HomeMy WebLinkAboutC010.1 - GENERAL NOTES, LEGEND, ABBREVIATIONSDRAWING NO.
C1.1
N:\2018\18414\Drawings\ACAD\LD\S04.1\Sheet Drawings\CD\18414_C0.0 COVER.dwg 3/25/2019DESCRIPTIONDATENO. R E V I S I O N SPROJECT NO.:PROJECT MANAGER:DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJORCARMEL INDIANAGENERAL NOTES, LEGEND ANDABBREVIATIONSESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comX X
W
G
T/E
E
T
BENCHMARKEASEMENT LINE
FENCE LINE
CENTERLINE
PROPERTY CORNER
UNDERGROUND TELEPHONE
& ELECTRIC DUCT BANK
BURIED CABLE-TELEPHONE
SOIL BORING
TELEPHONE MANHOLE
CONTOUR
SPOT ELEVATION
WATER MAIN
GAS MAIN
CURB INLET
UTILITY STUB
POST INDICATOR VALVE
THRUST BLOCK
CONCRETE HEADWALL
FLARED END SECTION (F.E.S.)
SUBMERGED HEADWALL
GUY WIRES
FLOOD LIGHT
FIRE HYDRANT
LIGHT STANDARD
IRRIGATION HEADS
SIGN
UTILITY POLE
UTILITY TO BE ABANDONED
FEATURE TO BE REMOVED
DESCRIPTION
STORMWATER FLOW DIRECTION
SANITARY SEWER
STORM SEWER
SILT FENCE
WATER MAIN PROTECTION
RAILROAD TRACKS
GUARDRAIL
HAND HOLE
GATE VALVE IN VALVE VAULT
REVISION DELINEATION
STORMWATER OVERFLOW ROUTE
VALVE IN VALVE BOX
DRAINAGE STRUCTURE WITH OPEN LID
SANITARY FORCE MAIN
PROPERTY LINE (EXTERIOR)
LOT LINE (INTERIOR)
TREE
TREE LINE
TRAFFIC SIGNAL POLE
TELEPHONE PEDESTAL
TRANSFORMER PAD
UTILITY STRUCTURE WITH CLOSED LID
RIGHT-OF-WAY LINE
MONITORING WELL
CONSTRUCTION LIMIT LINE
REVERSE PITCHED CURB
RETAINING WALL
TREE PROTECTION FENCE
CURB & GUTTER
DEPRESSED CURB & GUTTER
DITCH CHECK
BURIED CABLE-ELECTRIC
TOP OF CURB ELEVATION
EDGE OF PAVEMENT ELEVATION
UTILITY CROSSING LABEL
RIP RAP
BOLLARD
BACK OF CURB
CATCH BASIN
FIRE HYDRANT
BACK TO BACK OF CURB
B/C
B-B
BM
CURB AND GUTTERC & G
CB
DRAWING
DIWM DUCTILE IRON WATER MAIN
DIAMETER
F/G FINISHED GRADE
F-F FACE TO FACE OF CURB
F/L
FH
FES
FLOW LINE
FLARED END SECTION
G
GV/VB
GV/VV
HDPE
HORIZONTAL
HP
HWL
IE
HIGH POINT
HIGH WATER LEVEL
INVERT ELEVATION
INLET
LP
L LEFT
MH MANHOLE
NWL NORMAL WATER LEVEL
PCC
PI
PRC
POINT OF INTERSECTION
POINT OF REVERSE CURVATURE
POINT OF TANGENCY
PROPERTY LINE
POINT OF CURVATURE
POINT OF VERTICAL INTERSECTION
PVC
PT
PL
PC
PVI
R
RIGHT OF WAY
SFM
SHT
SANITARY FORCE MAIN
SHEET
STATION
STORM MANHOLE
SUBMERGED HEADWALLSHW
STMH
S
SAN
SMH
SANITARY
SANITARY MANHOLE
T
T.C.
