HomeMy WebLinkAboutA901 SpecsSECTION 014200-REFERENCES
PART1-GENERAL
1.1RELATEDDOCUMENTS
A. DRAWMGSAND GENERAL PROVISIONS OFTHE CONTRACT, MCLUDING GENERAL AND
SUPPLEMENTARV CONDITIONS AND OTHER DNISION 01 SPECIFICATION SECTIONS, APPLV TO THIS
SECTION.
12 DEFlNITIONS
A. GENER4L BASIC CONTRACT OEFINITIONS ARE INCW DED W THE CONDITIONS OF THE CONTRACT.
B. "APPROVED": W HEN USED TO CONVEV ARCHRECT'S ACTION ON CONTRACTOR'S SUBMITTAL$
APPLICATIONS, AND REQUESTS, "APPROVED" IS LIMITED TO ARCHITECT'S DUTIES AND
RESPONSIBILITIES AS STATE� IN THE CON�ITIONS OF THE CONTRACT.
C. "DIRECTED": A COMMAND OR INSTRUCTION BV ARCHITECT. OTHER TERMS INCLUD W G"REQUESTED,"
"AUTHORIZED,"'BELECTE�;"RWUIRED," AND'PERMITTED" HAVE THE SAME MEANING AS
"DIRECTED"
D. "INDICATED": REQUIREMENTS EXPRESSED BV GRAPHIC REPRESENTATIONS OR IN WRITTEN FORM
ON �RAW INGS, IN SPEQFICATIONS, AND IN OTHER CONTRACT DOCUMENTS. OTHER TERMS
INCW DING "SHOWN," "NOTED," "SCHEDULED," AN� "SPECIFIED" HAVE THE SAME MEANING AS
"INDICATED"
E'REGULATIONS"'. LAW 5, OR�INANCES, STATUTES, AND LAW FUL ORDERS ISSUED BV AUTHORITIES
HAVING JURISDICTION, AND RULE$ CONVENTIONS, AND AGREEMENTS W ITH W THE
CONSTRUCTION INOUSTRV THAT CONTROL PERFORMANCE OF THE WORK.
F"FURNISH"'. SUPPLV AND �ELNER TO PROJECT SITE, READV FOR UNLOADING, UNPACKING,
ASSEMBLV. INSTALLATION, AND SIMILAR OPERATIONS.
G. "INSTALL": UNLOAD, TEMPORARILY STORE, UNPACK, ASSEMBLE, ERECT, PLACE, ANCHOR, APPLV,
WORK TO DIMENSION, FlNISH, CURE, PROTECT, CLEAN, AND SIMILAR OPERATIONS AT PROJECT
SITE
H. "PROVIDE" FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE.
I. "PROJECT SITP': SPACE AVAILABLE FOR PERFORMING CONSTRUCTION ACTIVITIES. THE EXTENT OF
PROJECT SITE IS SHOWN ON DRQW INGS AN� MAV OR MAV NOT BE IDENTICAL W ITH THE
DESCRIPTION OF THE LAND ON W HICH PROJECT IS TO BE BUILT.
131NDUSTRVSTAN�ARDS
A. APPLICABILITV OF STANOAROS: UNLESS THE CONTRACT DOCUMENTS INCWOE MORE STRINGENT
REQUIREMENTS, APPLICABLE CONSTRUCTION INDUSTRV STANDARDS HAVE THE SAME FORCE AND
EFFECT AS IF BOUND OR COPIED DIRECTLV INTO THE CONTRACT DOCUMENTS TO THE EXTENT
REFERENCE�. SUCH STAN�ARDS ARE MADE A PART OF THE CONTRACT DOCUMENTS BV
REFERENCE.
B. PUBLICATION DATES: COMPLV W ITH STANDARDS M EFFECT AS OF DATE OF THE CONTRACT
�OCUMENTS UNLESS OTHERWISE INDICATED.
G COPIES OF STANDARDS: EACH ENTITV ENGAGED W CONSTRUCTION ON PROJECT SHOULD BE
FAMILIAR W ITH INDUSTRY STANDARDS APPLICABLE TO ITS CONSTRUCTION ACTNITY. COPIES OF
APPLICABLE STANDARDS ARE NOT BOUND W ITH THE CONTRACT DOCUMENTS.
1. WHERE COPIES OF STANDARDS ARE NEEDE� TO PERFORM A REQUIRED CONSTRUCTION
ACTIVITV. OBTAIN COPIES DIRECTLV FROM PUBLICATION SOURCE.
1 4 ABBREVIATIONS AND ACRONVMS
A. M�USTRV ORGANIZATIONS: WHERE ABeREVIATIONS ANo ACRONVMS ARE USED M SPECIFICATIONS
OR OTHER CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNRED NAME OFTHE ENTITIES
INDICATE� IN GALE'S "ENCVCLOPEDIA OF ASSOQATIONS NATIONAL ORGANIZATIONS OF THE LLS"
OR W COLUMBIA BOOKS"'NATIONAL TRADE & PROFESSIONAL ASSOCIATIONS OF THE UNITED
STATES"
B. INDUSTRV ORGANIZATIONS: WHERE ABBREVIATIONS AND ACRONVMS ARE USED M SPECIFICATIONS
OR OTHER CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNIZED NAME OF THE ENTITIES
IN THE FOLLOW WG LIST. THIS MFORMATION IS SUBJECT TO CHANGE AND IS BELIEVED TO BE
ACCURATE AS OF THE DATE OF THE CONTRACT �OCUMENTS.
1. AABC - ASSOqATED AIR BALANCE COUNCIL; W W W.AABGCOM.
2. AAMA - AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION', W W W.AAMANET.ORG.
3. ACI - AMERICAN CONCRETE INSTITUTE', (FORMERLV: ACI INTERNATIONAL);
W W W.CONCRETE.ORG.
4. AEIC - ASSOCIATION OF EDISON IL W MINATING COMPAMES, W G(THE); W W W AEIC.ORG.
5. AIA - AMERICAN INSTITUTE OF ARCHITECTS (THE); W W W AIA ORG.
6. AISC - AMERICAN INSTITUTE OF STEEL CONSTRUCTION; WWW AISQORG.
1. AITC - AMERICAN INSTITUTE OF TIMBER CONSTRUCTION; W W W.AITGGLULAM.ORG.
8. ANSI -AMERICAN NATIONAL STANDARDS INSTITUTE; W W W ANSI.ORG.
9. APA - ARCHITECTUR4L PRECAST ASSOCIATION; W W W.ARCHPRECAST.ORG.
10. ARI - AIR-CONDITIONING 8 REFRIGERATION INSTITUTE; (SEE AHRI).
11. ARI - AMERICAN REFRIGERATION INSTITUTE; (SEE AHRI).
12. ARMA - ASPHALT ROOFING MANUFACTURERS ASSOCIATION; W W W ASPHALTROOFING.ORG.
13. ASCE/SEI - AMERICAN SOQETV OF CNLL ENGMEERSISTRUCTURAL ENG W EERING INSTITUTE;
(SEE ASGE).
14. ASHRAE - AMERICAN SOCIETV OF HEATING, REFRIGERATWG AND AIR-CONDITIONING
ENGMEERS', W W W ASHRAEORG.
