Loading...
HomeMy WebLinkAboutA902 SpecsSECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART7-GENERAL 1.iRELATEDDOCUMENTS A.DRAWINGSANDGENERALPROVISIONSOFTHECONTRACT INCLUDINGGENERALAND SUPPLEMENTARY CONDITIONS AND OTHER DIVISION 01 SPECIFICATION SECTIONS APPLV TO THIS SECTION. 1.25UMMARV A. SECTION INCLUDES ADMINISTRATIVE AND PROCE�URAL RE�UIREMENTS FOR THE FOLLOWING: 1. SALVAGING NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE. 2. RECVCLING NONHAZARDOUS OEMOLITION AND CONSTRUCTION WASTE. 3. DISPOSWG OF NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE. B. REL4TED REQUIREMENTS�. 1. SECTION 024119 "SELECTNE DEMOLITION" FOR DISPOSITION OF WASTE RESULTING FROM PARTIAL DEMOLITION OF BUILDINGS, STRUCTURES, AND SITE IMPROVEMENTS, AND FOR DISPOSITION OF HAZARDOUS WASTE. 2 SECTION 042000 "UNIT MASONRY" FOR DISPOSAL REpl11REMENTS FOR MASONRV WASTE. 1.3 DEFINITIONS A. CONSTRUCTION W ASTE: BUILDING AND SITE IMPROVEMENT MATERIALS AND OTHER SOLID WASTE RESl1LTING FROM CONSTRUCTION, REMO�ELING, RENOVATION, OR REPAIR OPERATIONS. CONSTRUCTION WASTEINCWDESPACKAGING. B. �EMOLITION WASTE�. BUILDING AND SITE IMPROVEMENT MATERIALS RESULTING FROM �EMOLITION OR SELECTNE DEMOLITION OPERATIONS. C. DISPOSAL REMOVAL OFF-SITE OF DEMOLITION AND CONSTRUCTION WASTE AND SUBSEQUENT SALE, RECVCLING, REUSE OR DEPOSIT IN LANDFILL OR INCMERATOR ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION. D. RECVCLE: RECOVERV OF DEMOLITION OR CONSTRUCTION WASTE FOR SUBSEQUENT PROCESSMG IN PREPARATION FOR REUSE. E SALVAGE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE AND SUBSEpUENT SALE OR REUSE IN ANOTHER FACILITV. E SAWAGE AND REUSE RECOVERV OF DEMOLITION OR CONSTRUCTION WASTE AND SUBSEQUENT INCORPORATION INTO THE WORK. 1.4PERFORMANCEREQUIREMENTS A. GENERAL: PRACTICE EFFlCIENT WASTE MANAGEMENT IN THE USE OF MATERIALS IN THE COURSE OF THE WORK. USE ALL REASONABLE MEANS TO OIVERT CONSTRUCTION ANO OEMOLITION WASTE FROM L4NDFILLS AND INCINERATORS. FACILITATE RECVCLING AND SALVAGE OF MATERIALS. 1. DEMOLITION WASTE: A. ASPHALT PAVING. B.CONCRETE. Q WNCRETE REWFORCWG STEEL. D. BRICK. E. CONCRETE MASONRV UNITS. E WOODSTUDS. G. WOOD JOISTS. H. PLVWOODAND ORIENTE� STRAND BOARD. I. WOOD PANELING. J. W 00� TRIM. K. STRUCTURALAND MISCELLANEOUS STEEL. L ROUGH HARDWARE. M. ROOFING. N. INSUL4TION. O. DOORS AND FRAMES. P.DOORHARDWARE. Q. WIN�OWS. R.GLAZING. S.METALSTUDS. T. GVPSUM BOARD. LL ACOUSTICAL TILE AND PANELS. V.CARPET. W.CARPETPAD. X. DEMOUNTABLE PARTITIONS. V. EpUIPMENT. Z.CABINETS. AA. PLUMBING FlXTURES. BB.PIPING. CC.SUPPORTSANDHANGERS. DD.VALVES. EE. SPRMKLERS. FF. MECHANICAL EQUIPMENT. GGREFRIGERANTS. HHPLECTRICAL CONDUIT. II. COPPER WIRING. JJ. LIGHTING RXTURES. KK. LAMPS. LL.BALLASTS. MM. ELECTRICAL DEVICES. NN.SWITCHGEARAND PANELBOARDS. OOSRANSFORMERS. 