T/P TOP OF PIPE
TYP TYPICAL
VERTICAL
WATER MAINWM
ELEVATION
EJ EXPANSION JOINT
PP POWER POLE
PORTLAND CEMENT CONCRETE
VC VERTICAL CURVE
E
N NORTH
POINT OF VERTICAL CURVATURE
OR POLYVINYL CHLORIDE PIPE
SLOPE OR SOUTH
W WEST
OL OPEN LID
F & G FRAME & GRATE
TY TYPE
CL CLOSED LID
PUBLIC UTILITY EASEMENT
EAST OR ELECTRIC OR EDGE
E/P EDGE OF PAVEMENT
EXISTING
FINISHED FLOOR
GAS LINE
HDW HEADWALL
GATE VALVE IN VALVE BOX
GATE VALVE IN VALVE VAULT
HIGH DENSITY POLYETHYLENE PIPE
RCP REINFORCED CONCRETE PIPE
ST
TANGENT LENGTH OR TELEPHONE
LF LINEAL FEET
SF SILTATION FENCE
LOW POINT OR LIGHT POLE
BV/VV BUTTERFLY VALVE IN VALVE VAULT
BLDG BUILDING
IN
CL
DIP DUCTILE IRON PIPE
EX.
PGL PROFILE GRADE LINE
PVT POINT OF VERTICAL TANGENCY
RADIUS, RIM OR RIGHT
CENTERLINE
NOT IN CONTRACT / NOT INCLUDED
TOP OF CURB / TOP OF CASTING
STORM STRUCTURE OR STORM SEWER
HDCP HANDICAP
ON CENTER
UP UTILITY POLE
MW MONITORING WELL
T/W TOP OF WALL
MATCH EXISTING
F & OL
F & CL FRAME & CLOSED LID
FRAME & OPEN LID
CO CLEAN OUT
B/P BOTTOM OF PIPE
A ARC LENGTH
OR POINT OF COMPOUND CURVE
VERT
STA
DIA
DWG
ELEV
FF
HOR
ME
NIC
OC
PUE
ROW
710
706.0
782.62
782.12
SF
CLL
VCP VITRIFIED CLAY PIPE
C01
PROPOSED EXISTING
ATLAS LOCATED UTILITY
LEGEND
ABBREVIATIONSGENERAL NOTES
1. EXISTING SITE TOPOGRAPHY, UTILITIES, RIGHT-OF-WAY AND
HORIZONTAL CONTROL SHOWN ON THE DRAWINGS WERE
OBTAINED FROM A SURVEY PREPARED BY:
SEA GROUP
494 GRADLE DRIVE
CARMEL, IN 46032
COPIES OF THE SURVEY ARE AVAILABLE FROM THE
SURVEYOR. SITE CONDITIONS MAY HAVE CHANGED SINCE THE
SURVEY WAS PREPARED. CONTRACTORS TO VISIT SITE TO
FAMILIARIZE THEMSELVES WITH THE CURRENT CONDITIONS.
2. ALL EXISTING TOPOGRAPHY, UNDERGROUND UTILITIES,
STRUCTURES AND ASSOCIATED FACILITIES SHOWN ON THESE
DRAWINGS HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS
AND RECORDS. THEREFORE, THEIR LOCATIONS AND
ELEVATIONS MUST BE CONSIDERED APPROXIMATE ONLY.
THERE MAY BE OTHER FACILITIES, THE EXISTENCE OF WHICH
ARE NOT PRESENTLY KNOWN.
3. CONTRACTOR IS TO VERIFY ALL EXISTING STRUCTURES AND
FACILITIES AND NOTIFY ENGINEER OF ANY DISCREPANCIES
PRIOR TO ORDERING MATERIAL AND STARTING WORK.
4. ALL APPLICABLE PROVISIONS OF THE CURRENT
OCCUPATIONAL SAFETY AND HEALTH ACT ARE HEREIN
INCORPORATED BY REFERENCE.