15. ASSE - AMERICAN SOCIETV OF SANITARY ENGINEERING; W W W ASSE-P W MBING.ORG.
i6. ASTM - ASTM INTERNATIONAL; (AMERICAN SOCIETV FOR TESTING AND MATERIALS
INTERNATIONAL�; W W W ASTM.ORG.
1]. AWEA - AMERICAN WIND ENERGV ASSOCIATION; W W W AWEA.ORG.
18. AW I- ARCHITECTURAL W OODWORK INSTITUTE; W W W AW WET.ORG.
19. AWMAC -ARCHITECTURAL WOODWORK MANUFACTURERS ASSOCIATION OF CANADA;
WWW.AWMACLOM.
20. AWPA - AMERICAN W00� PROTECTION ASSOqATION; (FORMERLV: AMERICAN WOOD-
PRESERVERS' ASSOQATION ); W W W.AW PA.COM.
21. AW 5- AMERICAN W ELDING SOCIETV; W W W.AW S.ORG.
22. BHMA - BUILDERS HARDW ARE MANUFACTURERS ASSOCIATION;
W W W.BUILDERSHARDWARECOM.
23. BIA-BRICK INDUSTRV ASSOCIATION (THE); WWW.GOBRICKLOM.
24. CISCA - CEILINGS & INTERIOR SVSTEMS CONSTRUCTION ASSOCIATION�, W W W.CISCA.ORG.
25. CRI - CARPET AND RUG INSTITUTE (THE); W W W.CARPET-RUG.ORG.
26. CRRC - COOL ROOF RATING COUNCIL�, W W W COOLR W FSDRG.
27. CRSI - CONCRETE REM FORCING STEEL INSTITUTE�, W W W.CRSI.ORG.
28. CSA - CANA�IAN STANDARDS ASSOCIATION; W W W.CSA.CA.
29. CSI-CONSTRUCTION SPECIRCATIONS INSTITUTE (THE); WWW.CSINET.ORG.
30. CSSB - CEDAR SHAKE & SHINGLE BUREAU; W W W.CEDARBUREAU.ORG.
31. DASMA - DOOR AND ACCESS SVSTEMS MANUFACTURERS ASSOCIATION; W W W.DASMA.COM.
32 OHI - �OOR AND HARDWARE W STITUTE' W W W.DHI.ORG.
33. ECA-ELECTRONIC COMPONENTS ASSOCIATION; (SEE ECIA).
34. ECAMA - ELECTRONIC COMPONENTS ASSEMBLIES 8 MATERIALS ASSOQATION; (SEE ECIA).
35. EIMA - EIFS INDUSTRV MEMBERS ASSOQATION; W W W.EIMA.COM.
36. EJMA - EXPANSION JOINT MANUFACTURERS ASSOCIATION, INC.�, W W W.EJMA.ORG.
3�. ESD - ESD ASSOCIATION; (ELECTROSTATIC �ISCHARGE ASSOqATION); W W W.ESDA.ORG.
38. FSA - FLUID SEALING ASSOCIATION �, W W W FW IDSEALING COM.
39. FSC - FOREST STEW ARDSHIP COUNCIL U.S.; W W W.FSCUS.ORG.
40. GA - GVPSUM ASSOCIATION; W W W.GVPSUM.ORG.
41. GANA - GLASS ASSOCIATION OF NORTH AMERICA; W W W.GLASSW EBSITE.COM.
42. GS - GREEN SEAL�, W W W.GREENSEAL.ORG.
43. HMMA- HOLLOW METAL MANUFACTURERS ASSOCIATION', (SEE NAAMM).
44. HPVA- HARDWOOD PLVWOOD & VENEER ASSOCIATION; W W W HPVA.ORG.
45. ICBO - INTERNATIONAL CONFERENCE OF BUILDMG OFFICIALS (SEE ICC).
46. ICC - INTERNATIONAL CODE COUNGL; W W W JCCSAFEORG.
6]. IES - ILLUMINATING ENGMEERING SOCIETY; (FORMERLV: ILW MINATING ENGINEERING SOCIETV
OF NORTH AMERICA); W W W.IES-ORG.
48. IESNA - IL W MINATING ENG W EERING SOGETV OF NORTH AMERICA; (SEE IES).
49. IGMA - MSl1LATING GLA55 MANUFACTURERS ALLIANCE', W W W.IGMAONLINE.ORG.
50. IGSHPA- INTERNATIONAL GROUND SOURCE HEAT PUMP ASSOCIATION;
W W W.IGSHPA.OKSTATE.EDU.
SL LMA- LAMINATING MATERIALS ASSOCIATION; (SEE CPA).
52. LPI - LIGHTNING PROTECTION INSTITUTE; W W W.LIGHTNING.ORG.
53. MFMA- MAPLE FLOORING MANUFACTURERS ASSOCIATION, MG; W W W.MAPLEFLOOR.ORG.
54. MFMA - METAL FR4MING MANUFACTURERS ASSOCIATION, INC.; W W W NETALFRAMINGMFG.ORG.
55. MHIA - MATERIAL HANDLMG INDUSTRV OF AMERICA; W W W.MHIA.ORG.
56. MIA - MARBLE INSTITUTE OF AMERICA; W W W.MARBLEINSTITUTECOM.
5]. MMPA - MOULDING 8 MILLWORK PROOUCERS ASSOCIATION; (FORMERLY: W OOD MOUL�ING 8
MILLWORK PROOUCERS ASSOCIATION); W W W.WMMPA.COM.
58. MPI - MASTER PAINTERS INSTITUTE; W W W.PAINTMFQCOM.
59. MSS - MANUFACTURERS STANDARDIZATION SOCIETV OF THE VALVE AND FITTINGS INDUSTRY
INQ; W W W.MSS-HQ.ORG.
60. NAAMM - NATIONAL ASSOqATION OF ARCHITECTURAL METAL MANUFACTURERS;
W W W.NAAMM.ORG.
61. NACE-NACE INTERNATIONAL (NATIONALASSOCIATION OF CORROSION ENGINEERS
INTERNATIONAL�', WWW.NAC60RG.
62 NAIMA - NORTH AMERICAN INSIILATION MANUFACTURERS ASSOCIATION; W W W.NAIMA ORG.
63. NBG�A - NATIONAL BUILDING GRANITE QUARRIES ASSOCIATION, INC.; W W W.NBGQA.COM.
64. NCMA- NATIONAL CONCRETE MASONRV ASSOCIATION; W W W.NCMA.ORG.
65. NEBB - NATIONAL ENVIRONMENTAL BALANCING BUREAU; W W W NEBB.ORG.
66. NECA - NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION; W W W NECANET.ORG.
6�. NELMA - NORTHEASTERN LUMBER MANUFACTURERS ASSOCIATION; W W WNELMA.ORG.
68. NEMA - NATIONAL ELECTRICAL MANUFACTURERS ASSOQATION; W W W.NEMA.ORG.
69. NFPA - NFPA; (NATIONAL FIRE PROTECTION ASSOCIATION)�, W W W.NFPA.ORG.
]0. NFPA - NFPA INTERNATIONAL; (SEE NFPA).
]i. NFRC-NATIONAL FENESTRATION RATING COUNCIL; WWW NFRC ORG.
72. NHLA - NATIONAL HARDWOOD LUMBER ASSOCIATION; W W W.NHLA.COM.
]3. NLGA - NATIONAL LUMBER GRADES AUTHORITV; W W W.NLGA.ORG.
