Loading...
HomeMy WebLinkAboutS200.0MASTER BEDROOM INSTALL NEW LVT FLOORING DRYWALL CLOSET OPENING INSTALL BLOCKING STAINED TO MATCH BEAM FOR FAN FRAMED CASING P1P1 P2P2 P3P3 P4P4 P1P1 P2P2 P3P3 P4P4 MASTER CLOSET INSTALL NEW LVT FLOORING INSTALL CASED OPENING TO CLOSET P1P1 P2P2 P1P1 P2P2 MASTER BATHROOM REPLACE POCKET DOOR & CASING EXISTING TILE TO STAY FRAMED CASING P1P1 P2P2 P3P3 P1P1 P2P2 P3P3 FULL BATH EXISTING TILE TO STAY NEW DOORS, WINDOW TRIM, & DOOR TRIM IN THIS ROOM (KEEP FLOORING) PROTECT EXISTING CABINETS FRAMED CASING P1P1 P2P2 P3P3 P4P4 P1P1 P2P2 P3P3 P4P4 BEDROOM #3 INSTALL NEW BYPASS SLIDING DOOR, HINGE DOOR & TRIM FRAMED CASING P1P1 P2P2 P1P1 P2P2 BEDROOM #2 INSTALL NEW BYPASS SLIDING DOOR, HINGE DOOR & TRIM FRAMED CASING P1P1 P2P2 P1P1 P2P2 BEDROOM #1 INSTALL NEW BYPASS SLIDING DOOR, HINGE DOOR & TRIM FRAMED CASING P1P1 P2P2 P1P1 P2P2 HALLWAY & STAIRS INSTALL ALL NEW LVT FLOORING INSTALL ALL NEW TRIM AND CASING INSTALL NEW STAIR TREADS P1P1 P2P2 P3P3 P1P1 P2P2 P3P3 ACREY RESIDENCEInterior Remodel13132 Brookshire PkwyCarmel, IN 46033Date:Revision: 7 SHEET OF 16 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/10/2020 DATE: [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.2441PROPOSED FLOOR PLAN NOTES - SECOND FLOOR SCALE: 1/2" = 1' GENERAL PROPOSED PLAN NOTES Framing contractors are responsible for all labor, for the scope of work specified on the drawings provided by Custom Living. Owner understands that Custom Living has only provided a labor and material allowance for the scope of Rough Carpentry work specified on the drawings. Any additional work added or uncovered during this scope will be filed as a Change Orde r during construction Owner understands that the drywall allowance is based on an estimated board count and square footage take-off. A final walk through with a drywall contractor after framing and mechanical rough-ins will be necessary to finalize drywall installation and finish budgets. Final drywall touch-ups will follow countertop installation. 08/21/20 David Rutti