE STANDAR�S
A. ASTM C518 - STANOARD TEST MEfHO� FOR STEA�Y-STATE THERMAL TRANSMISSION
PROPERTIES 8Y MEANS OF THE HEAT FLOW MEfER APPARATUS; 2017.
B. ASTM C553 - STANOARD SPECIFlCATION FOR MWERAL FlBER BIANKEf THERMAL INSUUTION
FOR COMMERCIAL ANO INOUSiRIAL APPLICATIONS; 2013.
C. ASTM E84 - STANOARD TEST MEfHO� FOR SURFACE BORNMG CHARACTERISTICS OF BUIL�ING
MATERIALS 2018.
D. ASiM E96/E96M - STANDARD TEST METHODS FOR WATER VAPOR iRAN5MI5510N OF
MATERIALS; 207fi.
E. UL 72J - STANDARD FOR TEST FOR SURFACE BURNING CHARACTERISTICS OF BUILDING
MATERIALS; CURREM EDITION, MCWDING ALL REVISIONS.
1.07 DELNERY, STORAGE, AN� HANDLING
A. ACCEPT MATERIALS ON SITE IN ORIGINAL FACTORY PACKAGING, LABELLED WITH
MANUFACTURER'S IDENTIFlCAiION, INCLUDING PRODUCT DENSItt AND iHICKNESS-
B. PROTECT INSULAiION FROM WEAiHER AND CONSTRUCTION iRAFFlC, DIRT, WATER, CHEMICAL,
AND MECHANICAL DAMAGE, BY SiORING IN ORIGINAL WRAPPING.
1.04 FIELD CONDIilONS
A. MAINTAIN AMBIENT TEMPERATURES AND CONDITIONS REOUIRED BY MANUFACTURERS OF
ADHESNES, MASTICS, AND INSULAiION CEMENTS-
B. MAINTAIN TEMPERATURE DURING AND ARER INSTALLniION FOR MINIMUM PERIOD OF 24 HOURS.
PART 2 PRODUCTS
2.01 REGULATORY REQUIREMENTS
A. SURFACE BURNING CHARACTEkISrICS FIAME SPRFAD IN�EX�SIAOKE DEVELOPEO IN�EX OF
25/50, MAXIMUTA, WHEN TESTED IN ACCOROANCE WITH ASTM E84 OR UL 723.
202 GLASS RBER, FLEXIBLE
A. MANUFACTl1RER:
1. JOHNS IAANVILLB WWW.JM.COIA.
2. KNAUF INSULAiION; ATMOSPHERE DUCT WRAP� WWW.KNAUFINSULATION.COIA/�SLE.
3. OWENS CORNING CORPORATION: WWWACBUILDINGSPEGCOIA.
4. CERTAIMEED CORPORATION�. WWW.CERiAINTEED.COM.
B.INSULATION: ASTM C553; FLE%IBLE, NONCOMBUSiIBLE BLANKET.
1. 'K' ('KSI') VALUE Q36 AT 75 DEGREES F(0.052 AT 24 DEGREES C), WHEN TESTED IN
ACCORDANCE WITH ASiM C518.
2 MAXIMUM SERVICE TEMPERATURE�. 1200 OEGREES F(649 �EGREES C).
3. MAXIMUM WATER VAPOR ABSORPTION: 5.0 PERCENT BY WEIGHT.
G VAPOR BARkIER JACKEf:
1. KRAFf PAPER WITH GlASS FIBER YARN AN� BON�E� TO AWMINRED FlLM.
2 MOISTURE VAPOR PERMEABILIiY�. �.02 PERM INCH (OA29 NG/PA S IA), WHEN TESTED IN
ACCORDANCE WITH A4M E96/E961A.
3. SEWRE WIiH PRESSURE SENSITNE TAPE.
D. VAPOR BARRIER TAPE:
1. KRAFi PAPER REMFORCED wITH GNSS FIBER YARN AND BONDED TO ALUTAINIZED FlL1A,
WIiH PRESSURE SENSIiNE RUBBER BASED ADHESNE.