5. THE CONTRACTOR SHALL SUBSCRIBE TO ALL GOVERNING
REGULATIONS AND SHALL OBTAIN ALL NECESSARY PUBLIC
AGENCY PERMITS PRIOR TO STARTING WORK. THE
CONTRACTOR, BY USING THESE PLANS FOR THEIR WORK,
AGREE TO HOLD HARMLESS V3 COMPANIES LTD., THE
MUNICIPALITY, THEIR EMPLOYEES AND AGENTS AND THE
OWNER WHILE ACTING WITHIN THE SCOPE OF THEIR DUTIES
FROM AND AGAINST ANY AND ALL LIABILITY, CLAIMS,
DAMAGES, AND THE COST OF DEFENSE ARISING OUT OF
CONTRACTOR(S) PERFORMANCE OF THE WORK DESCRIBED
HEREIN, BUT NOT INCLUDING THE SOLE NEGLIGENCE OF THE
OWNER, HIS AGENTS, THE ENGINEER, HIS EMPLOYEES AND
AGENTS.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
ALL REQUIRED PERMITS FOR CONSTRUCTION ALONG OR
ACROSS EXISTING STREETS OR HIGHWAYS. CONTRACTOR
SHALL MAKE ARRANGEMENTS FOR THE PROPER BRACING,
SHORING AND OTHER REQUIRED PROTECTION OF ALL
ROADWAYS BEFORE CONSTRUCTION BEGINS. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE STREETS
OR ROADWAYS AND ASSOCIATED STRUCTURES AND SHALL
MAKE REPAIRS AS NECESSARY TO THE SATISFACTION OF THE
OWNER OF THE ROADWAY.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
INSTALLATION AND MAINTENANCE OF ADEQUATE SIGNS,
TRAFFIC CONTROL DEVICES AND WARNING DEVICES TO
INFORM AND PROTECT THE PUBLIC DURING ALL PHASES OF
CONSTRUCTION. BARRICADES AND WARNING SIGNS SHALL BE
PROVIDED IN ACCORDANCE WITH THE INDOT STANDARD
SPECIFICATIONS. ALL TRAFFIC CONTROL WORK SHALL BE
DONE IN ACCORDANCE WITH THE "MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES."
8. EXCEPT WHERE MODIFIED BY THE CONTRACT DOCUMENTS,
ALL WORK PROPOSED HEREON SHALL BE IN ACCORDANCE
WITH THE FOLLOWING SPECIFICATIONS WHICH ARE HEREBY
MADE A PART HEREOF:
a. "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION" AS PREPARED BY INDOT, LATEST EDITION.
b. ”RECOMMENDED STANDARDS FOR WATER WORKS" LATEST
EDITION.
c. "RECOMMENDED STANDARDS FOR WASTEWATER
FACILIITIES"LATEST EDITION..
d. THE LATEST EDITIONS OF THE MUNICIPAL CODE AND
STANDARDS OF THE CITY OF CARMEL.
e. THE NATIONAL ELECTRIC CODE.
f. THE INDIANA ACCESSIBILITY CODE.
g. CLEAN CONSTRUCTION OR DEMOLITION DEBRIS (CCDD)
REQUIREMENTS AS PUBLISHED BY THE IEPA. TESTING OF
SOILS BEING EXPORTED FROM THE SITE AND APPROPRIATE
DISPOSAL SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
IN THE EVENT OF CONFLICTING SPECIFICATIONS WITH REGARD
TO SITE WORK ISSUES DESIGNED BY THE ENGINEER, THE
MORE STRINGENT REQUIREMENT SHALL GOVERN.
9. THE CONTRACTOR SHALL NOTIFY THE AUTHORITY HAVING
JURISDICTION AT LEAST 48 HOURS PRIOR TO COMMENCING
ANY WORK AND FOR ANY NEW CONSTRUCTION REQUIRING
INSPECTION.
10. ALL TREES TO BE SAVED SHALL BE IDENTIFIED PRIOR TO
CONSTRUCTION AND SHALL BE PROTECTED PER INDOT
STANDARDS. THE RIGHT-OF-WAY LINE AND LIMITS OF THE
CONTRACTOR'S OPERATIONS SHALL BE CLEARLY DEFINED
THROUGHOUT THE CONSTRUCTION PERIOD. ALL TREES
IDENTIFIED TO REMAIN SHALL BE PROTECTED FROM DAMAGE
INCLUDING TRUNKS, BRANCHES AND ROOTS. NO EXCAVATING,
FILLING OR GRADING IS TO BE DONE INSIDE THE DRIP LINE OF
TREES UNLESS OTHERWISE INDICATED.
