HomeMy WebLinkAboutC020.1 - DEVELOPMENT PLAN AREA 2HPP
P
P
H PP PP
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
PP
HP P PP
HPP
P
P
H P PP P
HPP
P
P
HPP
P
P
HPP
P
P
HP PP P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
H PPP
P
H P PPP
H PPP
P
H P PPP
HPP
P
P
H P PPP
HPP
P
P
H PP PP
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
H PP PP
HPP
P
P
H PP PP
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
HPP
P
P
H PPP
P
HP PPP
H PPP
P
HP PPP
HPP
P P
HPP
P
P
HPP
P P
HPP
P
P
HPP
P P
HPP
P
P
H PPP
P
HPP
P
P
H PPP
P
HPP
P
P
HPP
P
P
HP PP P
HPP
P
P
HPP
P
P
H PPP
P
HPP
P
P
HPP
P
P
H PPP
P
HPP
P
P
HPP
P P
HP PP P
HP PPP
H PPP
P
HPP
P
P
HPP
P
P
HPP
P
P
HP PPP
HPP
P
P
HPP
P
P
HPP
PP
HPP
P
P
H PP PP
HPP
P
P
HPP
P
P
H P PPP
HP PP P
HP P PP
HPP
P
P
HPP
P
P
HPP
P
P
HP PPP
HPP
P P
HPP
P
P
HPP
P P
HP PP P
HP PPP
HPP
P
P
HPP
P
P
H P PPP
HPP
P
P
TOWNE MEADO W D RIVE
*
*
* *
* *
BASIN
883.92
886.00
887.09
889.23
SOUTHEAST BASIN
BOTTOM: 882.50
TOB: 889.00
2-YEAR: 883.33
10-YEAR: 885.18
100-YEAR: 887.40
PATH TO BE
THROUGH HIGH
PROPERTY IN THE
Know what'sbelow.
before you dig. Call
R
DRAWING NO.
C2.1
N:\2018\18414\Drawings\ACAD\LD\S04.1\Sheet Drawings\CD\18414_C2.0 DEVELOPMENT PLAN.dwg 2/5/2019DESCRIPTIONDATENO. R E V I S I O N SPROJECT NO.:PROJECT MANAGER:DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJOR---- CARMEL INDIANADEVELOPMENT PLAN - AREA 1ESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comFOR CONTINUATION SEE SHEET 2.3FOR CONTINUATION SEE SHEET 2.1KEY MAP
N.T.S.
AREA 2
MINIMUM FINISH FLOOR ELEVATION IS BASED OFF OF THE BELOW
CRITERIA, WHICHEVER IS HIGHER:
1. ONE (1) FOOT ABOVE THE NEAREST UPSTREAM OR DOWNSTREAM
SANITARY MANHOLE, WHICHEVER IS LOWEST.
2. TWO (2) FEET ABOVE THE 100 YEAR FLOOD ELEVATION.
3. 6" (0.5') ABOVE THE M.L.A.G.
MINIMUM FLOOD PROTECTION GRADE
MINIMUM LOWEST ADJACENT GRADE
1. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD
PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RESOLVE WITH THE
UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED SHALL BE RELOCATED TO WITHIN ONE FOOT OF THE PROPOSED RIGHT-OF-WAY LINE.
2. DEPTHS OF ALL EXISTING ONSITE UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION TO CONFIRM THERE ARE NO CONFLICTS WITH
OTHER UTILITIES, STORM SEWERS, OR STREETS. ANY CONFLICTS FOUND AFTER THE BEGINNING OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF
THE CONTRACTOR.
3. ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING.
THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT
CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW
THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.
4. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE
CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING
CONDITION OF THE RIGHT-OF-WAY.
SITE PLAN NOTES
PAVING LEGEND
TYPICAL SECTION - COLLECTOR STREET
SHEET C8.4
TOWNE ROAD
PAVEMENT SECTION
LOCAL STREET PAVEMENT
SECTION
SEE TYPICAL SECTION ON SHEET 8.4
DRAINAGE EASEMENT
30' REGULATED DRAINAGE EASEMENT
LEGEND
PROPOSED SWALE
SECTION 2 BOUNDARY
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED STORM STRUCTURE
PROPOSED UNDERDRAIN/SSD
PROPOSED SANITARY SEWER CLEANOUT
PROPOSED SANITARY SEWER MAIN/LATERAL
REGULATED DRAINAGE EASEMENT
PROPOSED BMP EASEMENT
PROPOSED WATER MAIN
PROPOSED BUILDING SETBACK LINE
LIMITS OF DISTURBANCE
PROPOSED EASEMENT
PEDESTRIAN TRAIL
SCOUR STOP TRANSITION MAT OR APPROVED
EQUAL
W
LIMITS OF EXISTING WETLANDS
LOT NUMBER
PAD ELEVATION
DENOTES FLOOD PROTECTION GRADES
MINIMUM FINISHED FLOOD
MINIMUM LOWEST ADJACENT GRADE
*DENOTES ADA COMPLIANT RAMP
PROPOSED TREE PROTECTION EASEMENT
PROPOSED BMP EASEMENT
SSD STUB FOR FUTURE CONNECTION.
08/20/20