2 CONSTRUCTION WASTE: A.MASONRVANDCMU. B.LUMBER C. WOOD SHEET MATERIALS. D. WOOD TRIM. E.METALS. F. ROOFING. G. INSULATION. H. CARPET AND PAD. I. GYPSUM BOARD. J. PIPING. K. ELECTRICAL CONDUIT. L PACKAGING: REGAR�LESS OF SALVAGE/RECVCLE GOAL INDICATED IN "GENERAL" PARAGRAPH ABOVE, SALVAGE OR RECVCLE 100 PERCENT OF THE FOLLOW ING UNCONTAMINATED PACKAGING MATERIALS: 1) PAPER. 2)CARDBOARD. 3) BOXES- 4) PLASTIC SHEET AN� FILM. 5) POLVSTVRENE PACKAGING. 6) WOO� CRATES- �) PLASTIC PAILS. 1.5 QUALITV ASSURANCE A. REGULATORV REQUIREMENTS: COMPLV W ITH HAULING AN� DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. B. WASTE MANAGEMENT CONFERENCE: CONDUCT CONFERENCE AT PROJECT SITE. REVIEW METHODS AND PROCEDURES RELATED TO WASTE MANAGEMENT INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: 1. REVIEW AND DISCU55 WASTE MANAGEMENT PLAN INCLUDING RESPONSIBILITIES OF WASTE MANAGEMENT COORDINATOR. 2. REVIEW REQUIREMENTS FOR DOCUMENTING QUANTITIES OF EACH TYPE OF WASTE AND ITS DISPOSITION. 3. REVIEW AND FINAL2E PROCEDURES FOR MATERIALS SEPARATION AND VERIFV AVAILABILITVOF CONTAW ERS AND BINS NEEDED TO AVOID DELAVS. 4. REVIEW PROCEDURES FOR PERIODIC WASTE COLLECTION AND TRANSPORTATION TO RECVCLING AND DISPOSAL FACILITIES. 5.REVIEW WASTEMANAGEMENTREQUIREMENTSFOREACHTRADE PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 PLAN IMPLEMENTATION A. GENERAL�. IMPLEMENT APPROVED WASTE MANAGEMENT PLAN. PROVIDE HANDLING, CONTAMERS, STORAGE, SIGNAGE, TRANSPORTATION, AND OTHER ITEMS AS REpl11RED TO IMPLEMENT WASTE MANAGEMENT PLAN DURING THE ENTIRE DURATION OF THE CONTRACT. B. TRAINING: TRAIN WORKERS, SUBCONTRACTORS, AND SUPPLIERS ON PROPER WASTE MANAGEMENT PROCEDURES, AS APPROPRIATE FOR THE WORK. 1. DISTRIBl1TE WASTE MANAGEMENT PLAN TO EVERVONE CONCERNED. 2. DISTRIBUTE WASTE MANAGEMENT PLAN TO ENTITIES WHEN THEV RRST BEGIN WORK ON-SITE. REVIEW PLAN PROCE�URESANO LOCATIONS ESTABLISHED FOR SALVAGE, RECVCLING, AND DISPOSAL Q SITE ACCESS AND TEMPORARV CONTROLS: CONDUCT WASTE MANAGEMENT OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, WALKWAYS, AN� OTHER ADJACENT OCCUPIED AND USED FACILITIES. L �ESIGNATE AND LABEL SPECIRC AREAS ON PROJECT SITE NECESSARY FOR SEPARATING MATERIALS THAT ARE TO BE SALVAGED, RECVQED, REUSED, DONATED, AND SOLD. 32 SALVAGING DEMOLITION WASTE A. SALVAGED ITEMS FOR REUSE IN THE WORK: SALVAGE ITEMS FOR REUSE AND HANDLE AS FOLLOWS: 1.CLEAN SALVAGEDITEMS. 