HomeMy WebLinkAboutC030.1 - EROSION CONTROL PLAN AREA 2TOW
TOWNE MEADOW DRIVE
*
*
* *
6" SSD. 190 LF
6" SSD. 188 LF
6" SSD. 194 LF 6" SSD. 146 LF
6" SSD. 93 LF 6" SSD. 296 LF
6" SSD. 170 LF
6" SSD. 201 LF
6" SSD. 143 LF
TREE
PRESERVATION
EASEMENT
TREE PRESERVATION EASEMENT
TREE PRESERVATION EASEMENTTREE
PRESERVATION
EASEMENT
BMP EASEMENT
BM
P
EA
S
E
M
E
N
T
BMP EAS
E
M
E
N
T
BMP EASEMENT
BMP EAS
E
M
E
N
T
BMP EAS
E
M
E
N
T
BMP EASEMENT
Know what'sbelow.
before you dig. Call
R
DRAWING NO.
C3.1
N:\2018\18414\Drawings\ACAD\LD\S04.1\Sheet Drawings\CD\18414_C3.0 EROSION CONTROL PLAN.dwg 6/13/2019DESCRIPTIONDATENO. R E V I S I O N SPROJECT NO.:PROJECT MANAGER:DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJORCARMEL INDIANAEROSION CONTROL PLANESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comFOR CONTINUATION SEE SHEET 3.0FOR CONTINUATION SEE SHEET 3.2NOTES
1. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR.
2. IF SITE REMAINS INACTIVE FOR A PERIOD OF 2 WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE PLACE IN THE FORM
OF TEMPORARY SEEDING, MULCH, OR SPRAY ON POLYMER.
3. EROSION CONTROL BLANKET IS REQUIRED FOR ALL SLOPES 3:1 OR GREATER.
4. PORTABLE TOILETS MUST BE ANCHORED TO PREVENT SPILLS.
5. THERE SHALL BE NO DIRT, DEBRIS, OR STORAGE OF MATERIAL IN THE STREET.
CONSTRUCTION SEQUENCE
ANY DISCHARGE OF CONTAMINATED WATER DUE TO
DEWATERING SHALL OUTLET THROUGH EXISTING
VEGETATION OR FILTER BAGS THAT WILL NOT ADVERSELY
IMPACT STORM WATER QUALITY
PERSON ON SITE RESPONSIBLE FOR
EROSION CONTROL:
TIM WALTER
PHONE: (317) 863-2057
1. THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE CITY OF CARMEL PRIOR TO ANY CONSTRUCTING ON THE SITE
BEING STARTED. THE CONTRACTOR AND/OR DEVELOPER SHALL NOTIFY IDEM AND THE CITY OF CARMEL 48 HOURS PRIOR TO START OF
CONSTRUCTION.
2. FOLLOWING THE REQUIRED PRE-CONSTRUCTION MEETING THE CONTRACTOR SHALL INSTALL THE "POSTING AREA" ON THE NORTH SIDE OF THE
PROPOSED CONSTRUCTION ENTRANCE. THE POSTING AREA IS THE LOCATION WHERE A COPY OF THE APPROVED IDEM RULE 5 PERMIT,
APPROVED SWPP PLAN, SIGNED O&M MANUAL AND MAINTENANCE LOGS ARE TO BE LOCATED. THE CONTRACTOR SHALL CONSTRUCT THE
CONSTRUCTION ENTRANCE AFTER ALL POSTING REQUIREMENTS HAVE BEEN MET.
3. IMMEDIATELY FOLLOWING THE INSTALLATION OF THE CONSTRUCTION ENTRANCE, THE CONTRACTOR SHALL CONSTRUCT THE STAGING AREA.
4. AFTER THE STAGING AREA IS CONSTRUCTED, THE CONTRACTOR SHALL CONSTRUCT THE CONCRETE WASHOUT AREA PER SPECIFICATIONS ON
SHEET 3.4, CONCRETE WASHOUT AREA SHALL NOT BE REQUIRED IF CONCRETE TRUCK IS EQUIPPED WITH SELF-CONTAINED CHUTE SYSTEM,
SIMILAR TO SYSTEM PROVIDED BY ENVIROGUARD OR APPROVED EQUAL.
5. PRIOR TO ANY EARTH MOVING THE CONTRACTOR SHALL INSTALL ALL SILT FENCE AS SHOWN IN SHEET 3.0, 3.1 AND 3.2. THE DETAILS AND
SPECIFICATIONS FOR SILT FENCE INSTALLATION ARE LOCATED ON SHEETS 3.3 AND 3.4.