11. CONSTRUCTION ACCESS POINTS TO THE SITE SHALL BE
PROTECTED IN SUCH A WAY AS TO PREVENT ACCUMULATION
OF MUD OR SOIL ON PUBLIC THOROUGHFARES. AT THE END OF
EACH DAY AND AS OFTEN AS OTHERWISE NECESSARY THE
CONTRACTOR SHALL CLEAN UP ALL MUD OR SOIL WHICH HAS
BEEN TRACKED ONTO PUBLIC STREETS AS REQUIRED BY THE
AUTHORITIES HAVING JURISDICTION AND AS DETAILED IN THE
STORM WATER POLLUTION PREVENTION PLAN, SHEET 3.4.
12. THE CONTRACTOR SHALL PROVIDE FOR THE SAFE AND
ORDERLY PASSAGE OF TRAFFIC AND PEDESTRIANS WHERE
HIS/HER OPERATIONS ABUT PUBLIC THOROUGHFARES AND
ADJACENT PROPERTY IN ACCORDANCE WITH THE CITY OF
CARMEL MUNICIPAL CODE AND INDOT REQUIREMENTS.
13. NO HOLES ARE TO BE LEFT OPEN IN THE PAVEMENT OR
PARKWAY OVER A HOLIDAY, WEEKEND OR AFTER 3:00 P.M. ON
THE DAY PRECEDING A HOLIDAY OR A WEEKEND.
14. ALL EXISTING PAVEMENT OR CONCRETE TO BE REMOVED
SHALL BE SAWCUT ALONG LIMITS OF PROPOSED REMOVAL
BEFORE COMMENCEMENT OF PAVEMENT REMOVAL.
15. REMOVED PAVEMENT, SIDEWALK, CURB AND GUTTER, ETC.
SHALL BE LEGALLY DISPOSED OF BY THE CONTRACTOR AS
PART OF THE BASE CONTRACT.
16. NO BURNING OR INCINERATION OF RUBBISH WILL BE
PERMITTED ON SITE.
17. FOR REGULATED UTILITY LOCATIONS, THE CONTRACTOR
SHALL CONTACT INDIANA811 AT 811 OR 800-382-5544. LOCAL
GOVERNMENT AGENCIES SHOULD BE CONTACTED BY THE
CONTRACTOR FOR LOCATION OF ALL NONREGULATED UTILITY
LOCATIONS. CALL FOR LOCATES AT LEAST 48 HOURS IN
ADVANCE OF CONSTRUCTION.
18. BEFORE EXCAVATING OVER OR ADJACENT TO ANY EXISTING
UTILITIES, CONTRACTOR SHALL NOTIFY THE OWNER OF SUCH
UTILITIES TO ENSURE THAT PROTECTIVE WORK WILL BE
COORDINATED AND PERFORMED BY THE CONTRACTOR IN
ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER OF
THE UTILITY INVOLVED. IF ANY EXISTING SERVICE LINES,
UTILITIES AND UTILITY STRUCTURES WHICH ARE TO REMAIN IN
SERVICE ARE UNCOVERED OR ENCOUNTERED DURING THIS
OPERATION, THEY SHALL BE SAFEGUARDED, PROTECTED
FROM DAMAGE AND SUPPORTED IF NECESSARY.
19. THE CONTRACTOR IS RESPONSIBLE FOR HAVING A SET OF
"APPROVED" ENGINEERING PLANS WITH THE LATEST REVISION
DATE ON THE JOB SITE PRIOR TO THE START OF
CONSTRUCTION.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION AND
SEDIMENTATION CONTROL AS DETAILED IN THE STORM WATER
POLLUTION PREVENTION SHEET 3.3.
21. ALL CURB RADII REFER TO BACK OF CURB.
22. ANY AREAS THAT ARE DISTURBED DURING CONSTRUCTION
SHALL BE RESTORED IN CONFORMANCE WITH THE
REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION
AND SHALL BE INCIDENTAL TO THE CONTRACT.
23. STREET PAVING AND CURBS TO REMAIN SHALL BE PROTECTED
FROM DAMAGE AND IF DAMAGED, SHALL BE REPLACED
PROMPTLY IN CONFORMANCE WITH THE MUNICIPALITY OR
INDOT STANDARD SPECIFICATIONS IN MATERIALS AND
WORKMANSHIP.