E. TIE WIRE: ANNFALE� STEEL, 16 GAGE, 0.0508 INCH �IAMEfER (L29 MM �IAMEfER).
PART 3 E%ECUTION
3.01 EXAMINATION
A. VERIFY THAT DUCTS HAVE BEEN TESTE� BEFORE APPLYING INSULATION MATERIALS.
B. VERIFY THAT SURFACES ARE CLEAN, FOREIGN MATERIAL REMOVED, AN� DRY.
3.02 INSTALLATION
A.INSTALL IN ACCOkDANCE WITH IAANUFACTUREk'S INSTRUCTIONS.
B.INSTALL IN ACCOkDANCE WITH NAIMA NATIONAL INSULATION STAN�ARDS.
C.INSULATED Dl1CTS CONVEYING AIR BELOW AMBIENT TEMPERATURE
1. PROVIDE INSULATION WITH VAPOR BARRIER JACKEfS.
2 RNISH WITH TAPE AND VAPOR BARRIER JACKEf.
3. CONTINUE INSUUTION THROUGH WALLS, SLEEVES, HANGERS, AND OTHER �UCT
PENEfRATIONS.
4.INSULATE ENTIRE SYSTEM MCLU�ING FlTfMGS, JOINTS, FLANGES, FlRE �AMPERS, FLEXIBLE
CONNECTIONS, AN� EXPANSION JOINTS.
D. EXTERNAL DOCT INSUlATION APPLICATION:
1. SECURE INSUlATION WITH VAPOR BARRIER WITH WIRES AN� SFAL JACKEf JOINTS WITH
VAPOR BARRIER AOHESIVE OR TAPE TO MATCH JACNH.
2 SECURE WSULATION WITHOUT VAPOR BARRIER WITH STAPLES, TAPE, OR WIRES.
3.INSTALL WITHOl1T SAG ON UNDERSI�E OF �UCT. USE AOHESIVE OR MECHANICAL
FASTENERS WHERE NECESSARY TO PREVENT SAGGING LIR �UCT OFF TRAPEZE HANGERS
AN� INSERT SPACERS.
4. SEAL VAPOR BARRIER PENEfRATI0N5 BY MECHANICAL FASTENERS WITH VAPOR BARRIER
A�HESNE.
5. S�OP ANO POINT INSULATION AROUN� ACCESS DOORS AND �AMPER OPERATORS TO ALLOW
OPERATION WITHOUT �ISTURBING WRAPPING.
SECTION 23 3100
Hvac oucTs nNo casmcs
PART 1 GENERAL
i.oi sEcnoN iNcwoEs
B. MEfAL OUCIWORK.
C. Dl1CT CLEANING.
1D2 REFERENCE STANDAR�S
A. ASiM AJ6/A36M - STANDARD SPECIFlCATION FOR CARBON SiRUCTURAL 4EELt 2014.
B. ASTM A653/A653M - SiANDARD SPECIFlCATION FOR SiEEL SHEET, ZINC-COATED (GALVANIZED)
OR ZINC-IRON ALLOY-COATED (GALVANNFALED) BY THE HOT-DIP PROCESS; 2017.
G ASTM E84 - STAN�ARD TEST MEfHOD FOR SURFACE BURNING CHARACTERISTICS OF BUIL�ING
MATEkIALS; 2018.
D. NFPA 90A - STANDARO FOR THE INSTALLATION OF AIR-CON�ITIONING AND VENTIUTING
SYSTEMS 2018.
E SMACNA (�CS) - HVAC DUCT CONSTRUCTION STANDAR�S METAL AN� FLEXIBLE; 2005
(REVISED 2009).
F. UL 181 - STANDARD FOR FACTORY-MADE AIR DUCiS AND AIR CONNECTORS; CURRENT
EDITION, INCLUDING ALL REVISIONS.
1.OJ QUALItt ASSURANCE
A. MANUFACiURER QUALIRCAiIONS COMPANY SPECIALIZMG IN MANUFACTURING THE TYPE OF
PRODUCiS SPEqFlED IN THIS SECiION, WIiH MINIMUM THREE YEARS OF DOCUMEMED
E%PERIENCE, AND APPROVED BY MANUFACTURER.