2. PACK OR CRATE ITEMS AFTER CLEANING. IDENTIFY CONTENTS OF CONTAINERS WITH LABEL INDICATING ELEMENTS. DATE OF REMOVAL, QUANTITY, AND LOCATION WHERE REMOVED. 3. STORE ITEMS IN A SECURE AREA UNTIL INSTALLATION. 4. PROTECT ITEMS FROM �AMAGE DURING TRANSPORT AND STORAGE. 5. INSTALL SALVAGED ITEMS TO COMPLV W ITH INSTALLATION REQUIREMENTS FOR NEW MATERIALSAND EQUIPMENT. PROVIDE CONNECTIONS, SUPPORTS, AND MISCELLANEOUS MATERIALS NECESSARV TO MAKE ITEMS FUNCTIONAL FOR USE INDICATED. B. SALVAGED ITEMS FOR OWNER'S USE SALVAGE ITEMS FOR OWNER'S 115EAN� HANDLE AS FOLLOWS L 0.EAN SALVAGED ITEMS. 2 PACK OR CRATE ITEMS AFTER CLEANING. IDENTIFV CONTENTS OF CONTAINERS WITH LABEL INDICATING ELEMENTS, DATE OF REMOVAL, QUANTITV, AND LOCATION WHERE REMOVED. 3. STORE ITEMS IN A SECURE AREA U NTIL DELNERY TO OW NER. 4. TRANSPORT ITEMS TO OW NER'S STORAGE AREA �ON-SITE] [OFFSITE] [DESIGNATED BV O W NER]. 5. PROTECT ITEMS FROM DAMAGE Dl1RING TRANSPORT AND STORAGE. Q �OORS AND HAROWARE�. BRACE OPEN END OF DOOR FRAMES EXCEPT FOR REMOVING DOOR CLOSER$ LEAVE DOOR HARDWARE ATTACHED TO DOORS. D. EQUIPMENT�. DRAIN TANKS. PIPING, AND FIXTURES. SEAL OPENINGS W ITH CAPS OR PLUGS. PROTECT E�UIPMENT FROM EXPOSURE TO WEATHER. E PLUMBING RXTURES: SEPARATE BYTYPEAND SIZE. F. LIGHTING R%Tl1RE5: SEPARATE LAMPS BV TVPE AND PROTECT FROM BREAKAGE. G. ELECTRICAL �EVICES: SEPARATE SWITCHES, RECEPTACLES, SWITCHGEAR, TRANSFORMERS. METERS, PANELBOAR�S, QRCUIT BREAKERS, AND OTHER DEVICES BY TVPE. 3.3 RECVCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL A. PREPARATION OF WASTE: PREPARE AND MAINTAIN RECVCLABLE WASTE MATERIALS ACCORDING TO RECVCLING OR REUSE FACILITV REpUIREMENTS. MAINTAIN MATERIALS FREE OF DIRT, ADHESIVES, SOLVENTS, PETROLEUM CONTAMINATION, AND OTHER SUBSTANCES DELETERIOUS TO THE RECVCLING PROCESS. B. PROCEDURES: SEPARATE RECYCLABLE WASTE FROM OTHER WASTE MATERIALS, TRASH, AND DEBRIS. SEPARATE RECVCLABLE WASTE BV TYPE AT PROJECT SITE TO THE MAXIMUM EXTENT PRACTICAL ACCORD W G TO APPROVED CONSTRUCTION WASTE MANAGEMENT PLAN. 1. PROVIDE APPROPRIATELV MARKED CONTAINERS OR 6W5 FOR CONTROLLING RECVCLABLE WASTE UNTIL REMOVED FROM PROJECT SITE. INCLUDE LIST OF ACCEPTABLE AND UNACCEPTABLE MATERIALS AT EACH CONTAMEft AN� BIN. 2 STOCKPILE PROCESSED MATERIALS ON-SITE W ITHOl1T MTERMIXING W ITH OTHER MATERIALS. PLACE, GRADE, AND SHAPE STOCKPILES TO �RAIN SURFACE WATER. COVER TO PREVENT WINDBLOWN DUST. 3. STOCKPILE MATERIALS AWAY FROM CONSTRUCTION AREA. DO NOT STORE WITHIN �RIP LME OF REMAINING TREES. 