24. PROPOSED ELEVATIONS INDICATE FINISHED CONDITIONS. FOR
ROUGH GRADING ELEVATIONS ALLOW FOR THICKNESS OF
PROPOSED PAVING (ROADS, WALKS, DRIVES, ETC.) OR
TOPSOIL AS INDICATED ON DRAWINGS.
25. CAD FILES ARE AVAILABLE FOR CONSTRUCTION LAYOUT UPON
REQUEST.
26. BACKFILL SHALL BE PLACED NEXT TO THE CURB AS SOON AS
PERMISSIBLE AFTER CONSTRUCTION TO PREVENT SCOURING
AND UNDERCUTTING BY STORM WATER RUNOFF.
27. BUTT JOINTS SHALL BE PROVIDED WHEREVER NEW PAVEMENT
ABUTS EXISTING PAVEMENT. ALL BUTT JOINTS SHALL BE
CONSTRUCTED BY MILLING AND SHALL BE CONSIDERED
INCIDENTAL TO THE COST OF THE BITUMINOUS SURFACE
COURSE.
28. WHEN AN EXISTING DRAINAGE ROUTE, EITHER A STORM
SEWER OR WATERWAY, IS INTERRUPTED DUE TO
CONSTRUCTION, THE DRAINAGE ROUTE SHALL BE
REESTABLISHED TO ORIGINAL CONDITIONS BY THE END OF
THE SAME WORK DAY. POSITIVE DRAINAGE MUST BE
MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
29. PROVIDE SMOOTH VERTICAL CURVES THROUGH HIGH AND
LOW POINTS INDICATED BY SPOT ELEVATIONS. PROVIDE
UNIFORM SLOPES BETWEEN NEW AND EXISTING GRADES.
AVOID RIDGES AND DEPRESSIONS.
30. FINAL ADJUSTMENT OF FIRE HYDRANTS, VALVE VAULTS AND
MANHOLES TO FINISHED GRADE ARE INCIDENTAL TO THEIR
COST.
31. ANY EXISTING UTILITY STRUCTURES REQUIRING ADJUSTMENT
ARE TO BE ADJUSTED OR RECONSTRUCTED BY THE
CONTRACTOR TO THE UTILITY OWNER'S SATISFACTION.
ADJUSTMENTS OR RECONSTRUCTIONS NOT CALLED FOR ON
THE PLANS SHALL BE CONSIDERED INCIDENTAL TO THE
CONTRACT.
32. ALL UTILITY CONNECTIONS TO EXISTING LINES SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE REGULATIONS AND
TO THE SATISFACTION OF THE UTILITY OWNER.
33. PROVIDE TRENCH BACKFILL IN ACCORDANCE WITH THE CITY
OF CARMEL STARDARD DRAWING 10.31 ON SHEET C8.2.
BACKFILL SHALL BE PLACED AND COMPACTED PER THE
MUNICIPALITY AND INDOT SPECIFICATIONS. COST OF
BACKFILL IS TO BE CONSIDERED INCIDENTAL TO THE UTILITY
WORK.
34. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT
THE CONTRACTOR'S EXPENSE.
35. PRIOR TO DEMOBILIZATION, ALL WORK SHALL BE CLEANED
AND INSPECTED TO THE SATISFACTION OF THE AUTHORITY
HAVING JURISDICTION. THE COST OF THIS WORK SHALL BE
CONSIDERED INCIDENTAL TO THE CONTRACT.
36. THE GENERAL CONTRACTOR SHALL COORDINATE WITH
UTILITY COMPANIES TO PROVIDE CABLE TV, PHONE, ELECTRIC,
GAS AND IRRIGATION SERVICES. GENERAL CONTRACTOR
SHALL BE RESPONSIBLE FOR SECURING SITE LAYOUTS FOR
THESE UTILITIES AND SHALL COORDINATE AND PROVIDE
CONDUIT CROSSINGS AS REQUIRED. THIS COORDINATION
SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT. ANY
CONFLICTS IN UTILITIES SHALL BE CORRECTED BY THE
GENERAL CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER.
37. BAND-SEAL CONNECTORS OR EQUIVALENT SHALL BE USED TO
JOIN PIPES OF DISSIMILAR MATERIAL.
