SWIMMING POOL INSPECTION PROCEDURES
All construction must follow Federal, State, and Local codes. With the adoption of Indiana Amendments, these become
Indiana codes.
♦ All pool construction requires at least two inspections (Bonding & Grounding and Final).
♦ Large, commercial/institutional, or specially constructed pools, and pools with steel rebar reinforcement may require
additional inspections.
♦ The pool permit placard must be accessible to the inspector and posted in a conspicuous location in a clear plastic
bag.
♦ For all inspections please contact the office at (317) 571-2444 at least one day prior to the requested inspection date.
♦ Any residential pool inspection will fail if the correct erosion and storm water pollution prevention controls are not in
place prior to inspection.
♦ Pool builders are responsible for notifying the pool owners that these inspections are required. Builders shall also
coordinate with owners for the inspector’s access to the site on days inspections are scheduled.
♦ If there is a gate code or lockbox code required to gain access, it must be provided to the scheduler at time of
scheduling every inspection.
INSPECTIONS
BONDING & GROUNDING:
1. The pool shell must be installed.
2. All piping for plumbing, all electrical conduits and wiring must be installed in the conduits, and all receptacles
and junction boxes must be installed and open for inspection.
3. A major aspect of the required bonding inspection is the installation of the equal potential bonding grid, as
called for in the National Electrical Code; Section 680-26.
4. Do not backfill any underground plumbing or electrical until inspected and approved.
5. All electrical equipment covers must be removed. Do not energize any equipment until inspected and approved.
B-2020-00413
Ex. 12345678 or B-2020-12345
2020
Residential
Commercial
Pool / Spa
Revision
POOL / SPA
1st Bonding / Grounding
2nd Bonding / Grounding
FINAL - Bldg
FINAL - Forestry
FINAL - Carmel Fire Dept.
6. Pools with concrete reinforcement (rebar) may require a second bonding and grounding inspection prior to the
final inspection
FINAL: (Once the project is complete and all grading is done)
1. If a pool cover is used, the cover key must be contained within a plastic bag with the placard or pass code for
keypad must be given at time of scheduling inspection. The owner should not be given the key or cover code
prior to completion of an approved final inspection.
2. Required safety equipment must be on site and visible.
3. At this time the pool cover motor will be checked to insure that it is bonded and on a GFCI protected circuit.
4. Pools that do not have a cover must have a fence and/or gate for protection. They must be self closing / self
latching gates which are capable of being locked. Fences must be a minimum of five (5) feet in height. If
installing a fence, a separate permit will be required. Please contact the Building & Code Services office at
571-2444 or email LBrown@carmel.in.gov for details.
5. Any pool used or personal property on the deck will constitute an assessment of occupied prior to final
approval, and a Late Fee may be assessed.
Commercial / Institutional pools may require the following additional inspections:
♦ Carme l Fire De partme nt. Please contact (317) 571-2600 to schedule. The CFD final must occur prior to the Final by
our office.
♦ Carme l Urban Fore stry. Please contact Daren Mindham at (317) 571-2283 to schedule.
♦ Carme l Alte rnativ e Transportation (Bike Parking). Please contact David Littlejohn at (317) 571-2306 to schedule.
NOTICE
Under the Carmel Unified Development Ordinance Section 1.29 “Permit Late Fees”, a late fee may be assessed for
proceeding without the required Bonding & Grounding inspection(s) and/or for “occupying” prior to the Final inspection
and approval.
Plan Re v ie we r
Date
Mike Sheeks
8/24/2020