]4. NOFMA - NATIONAL OAK FLOORING MANUFACTURERS ASSOCIATION; (SEE NWFA).
75. NOMMA - NATIONAL ORNAMENTAL & MISCELLANEOUS METALS ASSOCIATION;
W W W.NOMMA.ORG.
]6. NRCA - NATIONAL ROOFING CONTR4CTORS ASSOCIATION; W W W.NRCA.NET.
77. NTMA- NATIONAL TERRAZZO & MOSAIC ASSOCIATION, ING (THE)�, W W W.NTMA.COM.
18. N W FA - NATIONAL WOO� ROORING ASSOCIATION; W W W.N W FA.ORG.
]9. PCI - PRECAST/PRESTRESSED CONCRETE INSTITUTE; W W W.PCI ORG.
80. PDI - PLUMBING & DRAINAGE INSTITUTE: W W W.PDIONLINE.ORG.
81. RFq - RESILIEM FLOOR COVERING INSTITUTE; W W W RFCLCOM.
82 SAE - SAE INTERNATIONAL; (SOCIETV OF AUTOMOTIVE ENGINEERS); W W W.SAE.ORG.
83. SCTE - SOCIETV OF CABLE TELECOMMUNICATIONS ENGINEERS; W W W.SCTE.ORG.
84. SDI - STEEL DECK INSTITUTE; W W W.SDI.ORG.
85. SDI - STEEL DOOR INSTITUTE; W W W STEELDOOR.ORG.
86. SEFA - SQENTIFIC EQUIPMENT AND FURNITURE ASSOCIATION; W W W.SEFALABS.COM.
8�. SEIIASCE-STRUCTURAL ENGMEERING INSTITUTE/AMERICAN SOQETV OF CIVLL ENGMEERS;
(SEE ASCE).
88. SIA - SEW RITV INDUSTRV ASSOCIATION; W W W.SIAONLME.ORG.
89. SJ I- STEEL JOIST INSTITUTE; W W W.STEELJOIST.ORG.
90. SMA - SCREEN MANUFACTURERS ASSOCIATION; W W W.SMAINFO.ORG.
91. SMACNA - SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION;
W W W.SMACNA.ORG.
92 SPIB - SOUTHERN PINE INSPECTION BUREAU; W W W.SPIB.ORG.
93. SPRI - SINGLE PLV ROOFING INDUSTRV; W W W.SPRI.ORG.
94. SSINA- SPEQALTV STEEL IN�USTRV OF NORTH AMERICA; W W W.SSINA.COM.
95. SSPC - SSPC: THE SOCIETV FOR PROTECTIVE COATINGS; W W W.SSPGORG.
96. S W I- STEEL W INDOW INSTITUTE; W W W.STEELW INDOW S.COM.
9�. TCNA - TILE COUNCIL OF NORTH AMERICA, INC.; (FORMERLY: TILE COUNCIL OF AMERICA)�,
W W W.TILEUSA.COM.
98. TMS - THE MASONRV SOCIETV; W W W.MASONRVSOCIETV.ORG.
99. TRI-TILE ROOFlNG INSTITUTE; (FORMERLV: NATIONALTILE ROOFlNG MANUFACTURWG
ASSOCIATION); W W W TILEROOFING ORG.
100. UL-UNDERWRITERS LABORATORIES INC.; W WW.ULCOM.
107. USGBC-U.S. GREEN BUILDING COUNQL; WW W.USGBC.ORG.
102 WCLIB- WESTCOAST WMBER INSPECTION BUREAl1; WW W.WCLIB ORG.
103. WCMA- WINDOW COVERING MANUFACTURERS ASSOCIATION; W W W.WCMANET.ORG.
104. WDMA- WINDOW 8 DOOR MANUFACTURERS ASSOQATION', W W W.W DMA.COM.
105. WI- WOODWORK INSTITUTE; (FORMERLV: WIC- WOODWORK INSTITUTE OF CALIFORNIA)',
W W W. W ICNET.ORG.
RELEASEOFORCON$TRUCTION oFinwi°corPiRRcoRsnssocinnoN:'wwwwsRcaconn
CTSASSOCIATION; WWW.WWPA.ORG.
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel ` �
�un��V l�rcNal�=L.
�
DATE: OH�Z5 2O
G CODE AGENCIES�. wHERE ABBREVIATIONS AND ACRONVMS ARE USED IN SPECIFICATIONS OR OTHER
CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNIZED NAME OF THE ENTITIES IN THE
FOLLOW ING LIST. THIS INFORMATION IS BELIEVED TO BE ACCURATE AS OF THE �ATE OF THE
CONTRACTOOCUMENTS.
1. IAPMO - INTERNATIONAL ASSOQATION OF PLUMBING AND MECHANICAL OFFICIALS'
WWW.IAPMODRG.
2. ICC - INTERNATIONAL CODE COUNCIL; W W W.ICCSAFE.ORG.
3. ICGES - ICC EVALUATION SERVICE, LLC; W W WJCGES.ORG.
D. FEDER4L GOVERNMENT AGENCIES: W HERE ABBREVIATIONS AND ACRONYMS ARE USED IN
SPEQRCATIONS OR OTHER CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNIZED NAME
OF THE ENTITIES M THE FOLLOWING LIST. INFORMATION IS SUBJECT TO CHANGE AND IS UP-TO-
DATE AS OF THE DATE OF THE CONTRACT DOCUMENTS.
1. DOE - DEPARTMENT OF ENERGV; W W W.ENERGV.GOV.
2 EPA - ENVIRONMENTAL PROTECTION AGENCV; W W W EPA.GOV.
3. FG - FEDERAL GOVERNMENT PUBLICATIONS; W W W.GPO.GOV.
4. GSA - GENERAL SERV ICES ADMINISTRATION; W W W.GSA.GOV.
5. OSHA - OCCUPATIONAL SAFETV & HEALTH ADMINISTRATION; W W W.OSHA.GOV.
E. STANDARDS AND REGULATIONS: WHERE ABBREVIATIONS AND ACRONVMS ARE USED IN
SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS. THEV SHALL MEAN THE RECOGNIZED
NAME OF THE STANDARDS AND REGULATIONS IN THE FOLLOWING LIST. THIS INFORMATION IS
SUBJECT TO CHANGE AND IS BELIEVED TO BE ACCURATE AS OF THE DATE OF THE CONTRACT
DOCUMENTS.
1. CFR - CODE OF FEDERAL REGULATIONS; AVAILABLE FROM GOVERNMENT PRINTING OFFICE;
W Ww.GPO.GOv/FOSVS.
2 FED-STD - FE�ERAL STANDARD', (SEE FS).
3. FS - FEOERAL SPECIRCATION; AVAILABLE FROM DEPARTMENT OF �EFENSE SINGLE STOCK
POINT; HTTP�J/OOOSSP.DAPSDLA.MIL.
4. USAB - UNITED STATES ACCE55 BOARD; W W W.ACCE55-BOARD.GOV.
5. 11SATBCB - US. ARCHITECTUR4L 8 TR4NSPORTATION BARRIERS COMPLIANCE BOARD; (SEE
USAB).