4. STORE COMPONENTS OFF THE GROUND AN� PROTECT FROM THE W EATHER. `��""^"� ��^"^' "�' �`","`T� `�OM OWNER'S PROPERTV AN� TRANSPORT TO RECYCLING RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel ` � �un��V l�rcNal�=L. � DATE: OH�Z5 2O SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL (CONT.) 3.4 RECVCLING DEMOLITION WASTE A. WO00 MATERIALS: SORTANO STACK MEMBERS ACCOROING TO SIZE TVPE AN� LENGTH. SEPARATELUMBER ENGINEEREDWOO�PRO�UCTS PANEL PRO�UCTS ANDTREATEDWOO� MATERIALS. B. METALS: SEPARATE METALS BV TVPE. STRUCTURAL STEEL STACK MEMBERS ACCORDING TO SIZE, TVPE OF MEMBER, AND LENGTH. REMOVE AND DISPOSE OF BOLTS, NUTS, WASHERS, AND OTHER ROUGHHARDWARE. C. GYPSUM BOARD: STACK LARGE QEAN PIECES ON WOOD PALLETS OR IN CONTAMER AND STORE IN A DRV LOCATION. REMOVE EDGE TRIM AND SORT W ITH OTHER METALS. REMOVE AND DISPOSE OF FASTENERS. 0. ACOUSTICAL CEILING PANELS ANO TILE: STACK LARGE CLEAN PIECES ON WO00 PALLETS AND STORE IN A DRV LOCATION. E METAL SUSPENSION SYSTEM: SEPARATE METAL MEMBERS INC W DING TRIM, AND OTHER METALS FROM ACOUSTICAL PANELS AND TILE ANO SORT WITH OTHER METALS. F. CARPET AND PAD: ROLL LARGE PIECES TIGHTLV AFTER REMOVING DEBRIS, TRASH, ADHESIVE, AND TACK STRIPS. 1. STORE CLEAN, DRV CARPET AND PAD IN A CLOSED CONTAINER OR TRAILER PROVIOED BV CARPET RECLAMATION AGENCV OR CARPET RECVC�ER. G. CARPET TILE: REMOVE DEBRIS, TRASH, AND ADHESNE. 1. STACK TILE ON PALLET AN� STORE CLEAN, ORV CARPET IN A CLOSEO CONTAINER OR TRAILER PROVIDED BV CARPET RECLAMATION AGENCV OR CARPET RECVCLER. H. PIPING: REDUCE PIPING TO STRAIGHT LENGTHS AND STORE BY TYPE AND SRE SEPARATE Sl1PPORTS, HANGERS, VALVES, SPRINKLERS, AND OTHER COMPONENTS BV TVPE ANO SIZE. I. CONDUIT�. REDUCE CONDUIT TO STRAIGHT LENGTHS AND STORE BV TVPE AND SIZE. 3.5 RECVCLING CONSTRUCTION WASTE A. PACKAGING: 1. CARDBOARD AND BOMES: BREAK DOW N PACKAGWG INTO FLAT SHEETS. BUNDLE AND STORE IN A DRV LOCATION. 2 POLVSTVRENE PACKAGING: SEPARATE AND BAG MATERIALS. 3. PALLETS: AS MUCH AS POSSIBLE, REQUIRE DELIVERIES USING PALLETS TO REMOVE PALLETS FROM PROJECT SITE FOR PALLETS THAT REMAIN ON-SITE, BREAK DOWN PALLETS INTO COMPONENT WO00 PIECES AND COMPLV W ITH REQUIREMENTS FOR RECVCLING WOO�. 