Loading...
HomeMy WebLinkAboutS100.0EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING LIVING ROOM INSTALL NEW EXTERIOR LIGHTING INSTALL TRANSOM WINDOWS FROM EXISTING BAY (FADLEY) INSTALL NEW BUILT-IN INSTALL NEW MANTEL INSULATE EXTERIOR WALL AND 4' SPAN OF CEILING P1P1 P2P2 P3P3 P4P4 P5P5 P1P1 P2P2 P3P3 P4P4 P5P5 KITCHEN FRAME NEW STAIRS (TREX PRODUCT) INSTALL ALL NEW LVT FLOORING INSTALL ALL NEW TRIM & CASING PAINT ALL FIRST LEVEL FRAMED CASING INSTALL NEW EXTERIOR LIGHTING P1P1 P2P2 P3P3 P4P4 P5P5 P6P6 P1P1 P2P2 P3P3 P4P4 P5P5 P6P6 BATHROOM PAINT, REPLACE TRIM & FLOORING IN THIS ROOMP1P1P1P1 LAUNDRY HOMEOWNER TO CONFIRM DOOR CASING OR SWINGP1P1P1P1 GARAGE RIDGE BEAM NEEDS CORRECTED IN ATTIC SISTER ON 2X10'S FOR MASTER CLOSET WEIGHT RELOCATE ATTIC ACCESS (VERIFY LOCATION ON SITE) P1P1 P2P2 P3P3 P1P1 P2P2 P3P3 DINING (NEW OFFICE) PAINT, REPLACE TRIM & FLOORING IN THIS ROOM CASING WITH CAPITOL P1P1 P2P2 P1P1 P2P2 ENTRY INSTALL CORBELS TO SUPPORT COUNTERTOP INSTALL NEW STAIRS & BALUSTERS REPAIR CEILING DRYWALL FROM DAMAGE FIX TERMITE DAMAGE IN BASEMENT UNDER FRONT DOOR P1P1 P2P2 P3P3 P4P4 P1P1 P2P2 P3P3 P4P4 OFFICE PAINT, REPLACE TRIM & FLOORING IN THIS ROOM CASING WITH CAPITOL P1P1 P2P2 P1P1 P2P2 GENERAL NOTES: ALL FLOORING TO BE REPLACED ON THE FIRST LEVEL ACREY RESIDENCEInterior Remodel13132 Brookshire PkwyCarmel, IN 46033Date:Revision: 5 SHEET OF 16 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. PROPOSED FLOOR PLAN NOTES- FIRST FLOOR SCALE: 1/2" = 1'CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/10/2020 DATE: GENERAL PROPOSED PLAN NOTES Framing contractors are responsible for all labor, for the scope of work specified on the drawings provided by Custom Living. Owner understands that Custom Living has only provided a labor and material allowance for the scope of Rough Carpentry work specified on the drawings. Any additional work added or uncovered during this scope will be filed as a Change Orde r during construction Owner understands that the drywall allowance is based on an estimated board count and square footage take-off. A final walk through with a drywall contractor after framing and mechanical rough-ins will be necessary to finalize drywall installation and finish budgets. Final drywall touch-ups will follow countertop installation. [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.244108/21/20 David Rutti