DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
LIVING ROOM
INSTALL NEW EXTERIOR LIGHTING
INSTALL TRANSOM WINDOWS FROM EXISTING BAY (FADLEY)
INSTALL NEW BUILT-IN
INSTALL NEW MANTEL
INSULATE EXTERIOR WALL AND 4' SPAN OF CEILING
P1P1
P2P2
P3P3
P4P4
P5P5
P1P1
P2P2
P3P3
P4P4
P5P5
KITCHEN
FRAME NEW STAIRS (TREX PRODUCT)
INSTALL ALL NEW LVT FLOORING
INSTALL ALL NEW TRIM & CASING
PAINT ALL FIRST LEVEL
FRAMED CASING
INSTALL NEW EXTERIOR LIGHTING
P1P1
P2P2
P3P3
P4P4
P5P5
P6P6
P1P1
P2P2
P3P3
P4P4
P5P5
P6P6
BATHROOM
PAINT, REPLACE TRIM & FLOORING IN THIS ROOMP1P1P1P1
LAUNDRY
HOMEOWNER TO CONFIRM DOOR CASING OR SWINGP1P1P1P1
GARAGE
RIDGE BEAM NEEDS CORRECTED IN ATTIC
SISTER ON 2X10'S FOR MASTER CLOSET WEIGHT
RELOCATE ATTIC ACCESS (VERIFY LOCATION ON SITE)
P1P1
P2P2
P3P3
P1P1
P2P2
P3P3
DINING (NEW OFFICE)
PAINT, REPLACE TRIM & FLOORING IN THIS ROOM
CASING WITH CAPITOL
P1P1
P2P2
P1P1
P2P2
ENTRY
INSTALL CORBELS TO SUPPORT COUNTERTOP
INSTALL NEW STAIRS & BALUSTERS
REPAIR CEILING DRYWALL FROM DAMAGE
FIX TERMITE DAMAGE IN BASEMENT UNDER FRONT DOOR
P1P1
P2P2
P3P3
P4P4
P1P1
P2P2
P3P3
P4P4
OFFICE
PAINT, REPLACE TRIM & FLOORING IN THIS ROOM
CASING WITH CAPITOL
P1P1
P2P2
P1P1
P2P2
GENERAL NOTES:
ALL FLOORING TO BE REPLACED ON THE FIRST LEVEL ACREY RESIDENCEInterior Remodel13132 Brookshire PkwyCarmel, IN 46033Date:Revision:
5
SHEET OF 16
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concepts, and ideas
forming a part of the plans and the selection and arrangement
thereof are Copyright 2018 of Custom Living, Inc., Indianapolis,
IN. ALL RIGHTS RESERVED. The plans shall remain the
property of Custom Living Inc. Any use of the plans or their
content without the prior written permission of Custom Living Inc.
is strictly prohibited.
PROPOSED FLOOR PLAN NOTES- FIRST FLOOR
SCALE: 1/2" = 1'CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/10/2020
DATE:
GENERAL PROPOSED PLAN NOTES
Framing contractors are responsible for all labor, for
the scope of work specified on the drawings provided
by Custom Living.
Owner understands that Custom Living has only
provided a labor and material allowance for the scope
of Rough Carpentry work specified on the drawings.
Any additional work added or uncovered during this
scope will be filed as a Change Orde r during
construction
Owner understands that the drywall allowance is
based on an estimated board count and square
footage take-off. A final walk through with a drywall
contractor after framing and mechanical rough-ins will
be necessary to finalize drywall installation and finish
budgets.
Final drywall touch-ups will follow countertop
installation.
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.244108/21/20