4. CRATES: BREAK �OWN CR4TE5INTO COMPONENT WOOD PIECES AND COMPLV WITH REQUIREMENTS FOR RECVCLING WOOD. B. WO00 MATERIALS: 1. CLEAN CUT-0FFS OF LUMBER'. GRIND OR CHIP INTO SMALL PIECES. 2. CLEAN SAW DUST: BAG SAW DUST THAT DOES NOT CONTAIN PAINTED OR TREATED WOOD. COMPLV W ITH REQUIREMENTS IN SECTION 329300 "PLANTS" FOR USE OF CLEAN SAW DUST AS ORGANIC MULCH. Q GVPSUM BOARD: STACK LARGE CLEAN PIECES ON WOOD PALLETS OR IN CONTAMER AND STORE IN A ORV LOCATION. L CLEAN GVPSUM BOARD: GRIND SCRAPS OF CLEAN GVPSUM BOARD USING SMALL MOBILE CHIPPER OR HAMMER MILL. SCREEN OUT PAPER AFTER GRINDING_" COMPLV W ITH REQUIREMENTS IN SECTION 329300 "PLANTS" FOR USE OF CLEAN GROUNO GVPSUM BOARD AS INORGANIC SOIL AMENDMENT. 3.6 �ISPOSAL OF WASTE A. GENERAL' EXCEPT FOR ITEMS OR MATERIALS TO BE SALVAGED, RECVCLED, OR OTHERWISE REUSEo, REMOVE WASTE MATERIALS FROM PROJECT SITE AND LEGALLV DISPOSE OF THEM IN A LANDRLL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION. EXCEPT AS OTHERW ISE SPEQFIED, DO NOT ALLOW WASTE MATERIALS THATARE TO BE DISPOSEO OF ACCUMULATE ON- SITE. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT W ILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS. SECTION 017700- CLOSEOUT PROCEDURES PART1-GENERAL 1.iRELATEDDOCUMENTS A. DRAW INGS AND GENERAL PROVISIONS OF THE CONTRACT, INC W DING GENERAL AND SUPPLEMENTARV CONDITIONS AND OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLV TO THIS SECTION. 1.25UMMARV A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS FOR CONTRACT CLOSWUT, INCLUDING, BUT NOT LIMITE� TO, THE FOLLOW ING'. 1. SUBSTANTIAL COMPLETION PROCEDl1RE5. 2 FINAL COMPLETION PROCEOURES. 3. WARRANTIES. 4. FINAL CLEANING. 5. REPAIR OF THE WORK. 1.3 ACTION SUBMITTALS A. PRODUCT DATA: FOR CLEANING AGENTS. CONTRACTOR'S LIST OF INCOMPLETE ITEMS: INITIAL SUBMITTAL AT SUBSTANTIAL COMPLETION. CERTIFlED LIST OF INCOMPLETE ITEMS RNAL SUBMITTAL AT FlNAL COMPLETION. 1 4 CLOSEOUT SUBMITTALS A. CERTIFICATES OF RELEASE: FROM AUTHORITIES HAVMG JURISDICTION. CERTIFICATE OF INSURANCE FOR CONTINUING COVERAGE FlELD REPORT: PoR PEST CONTROL INSPECTION. 1.5 MAWTENANCEMATERIALSUBMITTALS A. SCHEDULE OF MAINTENANCE MATERIAL ITEMS: FOR MAINTENANCE MATERIAL SUBMITTAL ITEMS SPECIFlED IN OTHER SECTIONS. 1.6 SUBSTANTIAL COMPLETION PROCEDURES A. CONTRACTORS LIST OF INCOMPLETE ITEMS: PREPARE AND SUBMIT A LIST OF ITEMS TO BE COMPLETE� AND CORRECTED (CONTRACTOR'S PUNCH LIST), INDICATING REASONS WHV THE WORK IS WCOMPLETE. B. SUBMITTALS PRIOR TO SUeSTANTIAL COMPLETION: COMPLETE THE FOLLOW WG A MINIMUM OF 10 DAVS PRIOR TO REQUESTING INSPECTION FOR DETERMINING DATE OF SUBSTANTIAL COMPLETION LIST ITEMS BELOW THATARE INCOMPLETEATTIME OF REQUEST. 