Loading...
HomeMy WebLinkAboutC060.1 - STORM PLAN AND PROFILE 2HPP P P HPP P P HPP P P HPP P P H P P PP HPP P P HPP P P HPP P P HPP P P HP PP P HPP P P HPP P P HPP P P HPP PP HPP P P HPP P P HPP P P H PP PP HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P PPP P HPP P P HPP P P HPP P P H PPP P HPP P P H PPP P HPP P P H PPP P H PPP P HPP P P H PPP P H PPP P HP PP P HP P PP SEA Group,Land Su rveyors SEAG rou p, Lan dS urv eyors TOWNE ME ADOW DRIVE TOWNES * * * * MH-ETM04 MH-ETM03 MH-ETM02 28 LF - 12" RCP @ 0.32% 182 LF - 18" RCP @ 0.20% 218 LF - 18" RCP @ 0.20% 399 LF - 30" RCP @ 0.18% 89 LF - 30" RCP @ 0.25% 86 LF - 30" RCP @ 0.30% 132 LF - 15" RCP @ 0.80% 28 LF - 15" RCP @ 1.00% 84 LF - 18" RCP @ 0.45% 22 LF - 18" RCP @ 1.00% 28 LF - 18" RCP @ 1.00% 169 LF - 18" RCP @ 0.80% FH 6 FH 7 11.25° BEND 11.25° BEND 11.25° BEND 11.25° BEND 45.00° BEND 45.00° BEND SSD. RISER 890.01 SSD. RISER 890.70 SSD. RISER 891.32 6" SSD. 194 LF 6" SSD. 146 LF6" SSD. 146 LF 6" SSD. 260 LF SWALE 99LF @ 1.00%SWALE 100LF @ 1.00% SWALE 118LF @ 1.00%SWALE 168 LF @1.00%DIRECTIONAL 59 LF CONNECTION 16" WATER A WET TAP SSD. RISER 891.00 6" SSD. 170 LF SWALE 170LF @ 0.60% MH-ETM12 SWALE 198LF @ 1.00% VB 8 VB 9 MH-ETM13 DUCTILE IRON 8 IN X 8 IN-INCH DUCTI L E IRON 8 IN X 8 IN-INCH DUCTILE IRON 8 IN X 8 IN-INCH DUCTILE IRON 8 IN X 8 IN-INCH DUCTILE IRON 8 IN X 8 IN-INCH DUCTILE 8 IN X 8 IN-INCH DUCTILE IRON 200 LF - 21" RCP @ 0.20% 870 875 880 885 890 895 900 905 870 875 880 885 890 895 900 905 22 LF - 18" RCP @ 1.00% 28 LF - 18" RCP @ 1.00% STM 607 T.C. = 891.67 IE: 885.97 (N) IE: 885.87 (S) STM 608 RIM: 890.03 IE: 886.19 (S) STM 605 RIM: 889.66 IE: 884.04 (E) IE: 884.14 (N) IE: 883.94 (W) STM 606 T.C. = 891.67 IE: 885.59 (N) IE: 885.49 (S)892.1892.2892.1891.9891.7892.1891.64891.53890.64889.74892.180+00 1+00 2+00 8" PVC SAN. MAIN INV. = 883.98 CROWN = 884.67 8" WATER MAIN INV = 883.43 18" STRM. INV = 885.33 169 LF - 18" RCP @ 0.80% 50" SUMP AND SNOUT 24R (SEE DETAIL 05/C8.2) CONCRETE CRADLE 865 870 875 880 885 890 895 900 905 865 870 875 880 885 890 895 900 905 STM 609 RIM: 889.00 IE: 885.29 (S) STM 610 T.C. = 892.93 IE: 884.23 (N) IE: 884.13 (SE) STM 611 T.C. = 892.93 IE: 883.85 (NW) IE: 883.64 (SE) STM 612 RIM: 888.76 IE: 883.24 (E) IE: 883.26 (NW) IE: 883.14 (SW)893.4893.7893.4892.9892.1889.02894.48894.01892.94892.040+00 1+00 2+00 8" WATER MAIN INV. = 887.65 8" HPPPP GAS MAIN BOT. PIPE = 888.01 CROWN = 888.82 12" HPPPP GAS MAIN BOT. PIPE = 887.56 CROWN = 888.66 2.69'132 LF - 15" RCP @ 0.80% 28 LF - 15" RCP @ 1.00% 84 LF - 18" RCP @ 0.45% 50" SUMP AND SNOUT 24R (SEE DETAIL 05/C8.2) DRAWING NO. C6.1 N:\2018\18414\Drawings\ACAD\LD\S04.1\Sheet Drawings\CD\18414_C5.0 UTILITY PLAN.dwg 6/13/2019DESCRIPTIONDATE NO. R E V I S I O N S PROJECT NO.:PROJECT MANAGER: DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJORCARMEL INDIANASTORM SEWER PLAN & PROFILEESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comKnow what'sbelow. before you dig. Call R NOTES: 1. CONTRACTOR TO FIELD VERIFY LOCATION, INVERT, AND SIZE OF ALL EXISTING UTILITIES PRIOR TO ORDERING MATERIALS OR BEGINNING UTILITY WORK. CONTRACTOR TO NOTIFY ENGINEER OF ANY DISCREPANCIES IMMEDIATELY. 2. UNLESS INDICATED OTHERWISE, FRAME AND OPEN LID STORM STRUCTURES IN PAVEMENT SHALL BE NEENAH R-2502 WITH TYPE D LID OR APPROVED EQUAL, AND FRAME AND CLOSED LID STORM STRUCTURES IN PAVEMENT SHALL BE NEENAH R-1772 OR APPROVED EQUAL. FRAME AND OPEN LID STORM STRUCTURES IN OPEN SPACE SHALL BE R-4340-B OR APPROVED EQUAL. ALL FRAME AND GRATES SHALL CONFORM TO LOCAL MUNICIPALITY REQUIREMENTS. FRAME AND CLOSED LID STORM STRUCTURES LOCATED WITHIN AN ACCESSIBLE ROUTE SHALL BE “NEENAH R-1772 WITH TYPE C LID (OR EQUIVALENT) WITH PERMA-GRIP SURFACE. DRILL 1 - 1” DIAMETER LIFT HOLE INSTEAD OF A STANDARD PICK HOLE.” 3. LIGHT POLES SHOWN FOR COORDINATION OR LOCATION PURPOSES ONLY AND DO NOT REPRESENT ACTUAL SIZE. SEE PLANS BY SITE LIGHTING CONSULTANT FOR SITE LIGHTING INFORMATION. 4. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL.. KEY MAP N.T.S. 08/20/20