F. STATE GOVERNMENT AGENCIES: W HERE ABBREVIATIONS AND ACRONVMS ARE USED IN
SPECIRCATIONS OR OTHER CONTRACT OOCl1MENTS, THEV SHALL MEAN THE RECOGMZED NAME
OF THE ENTITIES IN THE FOLLOW ING LIST. THIS MFORMATION IS SUBJECT TO CHANGE AND IS
BELIEVED TO BE ACCURATE AS OF THE �ATE OF THE CONTRACT DOCUMENTS.
1. CBHF, STATE OF CALIFORNIA', DEPARTMENT OF CONSUMERAFFAIRS; BIIREAU OF ELECTRONIC
APPLIANCE AND REPAIR, HOME FURNISHINGS AND
THERMAL INSULATION'. W W W BEARHFTLCA.GOV.
2 CCR; CALIFORNIA CODE OF REGULATIONS; OFFICE OF ADMINISTRATIVE LAW; CALIFORNIA TITLE
24 ENERGVCODE;WWW.CALREGSCOM.
3. CDHS; CALIPoRNIA DEPARTMENT OF HEALTH SERVICES; (SEE CDPH).
4. CDPH; CALIFORNIA DEPARTMENT OF PUBLIC HEALTH; INDOOR AIR QUALITY PROGRAM;
W W W.CAL-IAQ.ORG.
5. CPUq CALIFORNIA PUBLIC UTILITIES COMMISSION; W W W.CPUGCA.GOV.
6. SCApMO; SOUTH COAST AIR QUALITV MANAGEMENT �ISTRICT; W W W ApMD.GOV.
7. TFS; TExAS FOREST SERVICE; FOREST RESOURCE DEVELOPMENT AND SUSTAINABLE
FORESTRY; HTTP:/lTXFORESTSERVICETAMLLEDU.
PART 2 - PRODlICTS (NOT USED)
PART 3 � EXECIITION (NOT USED)
PART1-GENERAL
1.1 RELATED DOCUMENTS
A. DRAW INGS AN� GENERAL PROVISIONS OF THE CONTRACT, INC W DING GENERAL AND
SUPPLEMENTARY CONDITIONS AND OTHER DIVISION 01 SPEGFICATION SECTIONS, APPLV TO THIS
SECTION.
12SUMMARV
A. SECTION INCLUDES GENERAL A�MINISTRATNE AND PROCEDURAL REQUIREMENTS GOVERNING
EXECUTION OF THE WORK INCWDING, BUT NOT LIMITED TO, THE FOLLOW ING:
1. CONSTRUCTION LAYOUT.
2. FlELD ENGMEERING AND SURVEYING.
3. INSTALLATION OF THE WORK.
4. COORDINATION OF OWNER-INSTALLED PRODUCTS.
5. PROGRESS 0.EANING.
6. STARTING AND A�JUSTING.
]. PROTECTION OF INSTALLED CONSTRUCTION.
B.RELATED REQUIREMENTS:
1. SECTION 011000 "SUMMARV" FOR LIMITS ON USE OF PROJECT SITE.
2 SECTION 013300 "SUBMITTAL PROCEDURES" FOR SUBMRTING SURVEVS.
3. SECTION 01�]00 "CLOSEOUT PROCE�URES" FOR SUBMITTING FINAL PROPERTV SURVEV W ITH
PROJECT RECORD DOCUMENTS, RECORDING OF OW NER ACCEPTED DEVIATIONS FROM
INDICATED LWES AND LEVELS. AND RNAL QEANING.
4. SECTION 024119 "SELECTNE DEMOLITION" FOR DEMOLITION AND REMOVAL OF SELECTED
PORTIONS OF THE BUILDING.
S. SECTION O]8413 "PENETR4TION FIRESTOPPING" FOR PATCHING PENETR4TIONS IN FIRE-RATED
CONSTRUCTION.
PARTI�PRODUGTS
21 MATERIALS
A. GENER4C COMPLY WITH REQUIREMENTS SPEqRED IN OTHER SECTIONS.
L FOR PROJECTS REQUIRING COMPLIANCE W ITH SUSTAINABLE DESIGN AND CONSTRUCTION
PRACTICES AND PROCEDURES, USE PRODUCTS FOR PATCHING THAT COMPLV WITH
REQUIREMENTS IN SECTION 018113.13 "SUSTAINABLE DESIGN REQUIREMENTS-LEED FOR NEW
CONSTRUCTION AND MAJOR RENOVATIONS," SECTION 018113.ifi "SUSTAINABLE DESIGN
REQUIREMENTS - LEED FOR COMMERCIAL INTERIORS," SECTION 018113.19 "SUSTAINABLE
DESIGN REQUIREMENTS - LEED FOR CORE AND SHELL DEVELOPMENT,' AND SECTION 0181132F
"SUSTAINABLE DESIGN REQUIREMENTS - LEED FOR SCHOOLS "
B. IN-PLACE MATERIALS: 11SE MATERIALS FOR PATCHING IDENTICAL TO IN-PLACE MATERIALS. FOR
EXPOSED SURFACES, USE MATERIALS THAT VISUALLV MATCH IN-PLACE ADJACENT SURFACES TO
THE FULLEST EXTENT POSSIBLE.
1. IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS THAT, WHEN
INSTALLED, WILL PROVIDE A MATCH ACCEPTABLE TO ARCHITECT FOR THE VISUAL AND
FUNCTIONAL PERFORMANCE OF IN-PLACE MATERIALS.
PART 3 - EXECUTION
3.1 EXAMINATION
A EXISTING CONDITIONS: THE EXISTENCE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES
AND CONSTRUCTION INOICATED AS EXISTING ARE NOT GUARANTEED. BEFORE BEGINNING
SITEWORK, INVESTIGATE AND VERIFV THE EXISTENCE AND LOCATION OF UNDERGROUND
UTILITIES, MECHANICAL AND ELECTRICAL SVSTEMS, AND OTHER CONSTRUCTION AFFECTING THE
WORK.
1. BEFORE CONSTRUCTION. VERIFY THE LOCATION AND INVERT ELEVATION AT POINTS OF
CONNECTION OF SANITARV SEWER, STORM SEWER, AND WATERSERVICE PIPING;
UNDERGROl1N� ELECTRICAL SERVICES, AND OTHER UTILITIES.
2. FURNISH LOCATION �ATA FOR WORK RELATED TO PROJECT THAT MUST BE PERFORMED BV
PUBLIC UTILITIES SERVING PROJECT SITE.
B. E%AMINATION ANO ACCEPTANCE OF CONDITIONS: BEFORE PROCEED WG WITH EACH COMPONENT
OF THE WORK, EXAM WE SUeSTRATES, AREAS, AND CONDITIONS, W ITH INSTALLER OR APPLICATOR
PRESENT WHERE IN�ICATED, FOR COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION
TOLERANCES AND OTHER CONOITIONS AFFECTING PERFORMANCE. RECORD OBSERVATIONS.
1. EXAMINE ROUGH ING-M FOR MECHANICAL AND ELECTRICAL SVSTEMS TO VERIFV ACTUAL
LOCATIONS OF CONNECTIONS BEFORE EQUIPMENT AN� RXTURE INSTALLATION.
2 EXAMINE WALLS, FLOORS, AND ROOFS FOR SUITABLE CONDITIONS WHERE PRODUCTS AND
SVSTEMS ARE TO BE INSTALLED.