1. CERTIFlCATES OF RELEASE: OBTAIN AND SUBMIT RELEASES FROM AUTHORITIES HAVING JURISDICTION PERMITTING OW NER UNRESTRICTED USE OF THE W ORK AND ACCESS TO SERVICES AND UTILITIES. INC W DE OCCUPANCV PERMITS, OPERATING CERTIFICATES, AND SIMILAR RELEASES. 2. SUBMIT CLOSEOUT SUBMITTALS SPEGRED IN OTHER DIVISION 01 SECTIONS, INCLUDING PROJECT RECORD DOCUMENTS, OPERATION AND MAMTENANCE MANUALS, FINAL COMPLETION CONSTRUCTION PHOTOGRAPHIC DOWMENTATION, DAMAGE OR SETTLEMENT SURVEVS, PROPERTV SURVEVS, AND SIMILAft FlNAL RECORD MFORMATION. 3. SUBMIT CLOSEOUT Sl16MITTALS SPECIFIED IN INDIVIDUAL SECTIONS, INCWDING SPECIFIC WARRANTIES, WORKMANSHIP BONDS, MAINTENANCE SERVICE AGREEMENTS, FlNAL CERTIFlCATIONS, AND SIMILAR DOCUMENTS. 4. SUBMIT MAMTENANCE MATERIAL SUBMITTALS SPECIFIED IN INDIVIDUAL SECTIONS, INC WOING TOOLS, SPARE PARTS, EXTRA MATERIALS, AND SIMILAR ITEMS, AND DELNER TO LOCATION DESIGNATED BV ARCHITECT AND I OR ENGMEER. LABEL W ITH MANUFACTURER'S NAME AND MODEL NUMBER WHERE APPLICABLE. 5. SUBMITTESTIADJUST/BALANCE RECORDS. 6. SUBMIT CHANGEOVER MFORMATION RELATE� TOOWNER'S OCCUPANCV, USE, OPERATION, ANC MAWTENANCE. C. PROCEDURES PRIOR TO SUBSTANTIAL COMPLETION: COMPLETE THE FOLLOW WG A MINIMUM OF 10 DAYS PRIOR TO REQUESTING INSPECTION FOR DETERMINING DATE OF SUBSTANTIAL COMPLETION. LIST ITEMS BELOW THAT ARE INCOMPLETE AT TIME OF REQl1EST. 1. ADVISE OWNER OF PENDWG INSURANCE CHANGEOVER REQUIREMENTS. 2. MAKE FlNAL CHANGEOVER OF PERMANENT LOCKS AND DELNER KEYS TO OW NER. A�VISE OWNER'S PERSONNEL OF CHANGEOVER IN SECURITV PROVISIONS. 3. COMPLETE STARTUP AND TESTING OF SVSTEMS AND EQUIPMENT. 4. PERFORM PREVENTIVE MAINTENANCE ON EQUIPMENT USED PRIOR TO SUBSTANTIAL COMPLETION. 5. INSTRUCT OWNER'S PERSONNEL IN OPERATION, ADJUSTMENT, AND MAINTENANCE OF PRODUCTS, EQUIPMENT, AND SVSTEMS. 6. ADVISE OW NER OF CHANGEOVER IN HEAT AND OTHER UTILITIES. 7. PARTICIPATE WITH OWNER IN CONDUCTING INSPECTION AND WALKTHROUGH WITH LOCAL EMERGENCVRESPONDERS. 8. TERMINATE AND REMOVE TEMPORARV FACILITIES FROM PROJECT SITE, ALONG W ITH MOCKUPS, CONSTRUCTION TOOLS, AND SIMILAR ELEMENTS. 9. COMPLETE FlNAL QEANING REQUIREMENTS, INCLUDING TOUCHUP PAINTING. 10. TOUCH UP AND OTHERW ISE REPAIR AN� RESTORE MARRED ExPOSED FINISHES TO ELIMINATE VISUAL DEFECTS. 