38. CONTRACTOR SHALL MAINTAIN ACCURATE RECORDS OF ALL
CONSTRUCTION IN CONFORMANCE WITH ALL MUNICIPAL AND
CLIENT REQUIREMENTS FOR USE IN PREPARING RECORD
DRAWINGS.
39. THE SUBCONTRACTOR SHALL INSTALL A 2”x4”x6' POST
ADJACENT TO THE TERMINUS OF UTILITY MAINS AND SERVICE
LINES. POSTS SHALL BE MARKED IN ACCORDANCE WITH THE
CITY OF CARMEL STANDARDS.
40. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING
ANY EXCAVATION. ANY DEWATERING REQUIRED SHALL BE
INCIDENTAL TO THE CONTRACT.
41. COPIES OF SOILS INVESTIGATION REPORTS MAY BE OBTAINED
FROM THE OWNER. ANY BRACING, SHEETING OR SPECIAL
CONSTRUCTION METHODS REQUIRED IN ORDER TO INSTALL
THE PROPOSED IMPROVEMENTS SHALL BE CONSIDERED
INCIDENTAL TO THE COST OF THE PROJECT. ANY ADDITIONAL
SOILS DATA NEEDED TO CONFIRM THE CONTRACTOR'S
OPINIONS OF THE SUBSOIL CONDITIONS SHALL BE DONE AT
THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL
OBTAIN THE OWNER'S WRITTEN AUTHORIZATION TO ACCESS
THE SITE TO CONDUCT A SUPPLEMENTAL SOILS
INVESTIGATION.
42. ALL FIELD TILE ENCOUNTERED DURING CONSTRUCTION
OPERATIONS SHALL BE CONNECTED TO THE PROPOSED
STORM SEWER OR EXTENDED TO OUTLET INTO A PROPOSED
DRAINAGE WAY AS DETERMINED BY THE ENGINEER. IF THIS
CANNOT BE ACCOMPLISHED, THEN IT SHALL BE REPAIRED
WITH NEW PIPE OF SIMILAR SIZE AND MATERIAL TO THE
ORIGINAL LINE AND PUT IN ACCEPTABLE OPERATIONAL
CONDITION. A RECORD OF THE LOCATION OF ALL FIELD TILE
FOR ON-SITE DRAIN PIPE ENCOUNTERED SHALL BE KEPT BY
THE SUBCONTRACTOR AND SUBMITTED TO THE ENGINEER
UPON COMPLETION OF THE PROJECT. ALL FIELD TILE REPAIRS
SHALL BE CONSIDERED AS INCIDENTAL TO THE CONTRACT
AND NO ADDITIONAL COMPENSATION WILL BE PROVIDED.
43. THE ENGINEER AND OWNER ARE NOT RESPONSIBLE FOR THE
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES
OR PROCEDURES, TIME OF PERFORMANCE, PROGRAMS OR
FOR ANY SAFETY PRECAUTIONS USED BY THE CONTRACTOR.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EXECUTION
OF HIS/HER WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS AND SPECIFICATIONS.
44. ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND
BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE
INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO
IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND
BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO
ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES,
MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS
TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE
OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL
BE BORNE BY THE DEVELOPER.
PROPOSED SWALE
RIM ELEVATIONR 706.0
BUCKEYE HIGH PRESSURE PETROLEUM PIPELINE
UTILITIES LIST
SANITARY
GAS
WATER
ELECTRIC
TRICO REGIONAL SEWER UTILITY
CONTACT PERSON: RYAN HARTMAN
PHONE NUMBER: 317-844-9200
VECTREN GAS
CONTACT PERSON: JOANIE CLARK
PHONE NUMBER: 317-447-2351
CARMEL WATER
CONTACT PERSON: STEVE COOK
PHONE NUMBER: 317-733-2855
DUKE ENERGY
CONTACT PERSON: JESSICA HERRINGTON
PHONE NUMBER: 317-776-5365
BUCKEYE PARTNERS
CONTACT PERSON: ROY BAUER
PHONE NUMBER: 317-370-3013
PANHANDLE EASTERN PIPELINE
CONTACT PERSON: TROY YACKLE
PHONE NUMBER: 317-733-3213
* DENOTES ADA COMPLIANT RAMP
08/20/20