Loading...
HomeMy WebLinkAboutC040.5 - SIGNAGE AND PAVEMENT MARKING PLANSEAGroup,LandSu rveyors SEAG roup, LandSurvey ors SEAG roup, LandSurvey ors SEAG roup, LandSurvey ors SEA Grou p,Lan dSurv eyors TRAILBLAZER COURT TOWNE MEADO W DRIVE JASMINE DRIVETOWNE ROADSUTTON AVE TOWNE ME ADOW DRIVE * * * * ** * * * * * * * * NORTHWEST BASIN BMP BOTTOM: 886.50 TOB: 891.00 2-YEAR: 887.13 10-YEAR: 887.85 100-YEAR: 889.86 SPILLWAY: 891.50 SOUTHWEST BASIN BMP BOTTOM: 883.92 TOB: 890.50 2-YEAR: 886.55 10-YEAR: 887.52 100-YEAR: 889.18 SPILLWAY: 889.61 SOUTHEAST BASIN BMP BOTTOM: 882.50 TOB: 889.00 2-YEAR: 885.62 10-YEAR: 886.20 100-YEAR: 886.63 SPILLWAY: 888.00 B B A A|Know what'sbelow. before you dig. Call R DRAWING NO. 4.5 N:\2018\18414\Drawings\ACAD\LD\S04.1\Sheet Drawings\CD\18414_C4.5 SITE SIGNAGE PLAN.dwg 5/17/2019DESCRIPTIONDATENO. R E V I S I O N SPROJECT NO.:PROJECT MANAGER:DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJORCARMEL INDIANASIGNAGE AND PAVEMENTMARKING PLANESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comLEGEND PLAN NOTES * ADA RAMP 08/20/20