Loading...
HomeMy WebLinkAboutGN010.0GENERAL NOTES: -PAINT ALL ROOMS INCLUDING CEILING UNLESS OTHERWISE NOTED -REPLACE ALL TRIM, CROWN, CASING, & DOORS UNLESS OTHERWISE NOTED -REPLACE ALL FLOORING IN EVERY ROOM LIVING ROOM 1 DO NOT REMOVE SLIDERS DEMO & PREP NOTE 1 POINT LOAD FROM SECOND FLOOR DEMO & PREP NOTE 2 DEMO WALL PANELING (OWNER) DEMO & PREP NOTE 1 REMOVE ALL RECESSED CANS IN LIVING ROOM AND KITCHEN ELECTRICAL NOTE 2 REMOVE BOOKCASE (OWNER) DEMO & PREP NOTE 1 REMOVE EXISTING BEAMS (OWNER) DEMO & PREP NOTE 1 REMOVE MANTEL (OWNER) DEMO & PREP NOTE D1D1 D2D2 D3D3 E4E4 D15D15 D16D16 D21D21 D1D1 D2D2 D3D3 E4E4 D15D15 D16D16 D21D21 KITCHEN 1 HVAC & ELECTRICAL WILL NEED TO BE MOVED DEMO & PREP NOTE 1 REMOVE ALL TRIM AND CASING ON FIRST FLOOR DEMO & PREP NOTE 1 REMOVE BAY WINDOW (KEEP WINDOWS AND REUSE) DEMO & PREP NOTE 1 REMOVE EXISTING FLOORING DEMO & PREP NOTE 1 REMOVE EXISTING LIGHT FIXTURE OVER KITCHEN TABLE DEMO & PREP NOTE 1 REMOVE WALL DEMO & PREP NOTE 1 REMOVE ALL RECESSED CANS, CEILING FANS, & PENDANTS ELECTRICAL NOTE D1D1 D2D2 D3D3 D4D4 D5D5 D6D6 E7E7 D1D1 D2D2 D3D3 D4D4 D5D5 D6D6 E7E7 BATHROOM 1 DO NOT TOUCH VANITY DEMO & PREP NOTE 1 OWNER TO PULL TOILET & REINSTALL DEMO & PREP NOTE 1 SKIM COAT ROOM DEMO & PREP NOTE D1D1 D2D2 D3D3 D1D1 D2D2 D3D3 LAUNDRY 1 DEMO FLOORS, WALLPAPER BORDER, TRIM & DOORS IN THIS ROOM DEMO & PREP NOTE 1 LEAVE SHELVING DEMO & PREP NOTE 1 REMOVE LIGHT FIXTURE ELECTRICAL NOTE D1D1 D2D2 E3E3 D1D1 D2D2 E3E3 GARAGE 1 KEEP DOOR DEMO & PREP NOTE 1 MOVE ATTIC ACCESS, NEW LADDER DEMO & PREP NOTE D1D1 D2D2 D1D1 D2D2 DINING 1 REMOVE EXISTING CHAIR RAIL DEMO & PREP NOTE 1 REMOVE EXISTING LIGHT FIXTURE DEMO & PREP NOTE 1 SKIM COAT ROOM DEMO & PREP NOTE 1 REMOVE SWITCH DEMO & PREP NOTE 1 REMOVE CEILING FAN & CAP ELECTRICAL NOTE D1D1 D2D2 D3D3 D4D4 E5E5 D1D1 D2D2 D3D3 D4D4 E5E5 ENTRY 1 DEMO STAIRS & BANISTER (REPLACE WITH HARDWOOD TREADS & RISERS) DEMO & PREP NOTE 1 LEAVE EXISTING CASING ON FRONT DOOR DEMO & PREP NOTE 1 REMOVE WALL UNDER COUNTERTOP (KEEP COUNTER MATERIAL) DEMO & PREP NOTE 1 SKIM COAT ROOM DEMO & PREP NOTE 1 TERMITE DAMAGE IN BASEMENT DEMO & PREP NOTE D1D1 D2D2 D3D3 D4D4 D5D5 D1D1 D2D2 D3D3 D4D4 D5D5 PANTRY 1 LEAVE SHELVING DEMO & PREP NOTED1D1D1D1 OFFICE 1 DO NOT NEED TO PAINT CEILING IN THIS ROOM DEMO & PREP NOTED1D1D1D1 HALL 1 REMOVE LIGHT FIXTURE ELECTRICAL NOTEE1E1E1E1 EXISTING/DEMO PLAN NOTES - FIRST FLOOR SCALE: 3/8" = 1'ACREY RESIDENCEInterior Remodel13132 Brookshire PkwyCarmel, IN 46033Date:Revision: 1 SHEET OF 16 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/10/2020 DATE: GENERAL SITE PREP & DEMO NOTES Install plastic to seal off areas being remodeled from rest of home as necessary. Install floor covering for construction path from door designated as the construction entrance to locations of remodeling as necessary. Install additional floor covering or wall protection as needed over areas close to the areas of construction activity. Install dust control measures on HVAC cold air returns located within the locations of remodeling. Custom Living can provide a HEPA Air Scrubber to aid in airborne dust control from the start of demolition up to priming of new drywall depending on site conditions. Homeowner understands that this will help to reduce airborne dust; however, it will not mitigate it in its entirety. Demolition Contractor(s) are responsible for all labor, for the scope of work specified in the drawings provided by Custom Living. Homeowner understands that Custom Living has only provided a labor and material allowance for the scope of demolition denoted on the drawings. Any additional scope added or uncovered during demolition result in filing a Change Order during construction. Homeowners understand that demolition work will generate dust and noise throughout the house. Custom Living will provide site protection measures to reduce where possible, but Homeowners should not expect 100% containment. [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.244108/21/20 David Rutti