HomeMy WebLinkAboutA102 Roof Plan�f � ; � `•.��
� 1 st Floor Reflected Clg Plan
�
L SCALE:7/4'. = 1'_0" p z, a, g,
I
�
N
�
GENERAL CEILING NOTES:
1 Ceiling height designated by benchmark above
finished floor (AFF.)
2 Each room to have individual switch located on
wall at doorway to room, typical unless noted
otherwise. In locations of 2 or more switches in
close proximity, switches ar to be consolidated to a
gang plate condition.
3 Trades to coordinate [he heigh[ of roof stack vents
and condensate lines to allow for ceiling heighis
as indicated on the reflected ceiling plan.
4 See RCP plan for ceiling heights.
5 Use level 5 fnish on gypsum wall board on
finished ceilings.
CEILING NOTES:
1 Provide 1/4" control joint to be: Fry Reglet
DRM-50-25-2-PC or equal. Reference detail xlxxx.
2 Align finished faces.
3 Provide air vent in ceiling soffit. Reference M-
series dwgs. Center in soffit.
4 All interior walls to be at a height of 10'-0" unless
otherwise noted.
5 Reference E-series dwgs. for lighting schedule
6 Camera mounted in sofft north of entry door.
Coordinate w/ITforexactlocation.
FASTEN HT 12' O C. IN
BOTH �IRECTIONS
EXTEN� FLASHING MEMBRANE
H MINIMUM OF 3" BEVON�
METHLFLANGETO
NCCOMMO�ATEAMINIMUM
iS'HtHI WtLIJtDSEHM
MINIMUM THROOGH
WALLSCUPPERFLANGE
SET IN BEAD OF BUTYL
SEALANT
WATERPROOFSHEET
MFTAI THROUGH
scuPVEasEcurzEoro
suesranTE
IN9WLLFHSTENEF � /f' �
PLNTEAMINIMUMOF�" �� 4��
BEYOND SCUPPER [ 4:, � 5 �
FLNNGEHN�SPACE� i
MAXIMIIM OF 12'HPART
E#6NIJ FLASHING MtMBRANE
HMINIMUMOF3"9FYON� ���
METHLFLANGETO �
NCCOMMO�ATEAMINIMUM /
15" HEAT WELDED SEAM �
SEPARATOR SHEET �
VAPOR RETARDER/AIR
BARRIER
BASE SHEET/NNCHOR
SHEET
�
THROUGH WALL
SCUPPER
VINYL COATED METHL
� TAPEftE01N3l1LATION
SUMPATPRIMAHY
�MEM6RANEFLASHING THROUGHWALL
�/ SCUPPERS
� VINYLCOATED METAL
PATCH
REL� MEMBRANE
`� INSULATION
INSIILATION
MALBARRIER
�ECK
4NGE
corrEk
PEOCOR DESIGN GROl1P LLC
Archileclure I Project ManagemenL
355 Giry Center �rive
Wrmel, Intliana 46032
3177057979 (phane)
3177057980 (faz)
00033126
� s1nTE oF ,
(/ �
\ i
_��
� ❑
� � �
�
�
KEY PLAN �
Bldg I
su�e. rv.s
a�nu Noarx
Developer.
P E D C O R
�� ����
DEVELOPMENT CO.
Projecf.
�
L ^,
O W
L
O�
�
� � N
M
'�^ � �
v , � Z
w V —
� � �
cv
V � �
J �
� O
�
�
.ME reCONSTRUCTION
DOCUMENTS
Setlssue oate Sheetlssue Date
3/�3I2020 3/13I2020
Drawn By Checketl By
Sheet Title'
Roof Plan
Sheet Number�
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�y,:a���'.�`� �,�:;vaYa/„1��.
DATE: 08�Z � �2O
� Scupper Detail
\✓G / SCALE 3" = 1'-0" 0 3�. s�. y.�
��
� Scupper Detail
\✓ � J SCALE:3" = 1'-0" o a" s" s"
��
ROOF PLAN GENERAL NOTES:
1 Roof Plan A102 references and details the metal
stud composition of all parapet walls with a cutting
plane of +6'-0" above roof deck.
2 PVC roofng goes up the back side of all parapets
U.N.O.
ROOF PLAN NOTES:
1 Vent stacks, reference P series drawings. Follow
roofng manufacturer's required flashing details for
curbs and penetrations
2 Pre-finished metal roof scuppec Ref. dtls. D1l
A102 & D2IA702.
3 Plumbing vent. Ref. P-Series drawings. Follow
roofng manufacturer's required flashing de[ails for
curbs and penetrations
4 Mechanical equipment. Ref. mechanical
drawings. Follow roofng manufacturer's required
flashing details for curbs and penetrations
5 Polyvinyl-chbride (PVC) , over 5I8" glass-mat
water resistant gypsum cover bd., over 4"
polysryrene bd. Insulation, and 6 mil. polyethylene
vapor barrier & 5/8" glassmat water resistant
gypsum substrate bd.
6 Tapered roofng @ 1/2":1'
7 Pre-finished metal roof parapet cap, ref. A3/A303
8 Pre-finished metal downspout.
9 Break in structural roof decking requires change in
insulation thickness
10 Roof vents, ref. M-Series sheets
11 Provide crickets at any mechanical curb, typ.
12 PVC membrane Flashing over existing brick veneec.
Ref. detail A1/A501.
13 PVC membrane Flashing CMU parapet wall, Ref.
detail Bi/A501.
��l O�
N
� Roof Plan �
I SCALE il4" = 7'_0„ p p, q, a,
Project Number.