Loading...
HomeMy WebLinkAboutC060.4 - STORM PLAN AND PROFILE 5TRAILBLAZER COURT JASMINE DRIVE* * * * * * MH-ETM10 MH-ETM09 MH-ETM11 28 LF - 12" RCP @ 0.50% 138 LF - 15" RCP @ 0.60% 328 LF - 15" RCP @ 0.80% 28 LF - 12" RCP @ 0.40% 154 LF - 15" RCP @ 0.25% SSD. RISER 894.63 SSD. RISER 894.07 SSD. RISER 892.08 6" SSD. 92 LF 6" SSD. 294 LF 6" SSD. 90 LF 6" SSD. 22 LF SWALE 124 LF @ 1.00% SWALE 300 LF @ 1.00% SWALE 100 LF @ 1.00% 141 LF - 21" RCP @ 0.59% 865 870 875 880 885 890 895 900 905 910 865 870 875 880 885 890 895 900 905 910 STM 632 T.C. = 894.56 IE: 890.84 (E) 28 LF - 12" RCP @ 0.50% STM 633 T.C. = 894.56 IE: 890.70 (W) IE: 890.60 (E) 138 LF - 15" RCP @ 0.60% STM 634 RIM: 893.70 IE: 889.77 (W) IE: 889.62 (S) IE: 889.57 (E) FES 650 21" RCP IE: 886.00 (W)895.2894.6894.2893.3892.7893.2893.3894.1894.2893.7892.8892.0891.6890.4895.06894.57894.54894.04893.87894.68893.13892.63892.13891.63891.13891.38891.88888.010+00 1+00 2+00 3+00 4+00 5+00 6+00 8" PVC SAN. MAIN INV. = 879.33 CROWN = 880.02 328 LF - 15" RCP @ 0.80% STM 635 RIM: 891.00 IE: 886.93 (W) IE: 886.82 (E) 141 LF - 21" RCP @ 0.60% 37.5" SUMP AND SNOUT 18R (SEE DETAIL 05/C8.2) 865 870 875 880 885 890 895 900 905 910 865 870 875 880 885 890 895 900 905 910 154 LF - 15" RCP @ 0.25% STM 634 RIM: 893.70 IE: 889.77 (W) IE: 889.62 (S) IE: 889.57 (E)893.7893.7893.6893.1894.15894.15896.01895.110+00 1+00 CROWN = 881.66 8" PVC SAN. MAIN INV. = 880.97 28 LF - 12" RCP @ 0.40% STM 638 TC = 894.20 IE: 890.27 (N)STM 639 TC = 894.20 IE: 890.16 (S) IE: 890.01 (N) 37.5" SUMP AND SNOUT 18R (SEE DETAIL 05/C8.2) 870 875 880 885 890 895 900 905 870 875 880 885 890 895 900 905 21 LF - 12" RCP @ 2.00%STM 636 RIM: 891.80 IE: 888.02 (NE)890.1890.6891.95885.630+00 FES 637 12" RCP IE: 887.60 37.5" SUMP AND SNOUT 18R (SEE DETAIL 05/C8.2) DRAWING NO. C6.4 N:\2018\18414\Drawings\ACAD\LD\S04.1\Sheet Drawings\CD\18414_C5.0 UTILITY PLAN.dwg 5/17/2019DESCRIPTIONDATENO. R E V I S I O N SPROJECT NO.:PROJECT MANAGER:DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJORCARMEL INDIANASTORM SEWER PLAN & PROFILEESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comKnow what'sbelow. before you dig. Call R KEY MAP N.T.S. NOTES: 1. CONTRACTOR TO FIELD VERIFY LOCATION, INVERT, AND SIZE OF ALL EXISTING UTILITIES PRIOR TO ORDERING MATERIALS OR BEGINNING UTILITY WORK. CONTRACTOR TO NOTIFY ENGINEER OF ANY DISCREPANCIES IMMEDIATELY. 2. UNLESS INDICATED OTHERWISE, FRAME AND OPEN LID STORM STRUCTURES IN PAVEMENT SHALL BE NEENAH R-2502 WITH TYPE D LID OR APPROVED EQUAL, AND FRAME AND CLOSED LID STORM STRUCTURES IN PAVEMENT SHALL BE NEENAH R-1772 OR APPROVED EQUAL. FRAME AND OPEN LID STORM STRUCTURES IN OPEN SPACE SHALL BE R-4340-B OR APPROVED EQUAL. ALL FRAME AND GRATES SHALL CONFORM TO LOCAL MUNICIPALITY REQUIREMENTS. FRAME AND CLOSED LID STORM STRUCTURES LOCATED WITHIN AN ACCESSIBLE ROUTE SHALL BE “NEENAH R-1772 WITH TYPE C LID (OR EQUIVALENT) WITH PERMA-GRIP SURFACE. DRILL 1 - 1” DIAMETER LIFT HOLE INSTEAD OF A STANDARD PICK HOLE.” 3. LIGHT POLES SHOWN FOR COORDINATION OR LOCATION PURPOSES ONLY AND DO NOT REPRESENT ACTUAL SIZE. SEE PLANS BY SITE LIGHTING CONSULTANT FOR SITE LIGHTING INFORMATION. 4. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL.. 08/20/20