6. THE CONTRACTOR SHALL PROTECT ALL INLETS WITH DROP INLET PROTECTION BASKETS AND/OR STORM INLET PROTECTION AS SHOWN ON
SHEET 3.0, 3.1 & 3.2. THE DETAILS AND SPECIFICATIONS FOR THE DROP INLET BASKETS AND STORM INLET PROTECTION ARE LOCATED ON
SHEETS 3.3 AND 3.4.
7. WHEN THE SITE/CONSTRUCTION LIMITS ARE COMPLETELY STABILIZED, THE CONTRACTOR SHALL PROCEED TO GRADE THE SITE. THE MATERIAL
TO GRADE THE SITE SHALL BE EXCAVATED PER THE PROPOSED GRADING AS SHOWN ON SHEETS 2.6, 2.7 AND 2.8.
8. CONTRACTOR SHALL CUT PROPOSED SWALES.
9. UPON COMPLETION OF SWALES THE CONTRACTOR SHALL INSTALL THE PROPOSED EROSION CONTROL BLANKET AS SHOWN ON SHEETS 3.0, 3.1
& 3.2. THE DETAILS AND SPECIFICATIONS FOR THE EROSION CONTROL BLANKET CAN BE FOUND ON SHEETS 3.3 AND 3.4.
10. THE PROPOSED STORM SEWER AND SANITARY SEWER SHALL BE INSTALLED CONCURRENTLY WITH EACH OTHER WHEN CROSSINGS ARE
ENCOUNTERED.
11. THE CONTRACTOR SHALL PREPARE THE SUB-GRADE FOR THE PROPOSED ROAD SYSTEM. IF LIME STABILIZATION IS THE METHOD CHOSEN, DUST
SHALL BE KEPT TO A MINIMUM. DUST SHALL BE REMOVED FROM THE CONSTRUCTION VEHICLES PRIOR TO LEAVING THE SITE.
12. CONTRACTOR SHALL INSTALL ALL CONCRETE ROLL CURB.
13. CONTRACTOR SHALL INSTALL WATER MAIN. THE TRENCH AREA SHALL BE SEEDED AND MULCHED IMMEDIATELY FOLLOWING INSTALLATION OF
THE WATER MAIN.
14. CONTRACTOR SHALL HAVE ALL OTHER APPROPRIATE UTILITIES INSTALLED. IT IS ULTIMATELY THE RESPONSIBILITY OF THE CONTRACTOR TO
ENSURE THAT THE TRENCH AREA IS SEEDED AND MULCHED IMMEDIATELY FOLLOWING THE INSTALLATION OF EACH UTILITY.
15. CONTRACTOR SHALL INSTALL ALL ASPHALT PAVEMENT.
16. THE CONTRACTOR SHALL PERMANENT SEED ALL AREAS BETWEEN THE BACK OF CURB AND THE CONSTRUCTED PADS AND ALL OTHER AREAS
THAT ARE ILLUSTRATED ON SHEETS 3.0, 3.1 & 3.2. THE SEED MIXTURE AND RATE CAN BE FOUND ON SHEETS 3.3 AND 3.4.
17. THE CONTRACTOR SHALL SCHEDULE A SITE INSPECTION WITH THE CITY OF CARMEL TO ENSURE THAT THE SITE IS STABILIZED. AFTER THE
INSPECTOR APPROVES THE SITE CONDITIONS THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL PRACTICES.
18. THE POST-CONSTRUCTION EROSION CONTROL PRACTICES THEN BECOME THE RESPONSIBILITY OF THE DEVELOPER OF THIS PROJECT.
19. THE DEVELOPER OF THIS PROJECT SHALL CONTINUE TO MONITOR THIS SITE FOR GOOD HOUSEKEEPING ON THE POST-CONTRUCTION BMPS
UNTIL A NOT IS FILED WITH IDEM.
20. THE O&M MANUAL FOR THIS PROJECT MUST TO BE TRANSFERRED TO THE HOA BEFORE THE N.O.T. CAN BE RELEASED FOR THIS PROJECT.
NOTES
LEGEND
(N.P. & W)
(N.P.A.)(N.P.A.)(N.P.A.)(N.P.A.)(N.P.A.)(N.P.A.)(N.P.A.)(N .P.A.)
(N.P.A .)(N.P.A.)(N.P.A.)08/20/20