B.INSTALLER OUALIFlCATIONS: COMPANY SPECIALIZING IN PERFORMING THE TYPE OF WORK
$PECIFlED IN THIS SECiION, WITH MINIMUM 3 YEARS OF DOCUMEMED ERPERIENCE.
1.04 RELD CONDIilONS
A. DO NOi INSTALL DUCT SEALANTS WHEN iEMPERAiURES ARE LESS iHAN iHOSE RECOMMENDED
BY SEAIANi MANUFACTURERS.
B. MAINTAIN TEMPERATURES WITHIN ACCEPTABLE RANGE DURING AND ARER INSiALLAiION OF
DUCT SEAUNTS.
PART 2 PRODUCTS
2.01 DUCT ASSEMBLIES
A. REGULATORY REOUIREMENTS: CONSTRUCT DUCiWORK TO NFPA 90A SiANDARDS.
B. DUCTS: GALVANIZED STEEL, UNLESS OiHERW15E INDICATED.
G LOW PRESSURE SUPPLY (SYSrEM WITH COOLING WILS): 2 INCH W.G. (500 PA) PRESSURE
CLA55, GALVAWZED STEEL
D. REfORN AN� RELIEF: 1 INCH W.G. (250 PA) PRESSURE CLASS, GALVANIZED STEEL.
E. GENERAL ERHAUST: 1/2 INCH W.G. (125 PA) PRESSURE CIASS, GALVANIZED SiEEL.
F TRANSFER AIR AND SOUND BOOiS: 1/2 INCH W.G- (125 PA) PRESSURE CLA55, FlBROUS
cu�ss.
2.02 MATERIALS
A. GALVANIZED STEEL FOR DUCTS: HOT-0IPPED GALVANRE� STEEL SHEET, ASTM A653/A653M
FS IYPE B, WITH G60/Z180 COATING.
B. JOINT SEALERS AND SEAlANiS: NON-HARDENING, WATER RESISTANT, MILDEW AND MOLD
RESISiANT,
1. ttPE HEAVY MASiIC OR LIQUID USED ALONE OR WITH TAPE, SUIiABLE FOR JOINi
CONFIGURATION AN� COMPAiIBLE WIiH SUBSiRAiES, AND RECOMMENDED BY MANUFACiURER
FOR PRESSURE CU+55 OF DUCiS.
2. SURFACE BURNING CHARACTERISTICS FIAME SPREAD INDEN OF ZERO AND SMOKE
DEVELOPED INDE% OF ZERO, WHEN iE4ED IN ACCORDANCE WIiH ASTM E84.
3. FOR USE WITH REAIBLE DUCTS: UL LABELED.
C. HANGER RO�: ASTM A36/A36M�, STEEL, GALVANIZE�; THRFADE� BOTH ENDS, THREADED ONE
EN�, OR WNTINUOUSLY THRFADE�.
203 DUCIWORK FABRICATION
A FABRICATE AN� SOPPORT IN ACCORDANCE WITH SMACNA (OCS) AND AS INDICATED.
B. PROVI�E �UCT MATERIAL, GAGES, REWFORCING, AN� SEALING FOR OPERATING PRESSl1RE5
INDICATE�.
Q CONSTRUCT T'S, BENDS. AND ELBOWS WITH RADIUS OF NOT LESS THAN 1-1/2 TIMES WIDTH
OF DUCT ON CENTERLME. WHERE NOT POS9BLE AND WHERE RECTANGUUR ELBOWS MUSi
BE USED, PROVIDE AIR FOIL TURNING VANES OF PERFORATED IAETAL WITH GLASS FlBER
INSULATION.
D.INCREASE DUCT 9ZES GRADUALLY, NOT E%CEEDING 15 DEGREES DIVERGENCE WHEREVER
POSSIBLE; MANIMUM 30 DEGREES DIVERGENCE UPSTREAM OF EOUIPMENT AND 45 DEGREES
CONVERGENCE DOWNSTREAM.
