HomeMy WebLinkAboutS200.0MASTER BEDROOM
INSTALL NEW LVT FLOORING
DRYWALL CLOSET OPENING
INSTALL BLOCKING STAINED TO MATCH BEAM FOR FAN
FRAMED CASING
P1P1
P2P2
P3P3
P4P4
P1P1
P2P2
P3P3
P4P4
MASTER CLOSET
INSTALL NEW LVT FLOORING
INSTALL CASED OPENING TO CLOSET
P1P1
P2P2
P1P1
P2P2
MASTER BATHROOM
REPLACE POCKET DOOR & CASING
EXISTING TILE TO STAY
FRAMED CASING
P1P1
P2P2
P3P3
P1P1
P2P2
P3P3
FULL BATH
EXISTING TILE TO STAY
NEW DOORS, WINDOW TRIM, & DOOR TRIM IN THIS ROOM (KEEP FLOORING)
PROTECT EXISTING CABINETS
FRAMED CASING
P1P1
P2P2
P3P3
P4P4
P1P1
P2P2
P3P3
P4P4
BEDROOM #3
INSTALL NEW BYPASS SLIDING DOOR, HINGE DOOR & TRIM
FRAMED CASING
P1P1
P2P2
P1P1
P2P2
BEDROOM #2
INSTALL NEW BYPASS SLIDING DOOR, HINGE DOOR & TRIM
FRAMED CASING
P1P1
P2P2
P1P1
P2P2
BEDROOM #1
INSTALL NEW BYPASS SLIDING DOOR, HINGE DOOR & TRIM
FRAMED CASING
P1P1
P2P2
P1P1
P2P2
HALLWAY & STAIRS
INSTALL ALL NEW LVT FLOORING
INSTALL ALL NEW TRIM AND CASING
INSTALL NEW STAIR TREADS
P1P1
P2P2
P3P3
P1P1
P2P2
P3P3 ACREY RESIDENCEInterior Remodel13132 Brookshire PkwyCarmel, IN 46033Date:Revision:
7
SHEET OF 16
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concepts, and ideas
forming a part of the plans and the selection and arrangement
thereof are Copyright 2018 of Custom Living, Inc., Indianapolis,
IN. ALL RIGHTS RESERVED. The plans shall remain the
property of Custom Living Inc. Any use of the plans or their
content without the prior written permission of Custom Living Inc.
is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/10/2020
DATE:
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.2441PROPOSED FLOOR PLAN NOTES - SECOND FLOOR
SCALE: 1/2" = 1'
GENERAL PROPOSED PLAN NOTES
Framing contractors are responsible for all labor, for
the scope of work specified on the drawings provided
by Custom Living.
Owner understands that Custom Living has only
provided a labor and material allowance for the scope
of Rough Carpentry work specified on the drawings.
Any additional work added or uncovered during this
scope will be filed as a Change Orde r during
construction
Owner understands that the drywall allowance is
based on an estimated board count and square
footage take-off. A final walk through with a drywall
contractor after framing and mechanical rough-ins will
be necessary to finalize drywall installation and finish
budgets.
Final drywall touch-ups will follow countertop
installation.
08/21/20
David Rutti