3. VERIFV COMPATIBILITV W ITH AND SUITABILITV OF SUBSTRATES, INCLUDING COMPATIBILITV W ITH
EXISTING FINISHES OR PRIMERS.
C. PROCEEo W ITH INSTALLATION ONLV AFTER UNSATISFACTORV CONDITIONS HAVE BEEN
CORRECTED. PROCEEDING WITH THE WORK INDICATES ACCEPTANCE OF SURFACES AND
CONDITIONS.
32 PREPARATION
A EXISTING UTILITY W FORMATION�. FURNISH WFORMATION TO OWNER THAT IS NECESSARV TO
ADJl15T, MOVE, OR RELOCATE EXISTING UTILITY STRUCTURES, UTILITV POLE$ LINES, SERVICES,
OR OTHER UTILITV APPURTENANCES LOCATED IN OR AFFECTED BV CONSTRUCTION. COORDINATE
WITH AUTHORITIES HAVING JURIS�ICTION.
B. FIELO MEASl1REMENTS TAKE FlELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLV.
RECHECK MEASUREMENTS BEFORE INSTALLING EACH PRODUCT. WHERE PORTIONS OF THE
WORK ARE INDICATED TO RT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER
CONSTRUCTION BV FIELD MEASUREMENTS BEFORE FABRICATION. COORDINATE FABRICATION
SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID OELAVING THE WORK.
G SPACE REQUIREMENTS'. VERIFV SPACE REQUIREMENTS AND DIMENSIONS OF ITEMS SHOWN
�IAGRAMMATICALLV ON �RAWINGS.
D. REVIEW OF CONTRACT DOCUMENTS AND RELD CONDITIONS�. IMMEDIATELV ON DISCOVERV OF THE
NEED FOR CLARIFICATION OF THE CONTRACT DOCUMENTS CAUSE� BV �IFFERING FlELD
CONOITIONS OUTSIDE THE CONTROL OF CONTRACTOR, SUBMITA REpUEST FOR WFORMATION TO
ARCHITECT ACCORDING TO REQUIREMENTS IN SECTION 013100 "PROJECT MANAGEMENT AND
COORDINATION"
33 CONSTRUCTION LAVOl1T
A. VERIFlCATION: BEFORE PROCEEDING TO LAV OUTTHE WORK, vERIFV LAVOUT WFORMATION
SHOWN ON DRAWINGS, IN RELATION TO THE PROPERTV SURVEYAND EXISTING BENCHMARKS. IF
OISCREPANQES ARE DISCOVERED, NOTIFV ARCHITECT PROMPTLV.
B. SITE IMPROVEMENTS LOCATE AND LAY OUT SITE IMPROVEMENTS, INCLU�ING PAVEMENTS,
GRADING, RLL AND TOPSOIL PLACEMENT, UTILITY SLOPES, AND RIM AND INVERT ELEVATIONS.
C. BUILOING LINES ANO LEVELS LOCATE AND LAV OUT CONTROL LINES AND LEVELS FOR
STRUCTURES, BUILDING FOUNDATIONS, COLUMN GRIDS, AND FLOOR LEVELS, INCLUDING THOSE
REQUIRED FOR MECHANICAL AND ELECTRICAL W ORK. TRANSFER SURVEY MARKINGS AND
ELEVATIONS FOR USE W ITH CONTROL LINES AND LEVELS LEVEL FOUNDATIONS AND PIERS FROM
TW O OR MORE LOCATIONS.
3A FlELD ENG W EERING
A. IOENTIFICATION:OWNER WILL IDENTIFV EXISTING BENCHMARKS, CONTROL POINTS, AND PROPERTV
CORNERS
B. REFERENCE POINTS: LOCATE EXISTING PERMANENT BENCHMARKS, CONTROL POINTS, AND SIMILAR
REFERENCE POINTS BEFORE BEGINNING THE WORK. PRESERVE AND PROTECT PERMANENT
BENCHMARKS AND CONTROL POINTS DURING CONSTRUCTION OPERATIONS.
3.S INSTALLATION
A. GENERAL LOCATE THE W ORK AND COMPONENTS OF THE W ORK ACCURATELY, IN CORRECT
ALIGNMENT AND ELEVATION, AS INDICATED.
1. MAKE VERTICAL WORK PWMB AND MAKE HORIZONTAL WORK LEVEL.
2 W HERE SPACE IS LIMITEO, INSTALL COMPONENTS TO MAXIMIZE SPACE AVAILABLE FOR
MAINTENANCE AND EASE OF REMOVAL FOR REPLACEMENT.
3. CONCEAL PIPES, DUCTS, AND W IRING IN FINISHED AREAS UNLESS OTHERW ISE INDICATED.
4. MAINTAIN MINIMUM HEAOROOM CLEARANCE OF 96 INCHES (2440 MM) IN OCCUPIED SPACES ANO
901NCHES (2300 MM) IN UNOCCUPIED SPACES.
B. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AN� RECOMMENDATIONS FOR
INSTALLING PROOUCTS IN APPLICATIONS IN�ICATEO.
C. INSTALL PRODUCTS AT THE TIME AND UNDER CONDITIONS THAT W ILL ENSURE THE BEST POSSIBLE
RESULTS. MAINTAIN CONDITIONS REQUIRED FOR PRODUCT PERFORMANCE UNTIL SUBSTANTIAL
COMPLETION.
D. CONDUCT CONSTRUCTION OPERATIONS SO NO PART OF THE WORK IS SUBJECTED TO DAMAGING
OPERATIONS OR LOADING W EXCESS OF THAT EXPECTED DURWG NORMAL CONDITIONS OF
OCCUPANCV.
E. SEQUENCE THE WORK AND ALLOW ADEQUATE CLEARANCES TO ACCOMMODATE MOVEMENT OF
CONSTRUCTION ITEMS ON SITE AND PLACEMENT IN PERMANENT LOCATIONS.
F. TOOLS AND EOl11PMENT: 00 NOT USE TWLS OR EQUIPMENT THAT PRODUCE HARMFl1L NOISE
LEVELS
G. TEMPLATES: OBTAIN AND DISTRIBUTE TO THE PARTIES INVOLVED TEMPLATES FOR WORK SPEGREC
TO BE FACTORV PREPARED AND FIELD INSTALLED. CHECK SHOP DRAWINGS OF OTHER WORK TO
CONFIRM THAT ADEQUATE PROVISIONS ARE MADE FOR LOCATWG AND INSTALLING PRODUCTS TO
COMPLV WITH INDICATED REQUIREMENTS.
SECTION 017300- EXECUTION (CONT.)
H. ATTACHMENT: PROVIDE BLOCKING AND ATTACHMENT PLATES AND ANCHORS AND FASTENERS OF
ADEQUATE SRE AND NUMBER TO SECURELV ANCHOR EACH COMPONENT IN PLACE, ACCURATELV
LOCATED AND ALIGNED W ITH OTHER PORTIONS OF THE W ORK. W HERE SRE AND TVPE OF
ATTACHMENTS ARE NOT INDICATED VERIFV SIZE AN� TVPE REQl11RED FOR LOAD CONDITIONS.
1. MOUNTING HEIGHTS: WHERE MOUNTING HEIGHTS ARE NOT INDICATED, MOUNT COMPONENTS
AT HEIGHTS DIRECTED BV ARCHITECT.
