Loading...
HomeMy WebLinkAboutC010.2 - DEMOLITION PLAN 1HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P H PPP P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P HPP P P SEA Group,Land Su rveyo rs SE A Gro up,La nd Su rveyors SEA Group,Land Su rveyo rs MH-KM407 Know what'sbelow. before you dig. Call R DRAWING NO. C1.2DESCRIPTIONDATENO. R E V I S I O N SPROJECT NO.:PROJECT MANAGER:DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJORCARMEL INDIANADEMOLITION PLANESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comDEMOLITION NOTES LEGEND G W W BOTH 36" RCP'S AND ASSOCIATED INLETS SHALL BE REMOVED ONLY AFTER FULL APPROVAL OF CONSTRUCTION PLANS REMOVE CONCRETE HEADWALL ONLY AFTER FULL APPROVAL OF CONSTRUCTION PLANS 36" RCP SHALL BE REMOVED ONLY AFTER FULL APPROVAL OF CONSTRUCTION PLAN EXISTING WETLAND REGULATED DRAIN EXISTING VEGETATION SHALL BE KILLED ONLY AFTER FULL APPROVAL OF CONSTRUCTION PLANS HORSESHOE DAM RIP RAP CORE FACED WITH 8" STONE EXISTING VEGETATION SHALL BE KILLED ONLY AFTER FULL APPROVAL OF CONSTRUCTION PLANS CONTRACTOR TO INSTALL STONE CROSSING WITH SAME CROSS SECTION AS CONSTRUCTION ENTRANCE. A TEMPORARY CULVERT MAY BE INSTALLED IF CONTRACTOR DEEMS NECESSARY. 08/20/20