1] FlNAL COMPLETION PROCEDURES A. SUBMITTALS PRIOR TO FlNAL COMPLETION: BEFORE REQUESTING FINAL INSPECTION FOR DETERMINWG FINAL COMPLETION, COMPLETE THE FOLLOW WG 1. SUBMIT A RNAL APPLICATION FOR PAVMENT ACCORDING TO SECTION 012900 "PAVMENT PROCEDURES" 2. CERTIFIED LIST OF INCOMPLETE ITEMS: SUBMIT CERTIFIED COPV OF ARCHITECT'S SUBSTANTIAL COMPLETION INSPECTION LIST OF ITEMS TO BE COMPLETED OR CORRECTED (PUNCH LIST), ENDORSED AND DATED BV ARCHITECT. CERTIFlED COPV OF THE LIST SHALL STATE THAT EACH ITEM HAS BEEN COMPLETED OR OTHERW ISE RESOLVED FOR ACCEPTANCE. 3. CERTIFlCATE OF INSURANCE'. SUBMIT EVIDENCE OF RNAL, CONTINUING INSURANCE COVERAGE COMPLVING WITH WSURANCE REQUIREMENTS. 1.8 LISTOF INCOMPLETE ITEMS (PUNCH uST) A. ORGANIZATION OF LIST: INCW DE NAME AND IDENTIFICATION OF EACH SPACE AN� AREA AFFECTED BY CONSTRUCTION OPERATIONS FOR INCOMPLETE ITEMS AN� ITEMS NEEDING CORRECTION INCLUDING, IF NECESSARV, AREAS DISTURBED BV CONTRACTOR THAT ARE OUTSIDE THE LIMITS OF CONSTRUCTION. 1. ORGANIZE ITEMS APPLVING TO EACH SPACE BV MAJOR ELEMENT, INCW DING CATEGORIES FOR CEILING, INOIVIDUAL WALLS, FLOORS, EQUIPMENT, AND BUILDING SVSTEMS. INCLUDE THE FOLLOWING MFORMATION AT THE TOP OF EACH PAGE: A. PROJECT NAME. B.�ATE. G NAME OF ARCHITECT D. NAME OF CONTRACTOR. E. PAGE NUMBER. 2. SUBMIT LIST OF INCOMPLETE ITEMS IN THE FOLLOWING FORMAT. PDF ELECTRONIC FlLE. ARCHITECT, W ILL RETURN ANNOTATED FlLE. 1.9 SUBMITTAL OF PROJECT WARRANTIES A. TIME OF SUBMITTAL SUBMIT WRITTEN WARRANTIES ON REQUEST OF ARCHITECT FOR DESIGNATED PORTIONS OF THE WORK WHERE COMMENCEMENT OF WARRANTIES OTHER THAN DATE OF SUBSTANTIAL COMPLETION IS INDICATED, OR WHEN DELAV IN SUBMITTAL OF WARRANTIES MIGHT LIMIT OW NER'S RIGHTS UNDER WARRANTY. B. ORGAMZE WARRANTV DOCUMENTS INTO AN ORDERLY SEQl1ENCE BASED ON THE TABLE OF CONTENTS OF PROJECT MANUAL. PROVIDE ADDITIONAL COPIES OF EACH WARRANTV TO INCLU�E IN OPERATION AND MAINTENANCE MANUALS. PART2-PRODUCTS 2.1 MATERIALS A. CLEANING AGENTS: USE CLEANING MATERIALS AND AGENTS RECOMMENDED BY MANUFACTURER OR FABRICATOR OF THE SURFACE TO BE CLEANE�. DO NOT USE CLEANING AGENTS THAT ARE POTENTIALLV HAZARDOUS TO HEALTH OR PROPERTV OR THAT MIGHT DAMAGE FlNISHED SURFACES. 