2. ALLOW FOR BUILDING MOVEMENT, INCLUDING THERMAL EXPANSION AND CONTRACTION.
3. COOR�INATE INSTALLATION OF ANCHORAGES. FURNISH SETTING DRAW WGS, TEMPLATES, AND
DIRECTIONS FOR INSTALLING ANCHORAGES, INCLUOING SLEEVES, CONCRETE INSERTS,
ANCHOR BOLTS, AND ITEMS W ITH INTEGRAL ANCHORS, THAT ARE TO BE EMBEDDED IN
CONCRETE OR MASONRY. DELIVER SUCH ITEMS TO PROJECT SITE IN TIME FOR INSTALL4TION.
I. JOINTS'. MAKE JOINTS OF UNIFORM W IOTH. WHERE JOIM LOCATIONS IN EXPOSEO WORK ARE NOT
INDICATED, ARRANGE JOINTS FOR THE BEST VISUAL EFFECT. FIT EXPOSED CONNECTIONS
TOGETHER TO FORM HAIRLME JOINTS.
J. HAZARDOUS MATERIALS: USE PRODUCTS, CLEANERS, AND INSTALLATION MATERIALS THAT ARE NOT
CONSIDERED HA7ARDOUS.
K. CLEANING: CLEAN AREAS AND SPACES W HERE CUTTING AND PATCHING ARE PERFORMEO. REMOVE
PAINT, MORTAR, OILS, PUTTV, AND SIMILAR MATERIALS FROM ADJACENT FINISHE� SURFACES.
3.60WNER-INSTALLED PRODUCTS
A. SITE ACCE55: PROVIDE ACCE55 TO PROJECT SITE FOR OW NER'S CONSTRUCTION PERSONNEL.
B. COORDINATION: COORDINATE CONSTRUCTION AN� OPERATIONS OF THE WORK W ITH WORK
PERFORMED BV OWNER'S CONSTRUCTION PERSONNEL.
1. CONSTRUCTION SCHEDULE'. INFORM OWNER OF CONTRACTOR'S PREFERRED CONSTRUCTION
SCHEDULE FOR OWNER'S PORTION OF THE WORK. ADJUST CONSTRUCTION SCHEDULE BASED
ON A MUTUALLV AGREEABLE TIMETABLE NOTIFV OWNER IF CHANGES TO SCHEDULE ARE
REOUIRED DUE TO DIFFERENCES IN ACTUAL CONSTRUCTION PROGRE55.
37 PROGRESS CLEANING
A. GENERAL�. CLEAN PROJECT SITE ANo WORK AREAS DAILV, INCLUDING COMMON AREAS. ENFORCE
REOUIREMENTS STRICTLV. DISPOSE OF MATERIALS LAWFULLY.
B. WORK AREAS: CLEAN AREAS W HERE WORK IS IN PROGRESS TO THE LEVEL OF CLEANLWESS
NECESSARV FOR PROPER EXECUTION OF THE WORK.
C. INSTALLED WORK'. KEEP INSTALLEO WORK CLEAN. CLEAN INSTALLED SURFACES ACCORDING TO
WRITTEN MSTRUCTIONS OF MANl1FACTURER OR FABRICATOR OF PRODUCT INSTALLED, USING
ONLV CLEANING MATERIALS SPEQRCALLY RECOMMENDED. IF SPEGFlC 0.EANING MATERIALS ARE
NOT RECOMMENDED, USE CLEANING MATERIALS THAT ARE NOT HAZARDOUS TO HEALTH OR
PROPERTV AND THAT WILL NOT DAMAGE EXPOSE� SURFACES.
D. CONCEALED SPACES: REMOVE DEBRIS FROM CONCEALED SPACES BEFORE ENCLOSING THE
SPACE. EXPOSE� SURFACES IN FINISHED AREAS: CLEAN EXPOSE� SURFACES AN� PROTECT AS
NECESSARV TO ENSURE FREEDOM FROM DAMAGE AND DETERIORATION AT TIME OF SUBSTANTIAL
COMPLETION.
E. WASTE DISPOSAL'. COMPLY WITH LOCAL GREEN BUILDING ORDINANCE WRITTEN REOUIREMENTS.
F. DURING HANDLING AND INSTALLATION, CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND
ADJOINMG MATERIALS ALREADV IN PLACE. APPLV PROTECTNE COVERING WHERE REQUIRED TO
ENSURE PROTECTION FROM DAMAGE OR DETERIORATION AT SUBSTANTIAL COMPLETION. CLEAN
AND PROVI�E MAINTENANCE ON COMPLETED CONSTRl1CTION AS FRE�UENTLV AS NECESSARV
THROUGH THE REMAINDER OF THE CONSTRUCTION PERIOo. AOJUST AND LUBRICATE OPERABLE
COMPONENTSTO ENSURE OPERABILITV WITHOUT DAMAGING EFFECTS.
G. LIMITING EXPOSURES: SUPERVISE CONSTRUCTION OPERATIONS TO ASSl1RE THAT NO PART OF THE
CONSTRUCTION, COMPLETED OR IN PROGRESS, IS SUBJECT TO HARMFUL, oANGEROUS.
DAMAGING, OR OTHERWISE DELETERIOl15 EXPOSURE DURING THE CONSTRUCTION PERIOD.
3.8 STARTING AND A�JUSTING
A. START EQUIPMENT AND OPERATING COMPONENTS TO CONRRM PROPER OPERATION. REMOVE
MALFUNCTIONING UNITS, REPLACE WITH NEW UNITS, AND RETEST. ADJUST EpUIPMENT FOR
PROPER OPERATION. ADJUST OPERATING COMPONENTS FOR PROPER OPERATION W ITHOUT
BIN�ING. TEST EACH PIECE OF EQUIPMENT TO VERIFV PROPER OPERATION. TEST AND ADJUST
CONTROLS ANO SAFETIES. REPLACE OAMAGEO AND MALFUNCTIONING CONTROLS ANO
EQUIPMENT.
3.9 PROTECTION OF INSTALLED CONSTRUCTION
A. PROVIDE FlNAL PROTECTION AND MAINTAIN CON�ITIONS THAT ENSURE INSTALLED WORK IS
W ITHOUT DAMAGE OR DETERIORATION AT TIME OF SUBSTANTIAL COMPLETION. COMPLV W ITH
MANUFACTURER'S WRITTEN INSTRUCTIONS FORTEMPERATUREAND RELATNE HUMIDITY.
SECTION 017329 - CUTTING AND PATCHING
PART1-GENERAL
1.iRELATEDDOCUMENTS
A. DRAW INGS AND GENERAL PROVISIONS OF THE CONTRACT, INC W DING GENERAL ANO
SUPPLEMENTARV CON�ITIONS AND OTHER �IVISION 1 SPECIFICATION SECTIONS, APPLV TO THIS
SECTION.
125UMMARV
A. THIS SECTION INCLUDES PROCEDURAL RE�UIREMENTS FOR CUTTMG AND PATCHING.
B. RELATED SECTIONS INCLUDE THE FOLLOWING:
1. DIVISION 1 SECTION "SELECTNE DEMOLITION" FOR OEMOLITION OF SELECTED PORTIONS OF THE
BUILDING.
2. �IVISIONS 2 THROUGH 33 SECTIONS FOR SPEGFlC REQUIREMENTS AND LIMITATIONS
APPLICABLE TO Cl1TTING AND PATCHING INDIVIOUAL PARTS OF THE WORK.
