EROSION CONTROL PLAN O
scue: r=m
SESC REQUIREMENTS:
7. ALLEROSIONCANRtOLPRACTICESSNALLBEINACCORDANCEWI7FITIE'INDWNA
STORM WAIEN QUALITY MANUAL'ANU7HE SCS'FIELD OFFlCE TECMNICFL GUI�P.
2. THEEROSKKJfAMROLMEASURESINCLUDEUINTHISPLWSHALLBEINSTrllLEUPRIOR
TO INIINL W!D OIS7URBANCEACIMTIESORAS SOON AS PRACTICAL. SEDIMENT SHALL
BE PREVENTED FROM DISCHARGING FROM 7XE PFtQIECTSITE BV INSTPLLING AND
MAINTAINING SILTFENCE, SiRAW BPLES, SEDIAIENT BASINS, EfC. AS SHONM ON T71S
PUN.
3. ALLONSIIESTORMDRAININLETSSfNLLBEPftOlEC7EDAG4INSTSE�IMENTATIONV
S7RAW BALES. FlLTER FABRIC, OR E�UNALENT BARRIERS AS SHOWN ON 7HIS PLAN.
4. IXCEPTAS PREVEMED BY INCLQAENT WENHER CONDITIONS ORO7HER
CIRCUMSTANCES BEYONDIHE CONTROL OF THE CONRtRCTOWDEVELOPER
APPROPRIAIE EROSION fANikOL PFACTICES N1LL BE INIM7ED WIMIN Q) SEVEN DAVS
OF THE UST UNE DISTURBINC ACTMTYNTTHE SRE.7HE SITE SHALL BE 5TA&LRED BV
SEEDING, SODDING, MULCHING, COVERING, OR BYO7HER EWNALEM EROSION
CONTROLIAEASURES.
5. TNISERQSIONCONiROLPLWSNALLBEIMPLEMEN7EDONALLDISNRBEDPREAS
WI7MIN lME fANS7RUCTION SIIE. PLL MEASURES INVOLVING EROSION CANTROL
PRAC7ICES SHALL 8E INSTPLLm IMDEk THE GUIDANCE OF AOUPLIFIm PEkSONNEL
IXPERIENCED IN ER0.510N CON7ROL PND FOLLOWING 7HE %ANSAND SPECIFICA710NS
INCLUOED HEREIN.
8. DURINGTNEPERIOUOFCON57RUCTIONACiMTV,ALLSE�IMENTBASINSPN�O7NER
ER0.SION CONIROL MEhSURES SHALL BE M4IMAINED BYTHE COMRACTORATIME
COMPLE710N OF CONSTRUC710N. THECONR7NCTOR SHALL COORDIINTE THE
TRANSFER OF REQUIRED MAIMEIUNCE RESPoNSIBRIIIES WIIH THE OWNER
7. PIIBLICORPRNAlEROADWAVSSHPLLBENEPTCLEAREDOFACCUMUTAIEDSEdMEM
BULKCLEARINGOFACCUMUTATE�SEDIMEMSH4LLNOTINCLUOEFLUSHINGTNEAREA
WI7H WAIER. CLEPRED SmIMEfi�SWJ.L BE RENRNED TO1HE POINT OF LII�LYORICIN
OROTHERSURABLELOCATION.
B. THECOMRACTORSHALLfAN7ROLWASTES,GMBAGE,OEBWS,WASTEWATER�D
OTHERSIIBSTPNCES ON lHE SITE IN SUCHA WAV iHATT1EYSHALL NOT BE
TRFNSPOR7ED FROM iHE SIIE BY THEACTION OF WINDS. STORM WATER RUNOFF.OR
OTHER FORCES PIiOPER UISPQSAL ON MNNAGEMENT OF ALL WASTES PND UNUSED
BUILOING MAIERINISl�PWiOPRIAIE TO7HE NA7URE OF7HE WASIE ORMATERIFL IS
RE�UIRED.
8. ALLEROSIONCqNRtOLMEA$URESINUICATEDSXALLBEMAINTAINEDBYIHE
CONII+ACTOR ON BENAIF OF THE OWNER. ADOIIIONAL EROSION CANTFIOL MEASURES
MAY BE REW IREDlS DIREC7ED BY THE CONTRACTOR'S SITE INSPECTOR OR BY THE
aTroFcnx��.
RESPONSIBLE PERSON:
FOR IMPLEMEMING ER0.SION COMROL PRAC7M.ES:
STEVEWARNE
ONE PEDCOR S�IIPRE 720 3RD AVENUE S.W.
CARMEL, M d60ffi
PN:917d533188
EROSION CONTROL LEGEND
INLEfSILTPROTECTION(SEEDEfAILONSHEEfC402) � �
SILTFENCE(SEEDEfFILONSMEEfG02) ���
cor+ca�wasi+our(s�oera�or+sxeErcws) �
SEEDINGWIMULCHAPPLIFD(SEE�EfAILONSHEEfCI02) OS
TEMPORARVCONS7ItUCTIONEMIWNCE(SEEOEfAILONSHEEfG02) �
INSTALLATION SEQUENCE:
1. IqSTALL7EMPoRARYfAI
EN7RANCES,SILTFENCE
2 INSTALL INLEf PROTECTION
& STFUPttIP501LANOSTOREINAPPROVEDAREA
d. 0.0UCH fiFME SITE AND CONSikUCT BUI LDINC PAD
S SEmDISTURBRREAS
8. FINALGRPDEAFIERBURDINGfANS7RUCTION
�. RE-SEEUDISNRBAREAS
& REMOVETEMPORA0.VEROSIONCONRIOL
MEASURES RFTER E%POSEO SOIL IS
STFBILIZEU BY SEEDINC
ALL DISTURBED AREAS THAT ARE LEFT
UNSTABILIZED FOR 7 DAYS SHALL RECEIVE SEED
AND MULCH.
NOTE: ALL CASTINGS SHALL BE LABELED "DUMP
NO WASTE — DRAINS TO WATERWAY"
PROVIDE PROTECTION BETWEEN IMPROVEMENTS
AND THE BUILDING FOUNDATION FOR AREAS
ADJACENT TO BUILDWGS, CONSTRUCTED PRIOR
TO THE BUILDINGS BEING CONSTRUCTED, IN THE
FORM OF 6" OF #2 STONE ON TOP OF AN
APPROPRIATE GEO—TEXTILE.
C CINCLE DESIGN GROUP
�u�nn���
Engineer'
No.
910023
STAIE OF
.� ,
1 �
� � t�
� � �I
KEY PLAN
CARMEL CIN CENTER
scuE x�e
vW��NOmx
Developer:
P E D C O R
[�:� vB�i,t,ez
DEVELOPMENT CO.
Project
Y/
`
O w
� W �
� U�
� � Z
�+ J �C
C
U��
J av
m U
�
a
Se[Issue Date Sheetlssue Date
Drawn By Checked By
Last Revision Date:
snee� r�ne:
EROSION CONTROL
PLAN
Sheet Number:
C401
DATE: 08�2 � �2O