E FABRICATE CONiIN00USLY WELDED ROUND AN� OVAL DUCT RTiINGS IN ACCORDANCE WITH
SMACNA (DCS).
2.04 MANUFACiURED DUCiVJORK AND FITfINGS
A. DOUBLE WALL INSULATED ROUND DUCTS: ROUND SPIRAL LOCKSEAM DUCT WIiH GALVANIZED
STEEL OUTER WALL, PERFORATED GALVANRED STEEL INNER WALL; FITfING WITH SOLID INNER
WALL.
1. MANUFACTURE IN ACCOR�ANCE WITH SMACNA (DCS).
2 INSUlATION:
A. THICKNESS: 1 MCH (25 MM).
B. MATERIAC AIR.
B. FLEXIBLE DUCTS: UL 181, CUSS 1, AWMINUM LAMINATE AND POdESTER FlLM WITH UTEX
ADHESNE SOPPORTEO BY HELICALLY WOl1N� SPRMG STEEL WIRE.
1. PRESSURE RATING: 10 MCHES WG (2.50 KPA) POSRIVE AND 1.0 INCHES WG (250 PA)
NEGATNE.
2. MA%IMUM VELOCIiY�. 4000 FPM (20.3 M�SEC).
3. TEMPERATURE RANGE: MINUS 20 �EGREES F TO 210 �EGREES F(MINUS 28 DEGREES C
i0 99 DEGREES C).
4. MANUFACiURERS:
A. HART & COOLEY, INC'. WWW.HARTANDCOOLEY.COIA.
B. THERIAAFLEX, M-KC..
PARi 3 EXECUTION
3.01 INSTALUTION
A.INSTALL, SUPPORT, AND SEAL DUCTS IN ACCORDANCE wITH SMACNA (DCS)-
B.INSTALL IN ACCORDANCE WITH MANUFACTURER'S MSTRUCTIONS.
C. DURING WNSTRUCTION PROVI�E TEMPORARY CLOSURES OF MEfAL OR TAPE� POLYEfHYLENE
ON OPEN �UC7WORN TO PREVENT CONSTRUCTION �UST FROM ENTERING DUC7WORK SYSTEM.
D. FLEHIBLE DUCTS: CONNECT TO MEfAL DUCTS WITH AOHESIVE PLUS SHEEf MEfAL SCREWS.
E. DUCT SIZES INOICATE� ARE INSI�E CLFAR DIMENSIONS. FOR LINED �UCTS, MAINTAIN SRES
INSI�E LINING.
E LOCATE DUCTS WITH SUFFICIENT SPACE AROUND EQUIPMENT TO ALLOW NORMAL OPERATING
AND MAINTENANCE ACTIVITIES.
G. USE �OUBLE NUTS AN� LOCK WASHERS ON THREA�E� R0� SUPPORTS.
H. CONNECT �IFFUSERS OR LIGHT TROFFER BOOTS ID LOW PRESSURE �UCTS �IRECTLY OR WITH
5 FEEf (I.5 M) MAXIMl1M LENGTH OF FLEXIBLE OUCT HELD IN PIACE WITH STRAP OR CLAMP.
3D2 CLEANING
A. CLEAN �UCT SYSTEIA AND FORCE AIR AT HIGH VELOCIN THROUGH DUCT TO REIAOVE
ACCUMULATED �UST. TO OBTAM SUFRCIENT AIR, CLEAN HALF THE SYSTEM AT A TIME.
PROTECT EOl11PMENT THAT COUL� BE HARME� 8Y EXCESSNE OIRT WITH TEMPORARY FlLTERS,
OR BYPASS OURING CLEANING.
SECTION 23 3700
AIR OUTLEfS AND WLEfS
PART 1 GENERAL
1.01 SECTION INCWDES
n. oiFFusees.
