Loading...
HomeMy WebLinkAboutC301 GRADING & DRAINAGE PLANGRADING GENERAL NOTES 1. PROVIOEPOSRIVEORNNAGEINPLLARFAS. PAVINGCON7RACTORSIWLTESTFOR ANY PoNDING CANDIIqNS PFTER INSTALLATION AND CORRECT. 2. PROVIOESM� NECESSARY. E%ISIING FEANRES AS 3. ALLRREASWHEREPROPOSEUASPHRLTPAVEMEH�MEEfSTHEIXISTINGPAVEMEM TXE FJOS7ING PAVEMENi EDGE SHALL BE PROPERLYSEALEU WITH ATAq( COAT hUTERNL. d. THEEXCAVATINGCONiRACTORMUSTTW(EPAR71CUlARCARENhIIIEFXCAVATING AROUND IXISTING 1REES SO NOTTO DISTURB AND TO MINIMIZE OR ELIMINATE �NMA�ETOROOTSVSTEM. 5. THEEYCAVATINGCAN7RACTORMUSTTPI�PAR71CUfARCAREWHENIXCAVA7INGIN ANUAROUNO E%ISTING UTILITY LINESAND E�UIPMEM. VERIF1'COYER REQUIREMEMS BY MLITV CANfFtACTORSANDIOR UIRI7VCOMPANIES SO NOTTO CAUSEDAMACsE. 8. THEEYCAVNTINGCON7RACTORORWNDSCAPMGCANTRACTORSHPLLINSTPLLIHE FlNISH GRNDE AT VY BELOW PAVEMEMS WHEN SHEEf DRAINAGE IS PROPOSED ACROSSTHATSEEDEDAREA 7. ALLAREASWHERET7EE%ISTINGPAVEMENTORPAVEMENTSAREDAMAGEDDURING OR SUPPLIERS, SHPLL BE RESUR ORIGINAL CONDITION AF7ER THE ALL STORM SEWER SHALL BE PRIVATE LEGEND 835.19 834.69 &ii54 �: ELEVATION INDICATES MATCH E%ISTING GRADE �-8p�_� PROPOSEDGROUNDCONTWR IXISTING GROUND CONTOWt EtlSTING STORIA SEWER SUBCOMRACTORS IEASTTOTHEIR EtlSTING STORAI INIET (ADJUST CAS7ING TO PROPOSED GRROES SHOYM) E%ISTING STORM MANHOLE (A W UST CASTNG TO PROPOSEU GRA�ES SNOW N) C� CINCLE DESIGN GHOUP �� � �w�. w�u mn„wm Engineer: No. 910023 STAIE OF .� , � r � � t� � � �I KEY PLAN CARMEL CITY CEN7ER 6GUE: Nf6 PVNNOmx Developer: P E D C O R (Ji� ve�i,t,ez DEVELOPMENT CO. Pmject � ` O w � W � � U� � � Z �+ J � U � � J av m U � a �� RELEA5E0 FOR CONSTRIlCTION � Su6jec��ocompliancewithallregula�ions � � � of S�a�e antl Local Codes City of Carmel : S belOW. p �efore you dig. �{�n„� i,.va�� DATE: 08�2 � �2O GRADING & DRAINAGE PLAN SCALE: 7'=10' N O NO EARTH DISTURBWG ACTIVITIES MAY COMMENCE WITHOUT AN APPROVED STORMWATER MANAGEMENT PERMIT TOPSOIL S7RIPPING, STOCKPNNG ANO RE—OIS7RIBUIION: �o not remove sMpped lopsoil from prqecl sile. Stockpile an� evenly re—tlisinbute all lopsoil for use Eunng finish gmding to match pmposed eleva�ions shown on pmjed gmding plvns. �eplh of ploced toD�il will vory AepenOent on amounf genemled from slnpping opemtions anE a minimum depth o( 4" shall be placed onsite. Impoded fopsoil per specificotions may De needeA lo meet minimum Cepth requirements. Contraclor shall be wreful not lo compact or damage the natuml lopsoil strucWre with unnecessory m ving, handling, driving on or stockpiling above fi' in heiqht See IonOscape specificalions for further infartnalian on Slortn Water Basin lopsoil. Se[Issue Date Sheetlssue Date Drawn By Checked By iNi Last Revision Date: Sheet Title: GRADING 8� DRAINAGE PLAN Sheet Number: C301