3. DIVISION 7 SECTION "THROUGH-PENETRATION FIRESTOP SVSTEMS" FOR PATCHING FIRE-RATED
CONSTRUCTION.
1.3 �EFINITIONS
A. CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION NECESSARV TO PERMIT INSTALLATION OR
PERFORMANCE OF OTHER WORK. PATCHING FlTTWG AND REPAIR WORK RE�UIRED TO RESTORE
SURFACES TO ORIGINAL CONDITIONS AFTER W STALLATION OF OTHER W ORK.
1 4 SUBMITTALS
A. CUTTING AN� PATCHING PROPOSAL: SUBMIT A PROPOSAL DESCRIBING PROCEDURES BEFORE THE
TIME CUTTING AND PATCHING WILL BE PERFORMEO, REQUESTING APPROVALTO PROCEED.
INCLU�E THE FOLLOWING MFORMATION:
L EXTENT�. DESCRIBE CUTTING AND PATCHING, SHOW HOW THEV WILL BE PERFORMED, AND
INDICATE W HV THEV CANNOT BE AVOIDED.
2. CHANGES TO IN-PLACE CONSTRUCTION: DESCRIBE ANTICIPATED RESULTS. INCLUDE CHANGES
TO STRUCTURAL ELEMENTS AND OPERATING COMPONENTS AS WELL AS CHANGES IN
BUILDING'S APPEARANCE AND OTHER SIGNIRCANT VISUAL ELEMENTS.
3. PRODUCTS: LIST PRO�UCTS TO BE USED AND FIRMS OR ENTITIES THAT WILL PERFORM THE
WORK.
4. DATES: INDICATE W HEN CUTTING AND PATCHING WILL BE PERFORMED.
5. UTILITV SERVICES AND MECHANICAVELECTRICAL SVSTEMS: LIST SERVICES/SVSTEMS THAT
CUTTING AND PATCH W G PROCEDURES W ILL DISTURB OR AFFECT. LIST SERVICES/SVSTEMS
THAT W ILL BE RELOCATED AND THOSE THAT W ILL BE TEMPORARILY OUT OF SERVICE.
INDICATE HOW LONG SERVICES/SVSTEMS WILL BE DISRUPTED.
6. STRUCTURAL ELEMENTS�. WHERE CUTTMG AND PATCHING INVOLVE ADDING REMFORCEMENT
TO STRUCTURAL ELEMENTS, Sl16MIT �ETAILS AND ENGINEERING CALCULATIONS SHO W ING
INTEGRATION OF REINFORCEMENT W ITH ORIGINAL STRUCTURE.
7.S QUALITY ASSUR4NCE
A. STRl1CTl1RAL ELEMENTS: DO NOT CUT AN� PATCH STRUCTURAL ELEMENTS IN A MANNER THAT
COULD CHANGE THEIR LOA�-CARRVING CAPACITV OR LOAD DEFLECTION RATIO.
B. OPERATIONAL ELEMENTS: DO NOT CUT AN� PATCH OPERATWG ELEMENTS AN� RELATED
COMPONENTS IN A MANNER THAT RESULTS IN RE�UCING THEIR CAPACITV TO PERFORM AS
INTENDE� OR THAT RESULTS IN INCREASED MAINTENANCE OR �ECREASED OPERATIONAL LIFE OR
SAFETV.
1. PRIMARV OPERATIONAL SVSTEMSAND EQl11PMENT.
2. AIR OR SMOKE BARRIERS.
3. RRESUPPRESSION SVSTEMS.
4. MECHANICAL SVSTEMS PIPING AND DUCTS.
S.CONTROLSVSTEMS.
fi. COMMUNICATION SVSTEMS.
]. WNVEVING SYSTEMS.
8. ELECTRICAL W IRING SVSTEMS.
G MISCELLANEOUS ELEMENTS'. DO NOTCUTAND PATCH MISCELLANEOUS ELEMENTS OR RELATED
COMPONENTS IN A MANNER THAT COULO CHANGE THEIR LOADCARRVING
CAPACITV, THAT RESULTS IN REDUCING THEIR CAPACITV TO PERFORM AS INTENDED, OR THAT
RESULTS IN INCREASED MAIMENANCE OR DECREASED OPERATIONAL LIFE OR SAFETV.
MISCELLANEOUS ELEMENTS WCWDE THE FOLLOWING:
1. WATER, MOISTURE.OR VAPOR BARRIERS.
2. MEMBRANES AND FLASHINGS.
3. EXTERIOR CURTAIN-WALL CONSTRUCTION.
4. EQUIPMENT SUPPORTS.
5. PIPING, DUCTWORK, VESSELS. AND E�UIPMENT.
6. NOISE- AND VIBRATION-CONTROL ELEMENTS AND SYSTEMS.
D. VISUAL REQUIREMENTS'. DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN
VISUAL EVIDENCE OF CUTTING AND PATCHING. DO NOT CUT
AND PATCH CONSTRUCTION EXPOSEO ON THE EXTERIOR OR IN OCCUPIEO SPACES IN A MANNER
THAT WOULD, IN ARCHITECT'S OPINION, REDUCE THE BUIL�INGS AESTHETIC QUALITIES. REMOVE
AND REPLACE CONSTRUCTION THAT HAS BEEN CUT AND PATCHED IN A VISUALLV
UNSATISFACTORY MANNER.
1.6 WARRANTY
A EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT
OR DAMAGE� DURING CUTTING AND PATCHING OPERATIONS, BYMETH0�5 AND WITH MATERIALS
SO AS NOT TO VOID EXISTING WARRANTIES.
PART2-PRODUGTS
2.1 MATERIALS
A. GENERAC COMPLV W ITH REQUIREMENTS SPEqFIED IN OTHER SECTIONS.
B. IN-PLACE MATERIALS�. USE MATERIALS IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED
SURFACES, USE MATERIALS THAT VISUALLV MATCH IN-PLACE ADJACENT SURFACES TO THE
FULLEST E%TENT POSSBLE IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USE�, USE
MATERIALS THAT, WHEN INSTALLED. W ILL MATCH THE VISUAL AND FUNCTIONAL PERFORMANCE OF
IN-PLACE MATERIALS.
PART 3 - E%ECUTION
3.1 EXAMINATION
A EXAMME SURFACES TO BE CUT AND PATCHED AND CON�ITIONS UNDER WHICH CUTTING AND
PATCHING ARE TO BE PERFORMED. COMPATIBILITV: BEFORE PATCHING, VERIFY COMPATIBILITV
W ITH AND SUITABILITV OF SUBSTRATES, INCWDING COMPATIBILITV WITH IN-PLACE FlNISHES OR
PRIMERS. PROCEED W ITH INSTALLATION ONLV AFTER UNSAFE OR UNSATISFACTORY CONDITIONS
HAVEBEENCORRECTED.
32 PREPARATION
A. TEMPORARY SUPPORT: PROVIOE TEMPORARV SUPPORT OF W ORK TO BE CUT. PROTECTION:
PROTECT IN-PLACE CONSTRUCTION DURWG CUTTING AND PATCHING TO PREVENT DAMAGE.
PROVIDE PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS OF PROJECT THAT
MIGHT BE EXPOSED DURING CUTTING AND PATCHING OPERATIONS.