B. REGISTERS/GRILLES.
PARi 2 PRODUCTS
2.01 IAANUFACiURERS
A. KRUEGER-HVAC, DIVISION OF AIR SYSTEM COMPONENTS: WWW.KRUEGER-HVAC.COM.
B. PRICE INDUSTRIES� WWW.PRICE-HVAC.COM/�AE.
C. iITUS, A BRAND OF AIR �ISiRIBUTION TECHNOLOGIES: WWW.TITUS-HVAC.COM.
2.02 RECTANGUUR CEILING DIFFUSERS
A. IYPE�, PROVIDE SQUARE, SiAMPED, MULTI-CORE, SQUARE, ADJUSTABLE PATfERN, SiAMPED,
MULTI-CORE, SQUARE AN� RECTANGULAR, MULiI-LOWEREq AND SOVARE AND RECTANGULAR,
ADJUSTABLE PATfERN DIFFUSER TO DISCHARGE AIR IN 360 DEGREE, ONE WAY, iW0 WAY,
THREE WAY, AND FOUR WAY PATfERN WITH SECTORIZING BAFFLES WHERE INDICATED.
B.CONNECTIONS: ROUND.
C. FRAME: PROVIDE SNAP-IN ttPE. IN PLASTER CEILMGS, PROVIDE PUSTER FRAME AN�
CEILING FRAME.
D. FABRICATION: SiEEL WITH BAKED ENAMEL FINISH.
E. COLOR: AS INDICATED.
203 CEILMG SUPPLY REGISTERS/GRILLES
A. IYPE�. STREAMLINED AND IN�IVIDUALLY ADJUSTABLE CURVED BIA�ES TO �ISCHARGE AIR
ALONG FACE OF GRILLE, 7W0-WAY �EFLECTION.
B. FRAIAE: 1-1/4 INCH (32 MM) MARGIN WITH COUNTERSl1NK SCREW MOONTING AN� GASKEf.
C. CONSTRUCTION: MADE OF AWMINOM EXTRUSIONS WITH FACTORY ENAMEL FINISH.
D. COLOR: AS INDICATE�.
E. DAMPER: IMEGRAL, GANG-OPERATE�, OPPOSED BLADE IYPE WITH REMOVABLE KEY
OPERATOR, OPERABLE FROM FACE.
2A4 CBLING ExHAUSi AND RETURN REGI4ER5/GRILLES
A IYPE�. STREAMLINED BLADES, 3/4 INCH (19 MM) MINIMUM �EPTH, 3/4 INCH (19 MM)
MAXIMUTA SPAQNG, WITH BLADES SET AT 45 �EGREES, VERTICAL FACE.
B. FRAME: 1-1/4 INCH (32 MM) MARGIN WITH COUNTERSUNK SCREW MOONTING.
Q FABRICATION: STEEL WITH 20 GAGE, 0.0359 INCH (091 MM) MINIMUTA FRAMES AND 22 GAGE,
OA299 WCH (076 MM) MINIMUM BLADES, STEEL AND ALUMINUM WITH 20 GAGE, 0.0359 INCH
(0.91 MM) MINIMUM FRAME, OR AWMINUM EHTRUSIONS, WITH FACTORY BAKED ENAMEL FINISH.
D. COLOR: AS INDICATED.
E. DAMPER: INTEGRAL, GANG-OPERATED, OPPOSED BLADE ttPE WITH REMOVABLE KEY
OPERATOR, OPERABLE FROM FACE WHERE NOT INDIVIDUALLY WNNECTE� TO EHHAUST FANS.
r4��
pharmacyn
HUB/ADA/SSSI/ACO
STORE NUMBER 01367
13090 PETTIGRU DR.
CARMEL, IN. 46032
CAPCODE: (90�113�88�114)
CS PRo,IECT NUMBER 138457
ARCHITECT OF RECORD�
i-1
LJ
CONSULTANT ENGINEER�
CONSULTANT�
SEAL�
REVISIONS:
04-13-2020
DRAWING BY:
CVS PROJECT MANAGER:
DATE:
JOB NUMBER:
T�T�E:
PERMIT SET
R. McCARTHY
E. ROSARIO
04-13-2020
JCDT19.0397.00
MECHANICAL
SPECIFICATIONS
SHEET NUMBER:
1�
COMMENTS: