Loading...
HomeMy WebLinkAboutA901 SpecsSECTION 014200-REFERENCES PART1-GENERAL 1.1RELATEDDOCUMENTS A. DRAWMGSAND GENERAL PROVISIONS OFTHE CONTRACT, MCLUDING GENERAL AND SUPPLEMENTARV CONDITIONS AND OTHER DNISION 01 SPECIFICATION SECTIONS, APPLV TO THIS SECTION. 12 DEFlNITIONS A. GENER4L BASIC CONTRACT OEFINITIONS ARE INCW DED W THE CONDITIONS OF THE CONTRACT. B. "APPROVED": W HEN USED TO CONVEV ARCHRECT'S ACTION ON CONTRACTOR'S SUBMITTAL$ APPLICATIONS, AND REQUESTS, "APPROVED" IS LIMITED TO ARCHITECT'S DUTIES AND RESPONSIBILITIES AS STATE� IN THE CON�ITIONS OF THE CONTRACT. C. "DIRECTED": A COMMAND OR INSTRUCTION BV ARCHITECT. OTHER TERMS INCLUD W G"REQUESTED," "AUTHORIZED,"'BELECTE�;"RWUIRED," AND'PERMITTED" HAVE THE SAME MEANING AS "DIRECTED" D. "INDICATED": REQUIREMENTS EXPRESSED BV GRAPHIC REPRESENTATIONS OR IN WRITTEN FORM ON �RAW INGS, IN SPEQFICATIONS, AND IN OTHER CONTRACT DOCUMENTS. OTHER TERMS INCW DING "SHOWN," "NOTED," "SCHEDULED," AN� "SPECIFIED" HAVE THE SAME MEANING AS "INDICATED" E'REGULATIONS"'. LAW 5, OR�INANCES, STATUTES, AND LAW FUL ORDERS ISSUED BV AUTHORITIES HAVING JURISDICTION, AND RULE$ CONVENTIONS, AND AGREEMENTS W ITH W THE CONSTRUCTION INOUSTRV THAT CONTROL PERFORMANCE OF THE WORK. F"FURNISH"'. SUPPLV AND �ELNER TO PROJECT SITE, READV FOR UNLOADING, UNPACKING, ASSEMBLV. INSTALLATION, AND SIMILAR OPERATIONS. G. "INSTALL": UNLOAD, TEMPORARILY STORE, UNPACK, ASSEMBLE, ERECT, PLACE, ANCHOR, APPLV, WORK TO DIMENSION, FlNISH, CURE, PROTECT, CLEAN, AND SIMILAR OPERATIONS AT PROJECT SITE H. "PROVIDE" FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE. I. "PROJECT SITP': SPACE AVAILABLE FOR PERFORMING CONSTRUCTION ACTIVITIES. THE EXTENT OF PROJECT SITE IS SHOWN ON DRQW INGS AN� MAV OR MAV NOT BE IDENTICAL W ITH THE DESCRIPTION OF THE LAND ON W HICH PROJECT IS TO BE BUILT. 131NDUSTRVSTAN�ARDS A. APPLICABILITV OF STANOAROS: UNLESS THE CONTRACT DOCUMENTS INCWOE MORE STRINGENT REQUIREMENTS, APPLICABLE CONSTRUCTION INDUSTRV STANDARDS HAVE THE SAME FORCE AND EFFECT AS IF BOUND OR COPIED DIRECTLV INTO THE CONTRACT DOCUMENTS TO THE EXTENT REFERENCE�. SUCH STAN�ARDS ARE MADE A PART OF THE CONTRACT DOCUMENTS BV REFERENCE. B. PUBLICATION DATES: COMPLV W ITH STANDARDS M EFFECT AS OF DATE OF THE CONTRACT �OCUMENTS UNLESS OTHERWISE INDICATED. G COPIES OF STANDARDS: EACH ENTITV ENGAGED W CONSTRUCTION ON PROJECT SHOULD BE FAMILIAR W ITH INDUSTRY STANDARDS APPLICABLE TO ITS CONSTRUCTION ACTNITY. COPIES OF APPLICABLE STANDARDS ARE NOT BOUND W ITH THE CONTRACT DOCUMENTS. 1. WHERE COPIES OF STANDARDS ARE NEEDE� TO PERFORM A REQUIRED CONSTRUCTION ACTIVITV. OBTAIN COPIES DIRECTLV FROM PUBLICATION SOURCE. 1 4 ABBREVIATIONS AND ACRONVMS A. M�USTRV ORGANIZATIONS: WHERE ABeREVIATIONS ANo ACRONVMS ARE USED M SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNRED NAME OFTHE ENTITIES INDICATE� IN GALE'S "ENCVCLOPEDIA OF ASSOQATIONS NATIONAL ORGANIZATIONS OF THE LLS" OR W COLUMBIA BOOKS"'NATIONAL TRADE & PROFESSIONAL ASSOCIATIONS OF THE UNITED STATES" B. INDUSTRV ORGANIZATIONS: WHERE ABBREVIATIONS AND ACRONVMS ARE USED M SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNIZED NAME OF THE ENTITIES IN THE FOLLOW WG LIST. THIS MFORMATION IS SUBJECT TO CHANGE AND IS BELIEVED TO BE ACCURATE AS OF THE DATE OF THE CONTRACT �OCUMENTS. 1. AABC - ASSOqATED AIR BALANCE COUNCIL; W W W.AABGCOM. 2. AAMA - AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION', W W W.AAMANET.ORG. 3. ACI - AMERICAN CONCRETE INSTITUTE', (FORMERLV: ACI INTERNATIONAL); W W W.CONCRETE.ORG. 4. AEIC - ASSOCIATION OF EDISON IL W MINATING COMPAMES, W G(THE); W W W AEIC.ORG. 5. AIA - AMERICAN INSTITUTE OF ARCHITECTS (THE); W W W AIA ORG. 6. AISC - AMERICAN INSTITUTE OF STEEL CONSTRUCTION; WWW AISQORG. 1. AITC - AMERICAN INSTITUTE OF TIMBER CONSTRUCTION; W W W.AITGGLULAM.ORG. 8. ANSI -AMERICAN NATIONAL STANDARDS INSTITUTE; W W W ANSI.ORG. 9. APA - ARCHITECTUR4L PRECAST ASSOCIATION; W W W.ARCHPRECAST.ORG. 10. ARI - AIR-CONDITIONING 8 REFRIGERATION INSTITUTE; (SEE AHRI). 11. ARI - AMERICAN REFRIGERATION INSTITUTE; (SEE AHRI). 12. ARMA - ASPHALT ROOFING MANUFACTURERS ASSOCIATION; W W W ASPHALTROOFING.ORG. 13. ASCE/SEI - AMERICAN SOQETV OF CNLL ENGMEERSISTRUCTURAL ENG W EERING INSTITUTE; (SEE ASGE). 14. ASHRAE - AMERICAN SOCIETV OF HEATING, REFRIGERATWG AND AIR-CONDITIONING ENGMEERS', W W W ASHRAEORG. 15. ASSE - AMERICAN SOCIETV OF SANITARY ENGINEERING; W W W ASSE-P W MBING.ORG. i6. ASTM - ASTM INTERNATIONAL; (AMERICAN SOCIETV FOR TESTING AND MATERIALS INTERNATIONAL�; W W W ASTM.ORG. 1]. AWEA - AMERICAN WIND ENERGV ASSOCIATION; W W W AWEA.ORG. 18. AW I- ARCHITECTURAL W OODWORK INSTITUTE; W W W AW WET.ORG. 19. AWMAC -ARCHITECTURAL WOODWORK MANUFACTURERS ASSOCIATION OF CANADA; WWW.AWMACLOM. 20. AWPA - AMERICAN W00� PROTECTION ASSOqATION; (FORMERLV: AMERICAN WOOD- PRESERVERS' ASSOQATION ); W W W.AW PA.COM. 21. AW 5- AMERICAN W ELDING SOCIETV; W W W.AW S.ORG. 22. BHMA - BUILDERS HARDW ARE MANUFACTURERS ASSOCIATION; W W W.BUILDERSHARDWARECOM. 23. BIA-BRICK INDUSTRV ASSOCIATION (THE); WWW.GOBRICKLOM. 24. CISCA - CEILINGS & INTERIOR SVSTEMS CONSTRUCTION ASSOCIATION�, W W W.CISCA.ORG. 25. CRI - CARPET AND RUG INSTITUTE (THE); W W W.CARPET-RUG.ORG. 26. CRRC - COOL ROOF RATING COUNCIL�, W W W COOLR W FSDRG. 27. CRSI - CONCRETE REM FORCING STEEL INSTITUTE�, W W W.CRSI.ORG. 28. CSA - CANA�IAN STANDARDS ASSOCIATION; W W W.CSA.CA. 29. CSI-CONSTRUCTION SPECIRCATIONS INSTITUTE (THE); WWW.CSINET.ORG. 30. CSSB - CEDAR SHAKE & SHINGLE BUREAU; W W W.CEDARBUREAU.ORG. 31. DASMA - DOOR AND ACCESS SVSTEMS MANUFACTURERS ASSOCIATION; W W W.DASMA.COM. 32 OHI - �OOR AND HARDWARE W STITUTE' W W W.DHI.ORG. 33. ECA-ELECTRONIC COMPONENTS ASSOCIATION; (SEE ECIA). 34. ECAMA - ELECTRONIC COMPONENTS ASSEMBLIES 8 MATERIALS ASSOQATION; (SEE ECIA). 35. EIMA - EIFS INDUSTRV MEMBERS ASSOQATION; W W W.EIMA.COM. 36. EJMA - EXPANSION JOINT MANUFACTURERS ASSOCIATION, INC.�, W W W.EJMA.ORG. 3�. ESD - ESD ASSOCIATION; (ELECTROSTATIC �ISCHARGE ASSOqATION); W W W.ESDA.ORG. 38. FSA - FLUID SEALING ASSOCIATION �, W W W FW IDSEALING COM. 39. FSC - FOREST STEW ARDSHIP COUNCIL U.S.; W W W.FSCUS.ORG. 40. GA - GVPSUM ASSOCIATION; W W W.GVPSUM.ORG. 41. GANA - GLASS ASSOCIATION OF NORTH AMERICA; W W W.GLASSW EBSITE.COM. 42. GS - GREEN SEAL�, W W W.GREENSEAL.ORG. 43. HMMA- HOLLOW METAL MANUFACTURERS ASSOCIATION', (SEE NAAMM). 44. HPVA- HARDWOOD PLVWOOD & VENEER ASSOCIATION; W W W HPVA.ORG. 45. ICBO - INTERNATIONAL CONFERENCE OF BUILDMG OFFICIALS (SEE ICC). 46. ICC - INTERNATIONAL CODE COUNGL; W W W JCCSAFEORG. 6]. IES - ILLUMINATING ENGMEERING SOCIETY; (FORMERLV: ILW MINATING ENGINEERING SOCIETV OF NORTH AMERICA); W W W.IES-ORG. 48. IESNA - IL W MINATING ENG W EERING SOGETV OF NORTH AMERICA; (SEE IES). 49. IGMA - MSl1LATING GLA55 MANUFACTURERS ALLIANCE', W W W.IGMAONLINE.ORG. 50. IGSHPA- INTERNATIONAL GROUND SOURCE HEAT PUMP ASSOCIATION; W W W.IGSHPA.OKSTATE.EDU. SL LMA- LAMINATING MATERIALS ASSOCIATION; (SEE CPA). 52. LPI - LIGHTNING PROTECTION INSTITUTE; W W W.LIGHTNING.ORG. 53. MFMA- MAPLE FLOORING MANUFACTURERS ASSOCIATION, MG; W W W.MAPLEFLOOR.ORG. 54. MFMA - METAL FR4MING MANUFACTURERS ASSOCIATION, INC.; W W W NETALFRAMINGMFG.ORG. 55. MHIA - MATERIAL HANDLMG INDUSTRV OF AMERICA; W W W.MHIA.ORG. 56. MIA - MARBLE INSTITUTE OF AMERICA; W W W.MARBLEINSTITUTECOM. 5]. MMPA - MOULDING 8 MILLWORK PROOUCERS ASSOCIATION; (FORMERLY: W OOD MOUL�ING 8 MILLWORK PROOUCERS ASSOCIATION); W W W.WMMPA.COM. 58. MPI - MASTER PAINTERS INSTITUTE; W W W.PAINTMFQCOM. 59. MSS - MANUFACTURERS STANDARDIZATION SOCIETV OF THE VALVE AND FITTINGS INDUSTRY INQ; W W W.MSS-HQ.ORG. 60. NAAMM - NATIONAL ASSOqATION OF ARCHITECTURAL METAL MANUFACTURERS; W W W.NAAMM.ORG. 61. NACE-NACE INTERNATIONAL (NATIONALASSOCIATION OF CORROSION ENGINEERS INTERNATIONAL�', WWW.NAC60RG. 62 NAIMA - NORTH AMERICAN INSIILATION MANUFACTURERS ASSOCIATION; W W W.NAIMA ORG. 63. NBG�A - NATIONAL BUILDING GRANITE QUARRIES ASSOCIATION, INC.; W W W.NBGQA.COM. 64. NCMA- NATIONAL CONCRETE MASONRV ASSOCIATION; W W W.NCMA.ORG. 65. NEBB - NATIONAL ENVIRONMENTAL BALANCING BUREAU; W W W NEBB.ORG. 66. NECA - NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION; W W W NECANET.ORG. 6�. NELMA - NORTHEASTERN LUMBER MANUFACTURERS ASSOCIATION; W W WNELMA.ORG. 68. NEMA - NATIONAL ELECTRICAL MANUFACTURERS ASSOQATION; W W W.NEMA.ORG. 69. NFPA - NFPA; (NATIONAL FIRE PROTECTION ASSOCIATION)�, W W W.NFPA.ORG. ]0. NFPA - NFPA INTERNATIONAL; (SEE NFPA). ]i. NFRC-NATIONAL FENESTRATION RATING COUNCIL; WWW NFRC ORG. 72. NHLA - NATIONAL HARDWOOD LUMBER ASSOCIATION; W W W.NHLA.COM. ]3. NLGA - NATIONAL LUMBER GRADES AUTHORITV; W W W.NLGA.ORG. ]4. NOFMA - NATIONAL OAK FLOORING MANUFACTURERS ASSOCIATION; (SEE NWFA). 75. NOMMA - NATIONAL ORNAMENTAL & MISCELLANEOUS METALS ASSOCIATION; W W W.NOMMA.ORG. ]6. NRCA - NATIONAL ROOFING CONTR4CTORS ASSOCIATION; W W W.NRCA.NET. 77. NTMA- NATIONAL TERRAZZO & MOSAIC ASSOCIATION, ING (THE)�, W W W.NTMA.COM. 18. N W FA - NATIONAL WOO� ROORING ASSOCIATION; W W W.N W FA.ORG. ]9. PCI - PRECAST/PRESTRESSED CONCRETE INSTITUTE; W W W.PCI ORG. 80. PDI - PLUMBING & DRAINAGE INSTITUTE: W W W.PDIONLINE.ORG. 81. RFq - RESILIEM FLOOR COVERING INSTITUTE; W W W RFCLCOM. 82 SAE - SAE INTERNATIONAL; (SOCIETV OF AUTOMOTIVE ENGINEERS); W W W.SAE.ORG. 83. SCTE - SOCIETV OF CABLE TELECOMMUNICATIONS ENGINEERS; W W W.SCTE.ORG. 84. SDI - STEEL DECK INSTITUTE; W W W.SDI.ORG. 85. SDI - STEEL DOOR INSTITUTE; W W W STEELDOOR.ORG. 86. SEFA - SQENTIFIC EQUIPMENT AND FURNITURE ASSOCIATION; W W W.SEFALABS.COM. 8�. SEIIASCE-STRUCTURAL ENGMEERING INSTITUTE/AMERICAN SOQETV OF CIVLL ENGMEERS; (SEE ASCE). 88. SIA - SEW RITV INDUSTRV ASSOCIATION; W W W.SIAONLME.ORG. 89. SJ I- STEEL JOIST INSTITUTE; W W W.STEELJOIST.ORG. 90. SMA - SCREEN MANUFACTURERS ASSOCIATION; W W W.SMAINFO.ORG. 91. SMACNA - SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION; W W W.SMACNA.ORG. 92 SPIB - SOUTHERN PINE INSPECTION BUREAU; W W W.SPIB.ORG. 93. SPRI - SINGLE PLV ROOFING INDUSTRV; W W W.SPRI.ORG. 94. SSINA- SPEQALTV STEEL IN�USTRV OF NORTH AMERICA; W W W.SSINA.COM. 95. SSPC - SSPC: THE SOCIETV FOR PROTECTIVE COATINGS; W W W.SSPGORG. 96. S W I- STEEL W INDOW INSTITUTE; W W W.STEELW INDOW S.COM. 9�. TCNA - TILE COUNCIL OF NORTH AMERICA, INC.; (FORMERLY: TILE COUNCIL OF AMERICA)�, W W W.TILEUSA.COM. 98. TMS - THE MASONRV SOCIETV; W W W.MASONRVSOCIETV.ORG. 99. TRI-TILE ROOFlNG INSTITUTE; (FORMERLV: NATIONALTILE ROOFlNG MANUFACTURWG ASSOCIATION); W W W TILEROOFING ORG. 100. UL-UNDERWRITERS LABORATORIES INC.; W WW.ULCOM. 107. USGBC-U.S. GREEN BUILDING COUNQL; WW W.USGBC.ORG. 102 WCLIB- WESTCOAST WMBER INSPECTION BUREAl1; WW W.WCLIB ORG. 103. WCMA- WINDOW COVERING MANUFACTURERS ASSOCIATION; W W W.WCMANET.ORG. 104. WDMA- WINDOW 8 DOOR MANUFACTURERS ASSOQATION', W W W.W DMA.COM. 105. WI- WOODWORK INSTITUTE; (FORMERLV: WIC- WOODWORK INSTITUTE OF CALIFORNIA)', W W W. W ICNET.ORG. RELEASEOFORCON$TRUCTION oFinwi°corPiRRcoRsnssocinnoN:'wwwwsRcaconn CTSASSOCIATION; WWW.WWPA.ORG. Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel ` � �un��V l�rcNal�=L. � DATE: OH�Z5 2O G CODE AGENCIES�. wHERE ABBREVIATIONS AND ACRONVMS ARE USED IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNIZED NAME OF THE ENTITIES IN THE FOLLOW ING LIST. THIS INFORMATION IS BELIEVED TO BE ACCURATE AS OF THE �ATE OF THE CONTRACTOOCUMENTS. 1. IAPMO - INTERNATIONAL ASSOQATION OF PLUMBING AND MECHANICAL OFFICIALS' WWW.IAPMODRG. 2. ICC - INTERNATIONAL CODE COUNCIL; W W W.ICCSAFE.ORG. 3. ICGES - ICC EVALUATION SERVICE, LLC; W W WJCGES.ORG. D. FEDER4L GOVERNMENT AGENCIES: W HERE ABBREVIATIONS AND ACRONYMS ARE USED IN SPEQRCATIONS OR OTHER CONTRACT DOCUMENTS, THEV SHALL MEAN THE RECOGNIZED NAME OF THE ENTITIES M THE FOLLOWING LIST. INFORMATION IS SUBJECT TO CHANGE AND IS UP-TO- DATE AS OF THE DATE OF THE CONTRACT DOCUMENTS. 1. DOE - DEPARTMENT OF ENERGV; W W W.ENERGV.GOV. 2 EPA - ENVIRONMENTAL PROTECTION AGENCV; W W W EPA.GOV. 3. FG - FEDERAL GOVERNMENT PUBLICATIONS; W W W.GPO.GOV. 4. GSA - GENERAL SERV ICES ADMINISTRATION; W W W.GSA.GOV. 5. OSHA - OCCUPATIONAL SAFETV & HEALTH ADMINISTRATION; W W W.OSHA.GOV. E. STANDARDS AND REGULATIONS: WHERE ABBREVIATIONS AND ACRONVMS ARE USED IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS. THEV SHALL MEAN THE RECOGNIZED NAME OF THE STANDARDS AND REGULATIONS IN THE FOLLOWING LIST. THIS INFORMATION IS SUBJECT TO CHANGE AND IS BELIEVED TO BE ACCURATE AS OF THE DATE OF THE CONTRACT DOCUMENTS. 1. CFR - CODE OF FEDERAL REGULATIONS; AVAILABLE FROM GOVERNMENT PRINTING OFFICE; W Ww.GPO.GOv/FOSVS. 2 FED-STD - FE�ERAL STANDARD', (SEE FS). 3. FS - FEOERAL SPECIRCATION; AVAILABLE FROM DEPARTMENT OF �EFENSE SINGLE STOCK POINT; HTTP�J/OOOSSP.DAPSDLA.MIL. 4. USAB - UNITED STATES ACCE55 BOARD; W W W.ACCE55-BOARD.GOV. 5. 11SATBCB - US. ARCHITECTUR4L 8 TR4NSPORTATION BARRIERS COMPLIANCE BOARD; (SEE USAB). F. STATE GOVERNMENT AGENCIES: W HERE ABBREVIATIONS AND ACRONVMS ARE USED IN SPECIRCATIONS OR OTHER CONTRACT OOCl1MENTS, THEV SHALL MEAN THE RECOGMZED NAME OF THE ENTITIES IN THE FOLLOW ING LIST. THIS MFORMATION IS SUBJECT TO CHANGE AND IS BELIEVED TO BE ACCURATE AS OF THE �ATE OF THE CONTRACT DOCUMENTS. 1. CBHF, STATE OF CALIFORNIA', DEPARTMENT OF CONSUMERAFFAIRS; BIIREAU OF ELECTRONIC APPLIANCE AND REPAIR, HOME FURNISHINGS AND THERMAL INSULATION'. W W W BEARHFTLCA.GOV. 2 CCR; CALIFORNIA CODE OF REGULATIONS; OFFICE OF ADMINISTRATIVE LAW; CALIFORNIA TITLE 24 ENERGVCODE;WWW.CALREGSCOM. 3. CDHS; CALIPoRNIA DEPARTMENT OF HEALTH SERVICES; (SEE CDPH). 4. CDPH; CALIFORNIA DEPARTMENT OF PUBLIC HEALTH; INDOOR AIR QUALITY PROGRAM; W W W.CAL-IAQ.ORG. 5. CPUq CALIFORNIA PUBLIC UTILITIES COMMISSION; W W W.CPUGCA.GOV. 6. SCApMO; SOUTH COAST AIR QUALITV MANAGEMENT �ISTRICT; W W W ApMD.GOV. 7. TFS; TExAS FOREST SERVICE; FOREST RESOURCE DEVELOPMENT AND SUSTAINABLE FORESTRY; HTTP:/lTXFORESTSERVICETAMLLEDU. PART 2 - PRODlICTS (NOT USED) PART 3 � EXECIITION (NOT USED) PART1-GENERAL 1.1 RELATED DOCUMENTS A. DRAW INGS AN� GENERAL PROVISIONS OF THE CONTRACT, INC W DING GENERAL AND SUPPLEMENTARY CONDITIONS AND OTHER DIVISION 01 SPEGFICATION SECTIONS, APPLV TO THIS SECTION. 12SUMMARV A. SECTION INCLUDES GENERAL A�MINISTRATNE AND PROCEDURAL REQUIREMENTS GOVERNING EXECUTION OF THE WORK INCWDING, BUT NOT LIMITED TO, THE FOLLOW ING: 1. CONSTRUCTION LAYOUT. 2. FlELD ENGMEERING AND SURVEYING. 3. INSTALLATION OF THE WORK. 4. COORDINATION OF OWNER-INSTALLED PRODUCTS. 5. PROGRESS 0.EANING. 6. STARTING AND A�JUSTING. ]. PROTECTION OF INSTALLED CONSTRUCTION. B.RELATED REQUIREMENTS: 1. SECTION 011000 "SUMMARV" FOR LIMITS ON USE OF PROJECT SITE. 2 SECTION 013300 "SUBMITTAL PROCEDURES" FOR SUBMRTING SURVEVS. 3. SECTION 01�]00 "CLOSEOUT PROCE�URES" FOR SUBMITTING FINAL PROPERTV SURVEV W ITH PROJECT RECORD DOCUMENTS, RECORDING OF OW NER ACCEPTED DEVIATIONS FROM INDICATED LWES AND LEVELS. AND RNAL QEANING. 4. SECTION 024119 "SELECTNE DEMOLITION" FOR DEMOLITION AND REMOVAL OF SELECTED PORTIONS OF THE BUILDING. S. SECTION O]8413 "PENETR4TION FIRESTOPPING" FOR PATCHING PENETR4TIONS IN FIRE-RATED CONSTRUCTION. PARTI�PRODUGTS 21 MATERIALS A. GENER4C COMPLY WITH REQUIREMENTS SPEqRED IN OTHER SECTIONS. L FOR PROJECTS REQUIRING COMPLIANCE W ITH SUSTAINABLE DESIGN AND CONSTRUCTION PRACTICES AND PROCEDURES, USE PRODUCTS FOR PATCHING THAT COMPLV WITH REQUIREMENTS IN SECTION 018113.13 "SUSTAINABLE DESIGN REQUIREMENTS-LEED FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS," SECTION 018113.ifi "SUSTAINABLE DESIGN REQUIREMENTS - LEED FOR COMMERCIAL INTERIORS," SECTION 018113.19 "SUSTAINABLE DESIGN REQUIREMENTS - LEED FOR CORE AND SHELL DEVELOPMENT,' AND SECTION 0181132F "SUSTAINABLE DESIGN REQUIREMENTS - LEED FOR SCHOOLS " B. IN-PLACE MATERIALS: 11SE MATERIALS FOR PATCHING IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED SURFACES, USE MATERIALS THAT VISUALLV MATCH IN-PLACE ADJACENT SURFACES TO THE FULLEST EXTENT POSSIBLE. 1. IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS THAT, WHEN INSTALLED, WILL PROVIDE A MATCH ACCEPTABLE TO ARCHITECT FOR THE VISUAL AND FUNCTIONAL PERFORMANCE OF IN-PLACE MATERIALS. PART 3 - EXECUTION 3.1 EXAMINATION A EXISTING CONDITIONS: THE EXISTENCE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES AND CONSTRUCTION INOICATED AS EXISTING ARE NOT GUARANTEED. BEFORE BEGINNING SITEWORK, INVESTIGATE AND VERIFV THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES, MECHANICAL AND ELECTRICAL SVSTEMS, AND OTHER CONSTRUCTION AFFECTING THE WORK. 1. BEFORE CONSTRUCTION. VERIFY THE LOCATION AND INVERT ELEVATION AT POINTS OF CONNECTION OF SANITARV SEWER, STORM SEWER, AND WATERSERVICE PIPING; UNDERGROl1N� ELECTRICAL SERVICES, AND OTHER UTILITIES. 2. FURNISH LOCATION �ATA FOR WORK RELATED TO PROJECT THAT MUST BE PERFORMED BV PUBLIC UTILITIES SERVING PROJECT SITE. B. E%AMINATION ANO ACCEPTANCE OF CONDITIONS: BEFORE PROCEED WG WITH EACH COMPONENT OF THE WORK, EXAM WE SUeSTRATES, AREAS, AND CONDITIONS, W ITH INSTALLER OR APPLICATOR PRESENT WHERE IN�ICATED, FOR COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION TOLERANCES AND OTHER CONOITIONS AFFECTING PERFORMANCE. RECORD OBSERVATIONS. 1. EXAMINE ROUGH ING-M FOR MECHANICAL AND ELECTRICAL SVSTEMS TO VERIFV ACTUAL LOCATIONS OF CONNECTIONS BEFORE EQUIPMENT AN� RXTURE INSTALLATION. 2 EXAMINE WALLS, FLOORS, AND ROOFS FOR SUITABLE CONDITIONS WHERE PRODUCTS AND SVSTEMS ARE TO BE INSTALLED. 3. VERIFV COMPATIBILITV W ITH AND SUITABILITV OF SUBSTRATES, INCLUDING COMPATIBILITV W ITH EXISTING FINISHES OR PRIMERS. C. PROCEEo W ITH INSTALLATION ONLV AFTER UNSATISFACTORV CONDITIONS HAVE BEEN CORRECTED. PROCEEDING WITH THE WORK INDICATES ACCEPTANCE OF SURFACES AND CONDITIONS. 32 PREPARATION A EXISTING UTILITY W FORMATION�. FURNISH WFORMATION TO OWNER THAT IS NECESSARV TO ADJl15T, MOVE, OR RELOCATE EXISTING UTILITY STRUCTURES, UTILITV POLE$ LINES, SERVICES, OR OTHER UTILITV APPURTENANCES LOCATED IN OR AFFECTED BV CONSTRUCTION. COORDINATE WITH AUTHORITIES HAVING JURIS�ICTION. B. FIELO MEASl1REMENTS TAKE FlELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLV. RECHECK MEASUREMENTS BEFORE INSTALLING EACH PRODUCT. WHERE PORTIONS OF THE WORK ARE INDICATED TO RT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER CONSTRUCTION BV FIELD MEASUREMENTS BEFORE FABRICATION. COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID OELAVING THE WORK. G SPACE REQUIREMENTS'. VERIFV SPACE REQUIREMENTS AND DIMENSIONS OF ITEMS SHOWN �IAGRAMMATICALLV ON �RAWINGS. D. REVIEW OF CONTRACT DOCUMENTS AND RELD CONDITIONS�. IMMEDIATELV ON DISCOVERV OF THE NEED FOR CLARIFICATION OF THE CONTRACT DOCUMENTS CAUSE� BV �IFFERING FlELD CONOITIONS OUTSIDE THE CONTROL OF CONTRACTOR, SUBMITA REpUEST FOR WFORMATION TO ARCHITECT ACCORDING TO REQUIREMENTS IN SECTION 013100 "PROJECT MANAGEMENT AND COORDINATION" 33 CONSTRUCTION LAVOl1T A. VERIFlCATION: BEFORE PROCEEDING TO LAV OUTTHE WORK, vERIFV LAVOUT WFORMATION SHOWN ON DRAWINGS, IN RELATION TO THE PROPERTV SURVEYAND EXISTING BENCHMARKS. IF OISCREPANQES ARE DISCOVERED, NOTIFV ARCHITECT PROMPTLV. B. SITE IMPROVEMENTS LOCATE AND LAY OUT SITE IMPROVEMENTS, INCLU�ING PAVEMENTS, GRADING, RLL AND TOPSOIL PLACEMENT, UTILITY SLOPES, AND RIM AND INVERT ELEVATIONS. C. BUILOING LINES ANO LEVELS LOCATE AND LAV OUT CONTROL LINES AND LEVELS FOR STRUCTURES, BUILDING FOUNDATIONS, COLUMN GRIDS, AND FLOOR LEVELS, INCLUDING THOSE REQUIRED FOR MECHANICAL AND ELECTRICAL W ORK. TRANSFER SURVEY MARKINGS AND ELEVATIONS FOR USE W ITH CONTROL LINES AND LEVELS LEVEL FOUNDATIONS AND PIERS FROM TW O OR MORE LOCATIONS. 3A FlELD ENG W EERING A. IOENTIFICATION:OWNER WILL IDENTIFV EXISTING BENCHMARKS, CONTROL POINTS, AND PROPERTV CORNERS B. REFERENCE POINTS: LOCATE EXISTING PERMANENT BENCHMARKS, CONTROL POINTS, AND SIMILAR REFERENCE POINTS BEFORE BEGINNING THE WORK. PRESERVE AND PROTECT PERMANENT BENCHMARKS AND CONTROL POINTS DURING CONSTRUCTION OPERATIONS. 3.S INSTALLATION A. GENERAL LOCATE THE W ORK AND COMPONENTS OF THE W ORK ACCURATELY, IN CORRECT ALIGNMENT AND ELEVATION, AS INDICATED. 1. MAKE VERTICAL WORK PWMB AND MAKE HORIZONTAL WORK LEVEL. 2 W HERE SPACE IS LIMITEO, INSTALL COMPONENTS TO MAXIMIZE SPACE AVAILABLE FOR MAINTENANCE AND EASE OF REMOVAL FOR REPLACEMENT. 3. CONCEAL PIPES, DUCTS, AND W IRING IN FINISHED AREAS UNLESS OTHERW ISE INDICATED. 4. MAINTAIN MINIMUM HEAOROOM CLEARANCE OF 96 INCHES (2440 MM) IN OCCUPIED SPACES ANO 901NCHES (2300 MM) IN UNOCCUPIED SPACES. B. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AN� RECOMMENDATIONS FOR INSTALLING PROOUCTS IN APPLICATIONS IN�ICATEO. C. INSTALL PRODUCTS AT THE TIME AND UNDER CONDITIONS THAT W ILL ENSURE THE BEST POSSIBLE RESULTS. MAINTAIN CONDITIONS REQUIRED FOR PRODUCT PERFORMANCE UNTIL SUBSTANTIAL COMPLETION. D. CONDUCT CONSTRUCTION OPERATIONS SO NO PART OF THE WORK IS SUBJECTED TO DAMAGING OPERATIONS OR LOADING W EXCESS OF THAT EXPECTED DURWG NORMAL CONDITIONS OF OCCUPANCV. E. SEQUENCE THE WORK AND ALLOW ADEQUATE CLEARANCES TO ACCOMMODATE MOVEMENT OF CONSTRUCTION ITEMS ON SITE AND PLACEMENT IN PERMANENT LOCATIONS. F. TOOLS AND EOl11PMENT: 00 NOT USE TWLS OR EQUIPMENT THAT PRODUCE HARMFl1L NOISE LEVELS G. TEMPLATES: OBTAIN AND DISTRIBUTE TO THE PARTIES INVOLVED TEMPLATES FOR WORK SPEGREC TO BE FACTORV PREPARED AND FIELD INSTALLED. CHECK SHOP DRAWINGS OF OTHER WORK TO CONFIRM THAT ADEQUATE PROVISIONS ARE MADE FOR LOCATWG AND INSTALLING PRODUCTS TO COMPLV WITH INDICATED REQUIREMENTS. SECTION 017300- EXECUTION (CONT.) H. ATTACHMENT: PROVIDE BLOCKING AND ATTACHMENT PLATES AND ANCHORS AND FASTENERS OF ADEQUATE SRE AND NUMBER TO SECURELV ANCHOR EACH COMPONENT IN PLACE, ACCURATELV LOCATED AND ALIGNED W ITH OTHER PORTIONS OF THE W ORK. W HERE SRE AND TVPE OF ATTACHMENTS ARE NOT INDICATED VERIFV SIZE AN� TVPE REQl11RED FOR LOAD CONDITIONS. 1. MOUNTING HEIGHTS: WHERE MOUNTING HEIGHTS ARE NOT INDICATED, MOUNT COMPONENTS AT HEIGHTS DIRECTED BV ARCHITECT. 2. ALLOW FOR BUILDING MOVEMENT, INCLUDING THERMAL EXPANSION AND CONTRACTION. 3. COOR�INATE INSTALLATION OF ANCHORAGES. FURNISH SETTING DRAW WGS, TEMPLATES, AND DIRECTIONS FOR INSTALLING ANCHORAGES, INCLUOING SLEEVES, CONCRETE INSERTS, ANCHOR BOLTS, AND ITEMS W ITH INTEGRAL ANCHORS, THAT ARE TO BE EMBEDDED IN CONCRETE OR MASONRY. DELIVER SUCH ITEMS TO PROJECT SITE IN TIME FOR INSTALL4TION. I. JOINTS'. MAKE JOINTS OF UNIFORM W IOTH. WHERE JOIM LOCATIONS IN EXPOSEO WORK ARE NOT INDICATED, ARRANGE JOINTS FOR THE BEST VISUAL EFFECT. FIT EXPOSED CONNECTIONS TOGETHER TO FORM HAIRLME JOINTS. J. HAZARDOUS MATERIALS: USE PRODUCTS, CLEANERS, AND INSTALLATION MATERIALS THAT ARE NOT CONSIDERED HA7ARDOUS. K. CLEANING: CLEAN AREAS AND SPACES W HERE CUTTING AND PATCHING ARE PERFORMEO. REMOVE PAINT, MORTAR, OILS, PUTTV, AND SIMILAR MATERIALS FROM ADJACENT FINISHE� SURFACES. 3.60WNER-INSTALLED PRODUCTS A. SITE ACCE55: PROVIDE ACCE55 TO PROJECT SITE FOR OW NER'S CONSTRUCTION PERSONNEL. B. COORDINATION: COORDINATE CONSTRUCTION AN� OPERATIONS OF THE WORK W ITH WORK PERFORMED BV OWNER'S CONSTRUCTION PERSONNEL. 1. CONSTRUCTION SCHEDULE'. INFORM OWNER OF CONTRACTOR'S PREFERRED CONSTRUCTION SCHEDULE FOR OWNER'S PORTION OF THE WORK. ADJUST CONSTRUCTION SCHEDULE BASED ON A MUTUALLV AGREEABLE TIMETABLE NOTIFV OWNER IF CHANGES TO SCHEDULE ARE REOUIRED DUE TO DIFFERENCES IN ACTUAL CONSTRUCTION PROGRE55. 37 PROGRESS CLEANING A. GENERAL�. CLEAN PROJECT SITE ANo WORK AREAS DAILV, INCLUDING COMMON AREAS. ENFORCE REOUIREMENTS STRICTLV. DISPOSE OF MATERIALS LAWFULLY. B. WORK AREAS: CLEAN AREAS W HERE WORK IS IN PROGRESS TO THE LEVEL OF CLEANLWESS NECESSARV FOR PROPER EXECUTION OF THE WORK. C. INSTALLED WORK'. KEEP INSTALLEO WORK CLEAN. CLEAN INSTALLED SURFACES ACCORDING TO WRITTEN MSTRUCTIONS OF MANl1FACTURER OR FABRICATOR OF PRODUCT INSTALLED, USING ONLV CLEANING MATERIALS SPEQRCALLY RECOMMENDED. IF SPEGFlC 0.EANING MATERIALS ARE NOT RECOMMENDED, USE CLEANING MATERIALS THAT ARE NOT HAZARDOUS TO HEALTH OR PROPERTV AND THAT WILL NOT DAMAGE EXPOSE� SURFACES. D. CONCEALED SPACES: REMOVE DEBRIS FROM CONCEALED SPACES BEFORE ENCLOSING THE SPACE. EXPOSE� SURFACES IN FINISHED AREAS: CLEAN EXPOSE� SURFACES AN� PROTECT AS NECESSARV TO ENSURE FREEDOM FROM DAMAGE AND DETERIORATION AT TIME OF SUBSTANTIAL COMPLETION. E. WASTE DISPOSAL'. COMPLY WITH LOCAL GREEN BUILDING ORDINANCE WRITTEN REOUIREMENTS. F. DURING HANDLING AND INSTALLATION, CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINMG MATERIALS ALREADV IN PLACE. APPLV PROTECTNE COVERING WHERE REQUIRED TO ENSURE PROTECTION FROM DAMAGE OR DETERIORATION AT SUBSTANTIAL COMPLETION. CLEAN AND PROVI�E MAINTENANCE ON COMPLETED CONSTRl1CTION AS FRE�UENTLV AS NECESSARV THROUGH THE REMAINDER OF THE CONSTRUCTION PERIOo. AOJUST AND LUBRICATE OPERABLE COMPONENTSTO ENSURE OPERABILITV WITHOUT DAMAGING EFFECTS. G. LIMITING EXPOSURES: SUPERVISE CONSTRUCTION OPERATIONS TO ASSl1RE THAT NO PART OF THE CONSTRUCTION, COMPLETED OR IN PROGRESS, IS SUBJECT TO HARMFUL, oANGEROUS. DAMAGING, OR OTHERWISE DELETERIOl15 EXPOSURE DURING THE CONSTRUCTION PERIOD. 3.8 STARTING AND A�JUSTING A. START EQUIPMENT AND OPERATING COMPONENTS TO CONRRM PROPER OPERATION. REMOVE MALFUNCTIONING UNITS, REPLACE WITH NEW UNITS, AND RETEST. ADJUST EpUIPMENT FOR PROPER OPERATION. ADJUST OPERATING COMPONENTS FOR PROPER OPERATION W ITHOUT BIN�ING. TEST EACH PIECE OF EQUIPMENT TO VERIFV PROPER OPERATION. TEST AND ADJUST CONTROLS ANO SAFETIES. REPLACE OAMAGEO AND MALFUNCTIONING CONTROLS ANO EQUIPMENT. 3.9 PROTECTION OF INSTALLED CONSTRUCTION A. PROVIDE FlNAL PROTECTION AND MAINTAIN CON�ITIONS THAT ENSURE INSTALLED WORK IS W ITHOUT DAMAGE OR DETERIORATION AT TIME OF SUBSTANTIAL COMPLETION. COMPLV W ITH MANUFACTURER'S WRITTEN INSTRUCTIONS FORTEMPERATUREAND RELATNE HUMIDITY. SECTION 017329 - CUTTING AND PATCHING PART1-GENERAL 1.iRELATEDDOCUMENTS A. DRAW INGS AND GENERAL PROVISIONS OF THE CONTRACT, INC W DING GENERAL ANO SUPPLEMENTARV CON�ITIONS AND OTHER �IVISION 1 SPECIFICATION SECTIONS, APPLV TO THIS SECTION. 125UMMARV A. THIS SECTION INCLUDES PROCEDURAL RE�UIREMENTS FOR CUTTMG AND PATCHING. B. RELATED SECTIONS INCLUDE THE FOLLOWING: 1. DIVISION 1 SECTION "SELECTNE DEMOLITION" FOR OEMOLITION OF SELECTED PORTIONS OF THE BUILDING. 2. �IVISIONS 2 THROUGH 33 SECTIONS FOR SPEGFlC REQUIREMENTS AND LIMITATIONS APPLICABLE TO Cl1TTING AND PATCHING INDIVIOUAL PARTS OF THE WORK. 3. DIVISION 7 SECTION "THROUGH-PENETRATION FIRESTOP SVSTEMS" FOR PATCHING FIRE-RATED CONSTRUCTION. 1.3 �EFINITIONS A. CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION NECESSARV TO PERMIT INSTALLATION OR PERFORMANCE OF OTHER WORK. PATCHING FlTTWG AND REPAIR WORK RE�UIRED TO RESTORE SURFACES TO ORIGINAL CONDITIONS AFTER W STALLATION OF OTHER W ORK. 1 4 SUBMITTALS A. CUTTING AN� PATCHING PROPOSAL: SUBMIT A PROPOSAL DESCRIBING PROCEDURES BEFORE THE TIME CUTTING AND PATCHING WILL BE PERFORMEO, REQUESTING APPROVALTO PROCEED. INCLU�E THE FOLLOWING MFORMATION: L EXTENT�. DESCRIBE CUTTING AND PATCHING, SHOW HOW THEV WILL BE PERFORMED, AND INDICATE W HV THEV CANNOT BE AVOIDED. 2. CHANGES TO IN-PLACE CONSTRUCTION: DESCRIBE ANTICIPATED RESULTS. INCLUDE CHANGES TO STRUCTURAL ELEMENTS AND OPERATING COMPONENTS AS WELL AS CHANGES IN BUILDING'S APPEARANCE AND OTHER SIGNIRCANT VISUAL ELEMENTS. 3. PRODUCTS: LIST PRO�UCTS TO BE USED AND FIRMS OR ENTITIES THAT WILL PERFORM THE WORK. 4. DATES: INDICATE W HEN CUTTING AND PATCHING WILL BE PERFORMED. 5. UTILITV SERVICES AND MECHANICAVELECTRICAL SVSTEMS: LIST SERVICES/SVSTEMS THAT CUTTING AND PATCH W G PROCEDURES W ILL DISTURB OR AFFECT. LIST SERVICES/SVSTEMS THAT W ILL BE RELOCATED AND THOSE THAT W ILL BE TEMPORARILY OUT OF SERVICE. INDICATE HOW LONG SERVICES/SVSTEMS WILL BE DISRUPTED. 6. STRUCTURAL ELEMENTS�. WHERE CUTTMG AND PATCHING INVOLVE ADDING REMFORCEMENT TO STRUCTURAL ELEMENTS, Sl16MIT �ETAILS AND ENGINEERING CALCULATIONS SHO W ING INTEGRATION OF REINFORCEMENT W ITH ORIGINAL STRUCTURE. 7.S QUALITY ASSUR4NCE A. STRl1CTl1RAL ELEMENTS: DO NOT CUT AN� PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR LOA�-CARRVING CAPACITV OR LOAD DEFLECTION RATIO. B. OPERATIONAL ELEMENTS: DO NOT CUT AN� PATCH OPERATWG ELEMENTS AN� RELATED COMPONENTS IN A MANNER THAT RESULTS IN RE�UCING THEIR CAPACITV TO PERFORM AS INTENDE� OR THAT RESULTS IN INCREASED MAINTENANCE OR �ECREASED OPERATIONAL LIFE OR SAFETV. 1. PRIMARV OPERATIONAL SVSTEMSAND EQl11PMENT. 2. AIR OR SMOKE BARRIERS. 3. RRESUPPRESSION SVSTEMS. 4. MECHANICAL SVSTEMS PIPING AND DUCTS. S.CONTROLSVSTEMS. fi. COMMUNICATION SVSTEMS. ]. WNVEVING SYSTEMS. 8. ELECTRICAL W IRING SVSTEMS. G MISCELLANEOUS ELEMENTS'. DO NOTCUTAND PATCH MISCELLANEOUS ELEMENTS OR RELATED COMPONENTS IN A MANNER THAT COULO CHANGE THEIR LOADCARRVING CAPACITV, THAT RESULTS IN REDUCING THEIR CAPACITV TO PERFORM AS INTENDED, OR THAT RESULTS IN INCREASED MAIMENANCE OR DECREASED OPERATIONAL LIFE OR SAFETV. MISCELLANEOUS ELEMENTS WCWDE THE FOLLOWING: 1. WATER, MOISTURE.OR VAPOR BARRIERS. 2. MEMBRANES AND FLASHINGS. 3. EXTERIOR CURTAIN-WALL CONSTRUCTION. 4. EQUIPMENT SUPPORTS. 5. PIPING, DUCTWORK, VESSELS. AND E�UIPMENT. 6. NOISE- AND VIBRATION-CONTROL ELEMENTS AND SYSTEMS. D. VISUAL REQUIREMENTS'. DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF CUTTING AND PATCHING. DO NOT CUT AND PATCH CONSTRUCTION EXPOSEO ON THE EXTERIOR OR IN OCCUPIEO SPACES IN A MANNER THAT WOULD, IN ARCHITECT'S OPINION, REDUCE THE BUIL�INGS AESTHETIC QUALITIES. REMOVE AND REPLACE CONSTRUCTION THAT HAS BEEN CUT AND PATCHED IN A VISUALLV UNSATISFACTORY MANNER. 1.6 WARRANTY A EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGE� DURING CUTTING AND PATCHING OPERATIONS, BYMETH0�5 AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES. PART2-PRODUGTS 2.1 MATERIALS A. GENERAC COMPLV W ITH REQUIREMENTS SPEqFIED IN OTHER SECTIONS. B. IN-PLACE MATERIALS�. USE MATERIALS IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED SURFACES, USE MATERIALS THAT VISUALLV MATCH IN-PLACE ADJACENT SURFACES TO THE FULLEST E%TENT POSSBLE IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USE�, USE MATERIALS THAT, WHEN INSTALLED. W ILL MATCH THE VISUAL AND FUNCTIONAL PERFORMANCE OF IN-PLACE MATERIALS. PART 3 - E%ECUTION 3.1 EXAMINATION A EXAMME SURFACES TO BE CUT AND PATCHED AND CON�ITIONS UNDER WHICH CUTTING AND PATCHING ARE TO BE PERFORMED. COMPATIBILITV: BEFORE PATCHING, VERIFY COMPATIBILITV W ITH AND SUITABILITV OF SUBSTRATES, INCWDING COMPATIBILITV WITH IN-PLACE FlNISHES OR PRIMERS. PROCEED W ITH INSTALLATION ONLV AFTER UNSAFE OR UNSATISFACTORY CONDITIONS HAVEBEENCORRECTED. 32 PREPARATION A. TEMPORARY SUPPORT: PROVIOE TEMPORARV SUPPORT OF W ORK TO BE CUT. PROTECTION: PROTECT IN-PLACE CONSTRUCTION DURWG CUTTING AND PATCHING TO PREVENT DAMAGE. PROVIDE PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS OF PROJECT THAT MIGHT BE EXPOSED DURING CUTTING AND PATCHING OPERATIONS. B. ADJOINING AREAS: AVOID INTERFERENCE W ITH USE OF ADJOINING AREAS OR INTERRUPTION OF FREE PASSAGE TO ADJOINING AREAS EXISTING UTILITV SERVICES AND MECHANICALIELECTRICAL SVSTEMS WHERE EXISTING SERVICES/SVSTEMS ARE REpl11RE� TO BE REMOVED, RELOCATED, OR ABANDONED, BVPASS SUCH SERVICES/SVSTEMS BEFORE CUTTING TO PREVENT INTERRUPTION TO OCCUPIE� AREAS. 3.3PERFORMANCE A. GENERAL EMPLOV SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH CUTTING AND PATCHING AT THE EARLIEST FEASIBLE TIME, AND COMPLETE W ITHOUT DELAV. 1. CUT IN-PLACE CONSTRUCTION TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR PERFORMANCE OF OTHER CONSTRUCTION, AND SU85EQUENTLV PATCH AS REQUIRE� TO RESTORE SURFACES TO THEIR ORIGINAL CONDITION. SECTION 017329 - CUTTING AND PATCHING (CONT.) B. CUTTWG CUT IN-PLACE CONSTRUCTION BV SAWING, DRILLING, BREAKING, CHIPPING, GRINDWG, AN� SIMILAR OPERATIONS. INCWDING EXCAVATION, USING METHODS LEAST LIKELV TO �AMAGE ELEMENTS RETAWE� OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW PROPOSED PROCEDURES WITH ORIGINAL MSTALLER' COMPLY WITH ORIGINAL INSTALLER'S WRITTEN RECOMMEN�ATIONS. 1. IN GENERAL, USE HAND OR SMALL POW ER TOOLS DESIGNED FOR SAWING AND GRINDING, NOT HAMMERING AND CHOPPING. CUT HOLES AND SLOTS AS SMALL AS POSSIBLE NEATLV TO SIZE REpUIRED, ANO W ITH MINIMUM DISTURBANCE OF ADJACENT SURFACES. TEMPORARILV COVER OPENINGS W HEN NOT IN USE. 2 FlNISHED SURFACES: CUT OR DRILL FROM THE EXPOSE� OR RNISHED SIDE INTO CONCEALED SURFACES. 3. CONCRETE AND MASONRV: CUT USING A CUTTING MACHINE, SUCH AS AN ABRASIVE SAW OR A DIAMOND-CORE DRILL. 4. MECHANICAL AND ELECTRICAL SERVICES: CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE REMOVEo. CAP, vALVE, OR PLUG AND SEAL REMAINING PORTION OF PIPE OR CONDUIT TO PREVENT ENTRANCE OF MOISTURE OR OTHER FOREIGN MATTER AFTER CUTTING. 5. PROCEEO WITH PATCHING AFTER CONSTRUCTION OPERATIONS REQUIRING CUTTING ARE COMPLETE. Q PATCHING: PATCH CONSTRUCTION BV FlLLING, REPAIRING, REFlNISHING, CLOSING UP, AND SIMILAR OPERATIONS FOLLOWING PERFORMANCE OF OTHER WORK. PATCH W ITH OIIRABLE SEAMS THAT AREAS INVISIeLE AS POSSIBLE. PROVIDE MATERIALS AND COMPLV WITH INSTALLATION REQUIREMENTS SPEQFlED IN OTHER SECTIONS. 1. INSPECTION�. W HERE FEASIBLE, TEST AND INSPECT PATCHE� AREAS AFTER COMPLETION TO DEMONSTRATE INTEGRITV OF INSTALLATION. 2 EXPOSED FlNISHES'. RESTORE EXPOSED RNISHES OF PATCHEDAREAS AND EXTEND RNISH RESTORATION MTO RETAW ED ADJOINING CONSTRUCTION IN A MANNER THAT W ILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. A. CLEAN PIPING. CONDUIT, AND SIMILAR FEATURES BEFORE APPLVING PAINT OR OTHER RNISHING MATERIALS. e. RESTORE �AMAGED PIPE COVERING TO ITS ORIGINALCONDITION. 3. FLOORS AN� WALLS'. W HERE WALLS OR PARTITIONS THAT ARE REMOVED EXTEND ONE FINISHED AREA INTO ANOTHER, PATCH AND REPAIR FLOORAND WALL SURFACES W THE NEW SPACE. PROVIOE AN EVEN SURFACE OF UNIFORM FINISH, COLOR, TEXTURE, AND APPEARANCE. REMOVE IN-PLACE FLOORAND WALL COVERINGS AND REPLACE WITH NEW MATERIALS, IF NECESSARV, TO ACHIEVE UNIFORM COLOR AND APPEARANCE. A. WHERE PATCHWG OCCURS IN A PAINTED SURFACE, APPLV PRIMER AND INTERMEDIATE PAINT COATS OVER THE PATCH AND APPLV FlNAL PAINT COAT OVER ENTIRE UNBROKEN SURFACE CONTAINING THE PATCH. PROVIDE ADDITIONAL COATS UNTIL PATCH BLENDS W ITH ADJACENT SURFACES. 4. CEILWGS: PATCH, REPAIR, OR REHANG IN-PLACE CEILMGS AS NECESSARV TO PROVIDE AN EVEN-PLANE SURFACE OF UNIFORM APPEARANCE. 5. EXTERIOR BUILDING ENCLOSURE PATCH COMPONENTS IN A MANNER THAT RESTORES ENCLOSURE TO A WEATHERTIGHT CONDITION. D. CLEANING: CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMEO. COMPLETELV REMOVE PAINT, MORTAR, OILS, PUTTV, AND SIMILAR MATERIALS. � � / ♦ 1 � INDUSTRIOUS COWORKING 880 W MONON GREEN BLVD CARMEL, IN 46032 OWNEPRENANT INDUSTRIOUS 215PARKAVES,4E1300 NEW YORK, NY 1 W03 ARCXITECT OF HECOPD NORX 325 N LASALLE Si- SOIiE SCO CHICAGO. IL 60654 PEiER.DUBWCmNORR-COM 312-0242400 MEP ENGINEER MEENGINEERS 29 WEST 38iH SiREEi, SiH FLOOR NEW YORK. NY 10018 CONiACi: BRIAN SHASSIAN BBIANSHASSIANC�.ME-ENGINEER$_COM JOHN HIGGINS JOHN.HIGGWS(�MEENGINEERS.COM �212J 44]-6]]0 PHONE LIGHTING DESIGNER REGENCY 9261 JOkDAN AVE CHAiSWORiH, CA 800-28d-202J ISSUE DATES REV. DAiE DESCRIPiION 06/OS/2020 DD3 06/18l2020 CDvI 0]/06/2020 CDv2 O]/V/2020 100%/PERMIT SEAL&SIGNATUNE BY CHECK BG PJ BC PJ eC Po BC PJ CARMEL CITY- 880 MONON GREEN PRQIECT NUMBER IND680MON DRAWING TITLE SPECIFlCATIONS SCALE � � �Zii _ , i oii SHEET NUMBER A-901 oF PROJECTNAME