Loading...
HomeMy WebLinkAboutC030.2 - EROSION CONTROL PLAN AREA 3SEA Group,Land Su rveyors SEAG rou p, Lan dS urv eyors TOWNE MEADOW DRIVE TOWNE ROADSUTTON AVENUE * *6" SSD. 146 LF6" SSD. 146 LF 6" SSD. 260 LF PERMIT POSTING CONSTRUCTION DUMPSTER CONCRETE WASHOUT AREA FUEL TANK (DOUBLE WALL) CONSTRUCTION STAGING AREA CONSTRUCTION ENTRANCE Know what'sbelow. before you dig. Call R DRAWING NO. C3.2 N:\2018\18414\Drawings\ACAD\LD\S04.1\Sheet Drawings\CD\18414_C3.0 EROSION CONTROL PLAN.dwg 6/13/2019DESCRIPTIONDATE NO. R E V I S I O N S PROJECT NO.:PROJECT MANAGER: DRAWN BY:DESIGNED BY:ORIGINAL ISSUE DATE:18414DECEMBER 14, 2018JORPLDJORCARMEL INDIANAEROSION CONTROL PLANESTATES AT TOWNE MEADOWDESCRIPTIONDATE NO. 619 N Pennsylvania StIndianapolis, IN 46204317.423.0690 phonewww.v3co.comFOR CONTINUATION SEE SHEET 3.1NOTES 1. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. 2. IF SITE REMAINS INACTIVE FOR A PERIOD OF 2 WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE PLACE IN THE FORM OF TEMPORARY SEEDING, MULCH, OR SPRAY ON POLYMER. 3. EROSION CONTROL BLANKET IS REQUIRED FOR ALL SLOPES 3:1 OR GREATER. 4. PORTABLE TOILETS MUST BE ANCHORED TO PREVENT SPILLS. 5. THERE SHALL BE NO DIRT, DEBRIS, OR STORAGE OF MATERIAL IN THE STREET. CONSTRUCTION SEQUENCE ANY DISCHARGE OF CONTAMINATED WATER DUE TO DEWATERING SHALL OUTLET THROUGH EXISTING VEGETATION OR FILTER BAGS THAT WILL NOT ADVERSELY IMPACT STORM WATER QUALITY PERSON ON SITE RESPONSIBLE FOR EROSION CONTROL: TIM WALTER PHONE: (317) 863-2057 1. THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE CITY OF CARMEL PRIOR TO ANY CONSTRUCTING ON THE SITE BEING STARTED. THE CONTRACTOR AND/OR DEVELOPER SHALL NOTIFY IDEM AND THE CITY OF CARMEL 48 HOURS PRIOR TO START OF CONSTRUCTION. 2. FOLLOWING THE REQUIRED PRE-CONSTRUCTION MEETING THE CONTRACTOR SHALL INSTALL THE "POSTING AREA" ON THE NORTH SIDE OF THE PROPOSED CONSTRUCTION ENTRANCE. THE POSTING AREA IS THE LOCATION WHERE A COPY OF THE APPROVED IDEM RULE 5 PERMIT, APPROVED SWPP PLAN, SIGNED O&M MANUAL AND MAINTENANCE LOGS ARE TO BE LOCATED. THE CONTRACTOR SHALL CONSTRUCT THE CONSTRUCTION ENTRANCE AFTER ALL POSTING REQUIREMENTS HAVE BEEN MET. 3. IMMEDIATELY FOLLOWING THE INSTALLATION OF THE CONSTRUCTION ENTRANCE, THE CONTRACTOR SHALL CONSTRUCT THE STAGING AREA. 4. AFTER THE STAGING AREA IS CONSTRUCTED, THE CONTRACTOR SHALL CONSTRUCT THE CONCRETE WASHOUT AREA PER SPECIFICATIONS ON SHEET 3.4, CONCRETE WASHOUT AREA SHALL NOT BE REQUIRED IF CONCRETE TRUCK IS EQUIPPED WITH SELF-CONTAINED CHUTE SYSTEM, SIMILAR TO SYSTEM PROVIDED BY ENVIROGUARD OR APPROVED EQUAL. 5. PRIOR TO ANY EARTH MOVING THE CONTRACTOR SHALL INSTALL ALL SILT FENCE AS SHOWN IN SHEET 3.0, 3.1 AND 3.2. THE DETAILS AND SPECIFICATIONS FOR SILT FENCE INSTALLATION ARE LOCATED ON SHEETS 3.3 AND 3.4. 6. THE CONTRACTOR SHALL PROTECT ALL INLETS WITH DROP INLET PROTECTION BASKETS AND/OR STORM INLET PROTECTION AS SHOWN ON SHEET 3.0, 3.1 & 3.2. THE DETAILS AND SPECIFICATIONS FOR THE DROP INLET BASKETS AND STORM INLET PROTECTION ARE LOCATED ON SHEETS 3.3 AND 3.4. 7. WHEN THE SITE/CONSTRUCTION LIMITS ARE COMPLETELY STABILIZED, THE CONTRACTOR SHALL PROCEED TO GRADE THE SITE. THE MATERIAL TO GRADE THE SITE SHALL BE EXCAVATED PER THE PROPOSED GRADING AS SHOWN ON SHEETS 2.6, 2.7 AND 2.8. 8. CONTRACTOR SHALL CUT PROPOSED SWALES. 9. UPON COMPLETION OF SWALES THE CONTRACTOR SHALL INSTALL THE PROPOSED EROSION CONTROL BLANKET AS SHOWN ON SHEETS 3.0, 3.1 & 3.2. THE DETAILS AND SPECIFICATIONS FOR THE EROSION CONTROL BLANKET CAN BE FOUND ON SHEETS 3.3 AND 3.4. 10. THE PROPOSED STORM SEWER AND SANITARY SEWER SHALL BE INSTALLED CONCURRENTLY WITH EACH OTHER WHEN CROSSINGS ARE ENCOUNTERED. 11. THE CONTRACTOR SHALL PREPARE THE SUB-GRADE FOR THE PROPOSED ROAD SYSTEM. IF LIME STABILIZATION IS THE METHOD CHOSEN, DUST SHALL BE KEPT TO A MINIMUM. DUST SHALL BE REMOVED FROM THE CONSTRUCTION VEHICLES PRIOR TO LEAVING THE SITE. 12. CONTRACTOR SHALL INSTALL ALL CONCRETE ROLL CURB. 13. CONTRACTOR SHALL INSTALL WATER MAIN. THE TRENCH AREA SHALL BE SEEDED AND MULCHED IMMEDIATELY FOLLOWING INSTALLATION OF THE WATER MAIN. 14. CONTRACTOR SHALL HAVE ALL OTHER APPROPRIATE UTILITIES INSTALLED. IT IS ULTIMATELY THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT THE TRENCH AREA IS SEEDED AND MULCHED IMMEDIATELY FOLLOWING THE INSTALLATION OF EACH UTILITY. 15. CONTRACTOR SHALL INSTALL ALL ASPHALT PAVEMENT. 16. THE CONTRACTOR SHALL PERMANENT SEED ALL AREAS BETWEEN THE BACK OF CURB AND THE CONSTRUCTED PADS AND ALL OTHER AREAS THAT ARE ILLUSTRATED ON SHEETS 3.0, 3.1 & 3.2. THE SEED MIXTURE AND RATE CAN BE FOUND ON SHEETS 3.3 AND 3.4. 17. THE CONTRACTOR SHALL SCHEDULE A SITE INSPECTION WITH THE CITY OF CARMEL TO ENSURE THAT THE SITE IS STABILIZED. AFTER THE INSPECTOR APPROVES THE SITE CONDITIONS THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL PRACTICES. 18. THE POST-CONSTRUCTION EROSION CONTROL PRACTICES THEN BECOME THE RESPONSIBILITY OF THE DEVELOPER OF THIS PROJECT. 19. THE DEVELOPER OF THIS PROJECT SHALL CONTINUE TO MONITOR THIS SITE FOR GOOD HOUSEKEEPING ON THE POST-CONTRUCTION BMPS UNTIL A NOT IS FILED WITH IDEM. 20. 20. THE O&M MANUAL FOR THIS PROJECT MUST TO BE TRANSFERRED TO THE HOA BEFORE THE N.O.T. CAN BE RELEASED FOR THIS PROJECT. NOTES LEGEND 08/20/20