B. ADJOINING AREAS: AVOID INTERFERENCE W ITH USE OF ADJOINING AREAS OR INTERRUPTION OF
FREE PASSAGE TO ADJOINING AREAS EXISTING UTILITV SERVICES AND MECHANICALIELECTRICAL
SVSTEMS WHERE EXISTING SERVICES/SVSTEMS ARE REpl11RE� TO BE REMOVED, RELOCATED, OR
ABANDONED, BVPASS SUCH SERVICES/SVSTEMS BEFORE CUTTING TO PREVENT INTERRUPTION TO
OCCUPIE� AREAS.
3.3PERFORMANCE
A. GENERAL EMPLOV SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH
CUTTING AND PATCHING AT THE EARLIEST FEASIBLE TIME, AND COMPLETE W ITHOUT DELAV.
1. CUT IN-PLACE CONSTRUCTION TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR
PERFORMANCE OF OTHER CONSTRUCTION, AND SU85EQUENTLV PATCH AS REQUIRE� TO
RESTORE SURFACES TO THEIR ORIGINAL CONDITION.
SECTION 017329 - CUTTING AND PATCHING (CONT.)
B. CUTTWG CUT IN-PLACE CONSTRUCTION BV SAWING, DRILLING, BREAKING, CHIPPING, GRINDWG,
AN� SIMILAR OPERATIONS. INCWDING EXCAVATION, USING METHODS LEAST LIKELV TO �AMAGE
ELEMENTS RETAWE� OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW PROPOSED
PROCEDURES WITH ORIGINAL MSTALLER' COMPLY WITH ORIGINAL INSTALLER'S WRITTEN
RECOMMEN�ATIONS.
1. IN GENERAL, USE HAND OR SMALL POW ER TOOLS DESIGNED FOR SAWING AND GRINDING, NOT
HAMMERING AND CHOPPING. CUT HOLES AND SLOTS AS SMALL AS POSSIBLE NEATLV TO SIZE
REpUIRED, ANO W ITH MINIMUM DISTURBANCE OF ADJACENT SURFACES. TEMPORARILV COVER
OPENINGS W HEN NOT IN USE.
2 FlNISHED SURFACES: CUT OR DRILL FROM THE EXPOSE� OR RNISHED SIDE INTO CONCEALED
SURFACES.
3. CONCRETE AND MASONRV: CUT USING A CUTTING MACHINE, SUCH AS AN ABRASIVE SAW OR A
DIAMOND-CORE DRILL.
4. MECHANICAL AND ELECTRICAL SERVICES: CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS
TO BE REMOVEo. CAP, vALVE, OR PLUG AND SEAL REMAINING PORTION OF PIPE OR CONDUIT
TO PREVENT ENTRANCE OF MOISTURE OR OTHER FOREIGN MATTER AFTER CUTTING.
5. PROCEEO WITH PATCHING AFTER CONSTRUCTION OPERATIONS REQUIRING CUTTING ARE
COMPLETE.
Q PATCHING: PATCH CONSTRUCTION BV FlLLING, REPAIRING, REFlNISHING, CLOSING UP, AND SIMILAR
OPERATIONS FOLLOWING PERFORMANCE OF OTHER WORK. PATCH W ITH OIIRABLE SEAMS THAT
AREAS INVISIeLE AS POSSIBLE. PROVIDE MATERIALS AND COMPLV WITH INSTALLATION
REQUIREMENTS SPEQFlED IN OTHER SECTIONS.
1. INSPECTION�. W HERE FEASIBLE, TEST AND INSPECT PATCHE� AREAS AFTER COMPLETION TO
DEMONSTRATE INTEGRITV OF INSTALLATION.
2 EXPOSED FlNISHES'. RESTORE EXPOSED RNISHES OF PATCHEDAREAS AND EXTEND RNISH
RESTORATION MTO RETAW ED ADJOINING CONSTRUCTION IN A MANNER THAT W ILL ELIMINATE
EVIDENCE OF PATCHING AND REFINISHING.
A. CLEAN PIPING. CONDUIT, AND SIMILAR FEATURES BEFORE APPLVING PAINT OR OTHER
RNISHING MATERIALS.
e. RESTORE �AMAGED PIPE COVERING TO ITS ORIGINALCONDITION.
3. FLOORS AN� WALLS'. W HERE WALLS OR PARTITIONS THAT ARE REMOVED EXTEND ONE FINISHED
AREA INTO ANOTHER, PATCH AND REPAIR FLOORAND WALL SURFACES W THE NEW SPACE.
PROVIOE AN EVEN SURFACE OF UNIFORM FINISH, COLOR, TEXTURE, AND APPEARANCE.
REMOVE IN-PLACE FLOORAND WALL COVERINGS AND REPLACE WITH NEW MATERIALS, IF
NECESSARV, TO ACHIEVE UNIFORM COLOR AND APPEARANCE.
A. WHERE PATCHWG OCCURS IN A PAINTED SURFACE, APPLV PRIMER AND INTERMEDIATE
PAINT COATS OVER THE PATCH AND APPLV FlNAL PAINT COAT OVER ENTIRE UNBROKEN
SURFACE CONTAINING THE PATCH. PROVIDE ADDITIONAL COATS UNTIL PATCH BLENDS
W ITH ADJACENT SURFACES.
4. CEILWGS: PATCH, REPAIR, OR REHANG IN-PLACE CEILMGS AS NECESSARV TO PROVIDE AN
EVEN-PLANE SURFACE OF UNIFORM APPEARANCE.
5. EXTERIOR BUILDING ENCLOSURE PATCH COMPONENTS IN A MANNER THAT RESTORES
ENCLOSURE TO A WEATHERTIGHT CONDITION.
D. CLEANING: CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMEO.
COMPLETELV REMOVE PAINT, MORTAR, OILS, PUTTV, AND SIMILAR MATERIALS.
�
�
/ ♦ 1
�
INDUSTRIOUS
COWORKING
880 W MONON GREEN BLVD
CARMEL, IN 46032
OWNEPRENANT
INDUSTRIOUS
215PARKAVES,4E1300
NEW YORK, NY 1 W03
ARCXITECT OF HECOPD
NORX
325 N LASALLE Si- SOIiE SCO
CHICAGO. IL 60654
PEiER.DUBWCmNORR-COM
312-0242400
MEP ENGINEER
MEENGINEERS
29 WEST 38iH SiREEi, SiH FLOOR
NEW YORK. NY 10018
CONiACi: BRIAN SHASSIAN
BBIANSHASSIANC�.ME-ENGINEER$_COM
JOHN HIGGINS
JOHN.HIGGWS(�MEENGINEERS.COM
�212J 44]-6]]0 PHONE
LIGHTING DESIGNER
REGENCY
9261 JOkDAN AVE
CHAiSWORiH, CA
800-28d-202J
ISSUE DATES
REV. DAiE DESCRIPiION
06/OS/2020 DD3
06/18l2020 CDvI
0]/06/2020 CDv2
O]/V/2020 100%/PERMIT
SEAL&SIGNATUNE
BY CHECK
BG PJ
BC PJ
eC Po
BC PJ
CARMEL CITY- 880 MONON GREEN
PRQIECT NUMBER
IND680MON
DRAWING TITLE
SPECIFlCATIONS
SCALE
� � �Zii _ , i oii
SHEET NUMBER
A-901
oF
PROJECTNAME