1. USE CLEANING PRODUCTS THAT COMPLV W ITH GREEN SEACS G53I, OR IF G53] IS NOT APPLICABLE, USE PRODUCTS THAT COMPLV W ITH THE CALIFORNIA CODE OF REGULATIONS MAXIMUM ALLOWABLE VOC LEVELS. SECTION 017700- CLOSEOUT PROCEDURES (CONT.) PART 3 - EXECUTION 3.1 FINAL QEANING A. GENERAL PERFORM FINAL CLEANING. CONDUCT CLEANING AN� WASTEREMOVAL OPERATIONS TO COM PLv W ITH LOCAL LAW S AND ORDINANCES AND FEDERAL AND LOCAL ENVIRONMENTAL AND ANTIPOLLUTION REGULATIONS. EMPLOY EXPERIENCED W ORKERS OR PROFESSIONAL CLEANERS FOR FINAL CLEANING. CLEAN EACH SURFACE OR UNIT TO CON�ITION EXPECTED IN AN AVERAGE COMMERCIAL BUILDING CLEANWG AND MAINTENANCE PROGRAM. COMPLV WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. 3 2 REPAIR OF THE W ORK A. COMPLETE REPAIR AND RESTORATION OPERATIONS BEFORE REQUESTING INSPECTION FOR DETERMINATION OF SUBSTANTIAL COMPLETION. B. REPAIR OR REMOVE ANO REPLACE �EFECTIVE CONSTRUCTION. REPAIRING INC W DES REPLAQNG DEFECTIVE PARTS, RERNISHING �AMAGED SURFACES, TOUCHING UP WITH MATCHING MATERIALS. AND PROPERLYA�JUSTING OPERATING EQUIPMENT. WHERE DAMAGED OR WORN ITEMS CANNOT BE REPAIRED OR RESTORED, PROVIDE REPLACEMENTS. REMOVE AND REPLACE OPERATING COMPONENTS THAT CANNOT eE REPAIRED. RESTORE �AMAGED CONSTRUCTION AND PERMANENT FACILITIES USED DURING CONSTRUCTION TO SPECIFlED CON�ITION. 1. REMOVE AND REPLACE CHIPPED, SCRATCHED, AND BROKEN GLASS, REFLECTNE SURFACES, AND OTHER DAMAGED TRANSPARENT MATERIALS. 2. TOUCH UP AND OTHERWISE REPAIR AND RESTORE MARRED OR EXPOSED FINISHES AND SURFACES. REPLACE FINISHES AND SURFACES THAT THAT ALREADV SHOW EVIDENCE OF REPAIR OR RESTORATION. A. DO NOT PAINT OVER "UL" AN� OTHER REpUIRED LABELS AND IDENTIFICATION, WCLUDING MECHANICAL AND ELECTRICAL NAMEPLATES. REMOVE PAINT APPLIED TO REQUIRED LABELS AND IDENTIFlCATION. 3. REPLACE PARTS SUBJECT TO OPERATING CONDITIONS DURING CONSTRUCTION THAT MAV IMPEDE OPERATION OR REDUCE LONGEVITV. 4. REPLACE BURNED-OUT BULBS, BULBS NOTICEABLV DIMMED BV HOURS OF USE. AND DEFECTIVE AN� NOISY STARTERS IN FWORESCENT AND MERCURV VAPOR FIXTURES TO COMPLV WITH REQUIREMENTS FOR NEW FI%TURES. SECTION 017839- PROJECT RECORD DOCUMENTS PART1-GENERAL 1.1 REL4TED DOCUMENTS A. DRAW INGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLU�ING GENERAL AND SUPPLEMENTARV CONDITIONS AND OTHER DIVISION 01 SPEGFICATION SECTIONS, APPLV TO THIS SECTION. 1.2SUMMARV A. SECTION INC W DES ADMINISTRATNE AND PROCEDURAL REpUIREMENTS FOR PROJECT RECORD DOCUMENTS, INCLUDING THE FOLLOW WG: 1. RECORD DRAWINGS. 2 RECORD SPEQFICATIONS. 3. RECORD PRODUCT DATA. 1.3 CLOSEOUT SUBMITTALS A. RECORD DRAW INGS: COMPLV W ITH THE FOLLOW ING: L NUMBER OF COPIES: SUBMIT COPIES OF RECORD DRAW WGS AS FOLLOWS: A RNALSUBMITTAL 1) SUBMIT RECORD DIGITAL DATA FlLES. B. RECORo SPECIRCATIONS: SUBMIT ANNOTATED PDF ELECTRONIC FILES OF PROJECT'S SPECIFICATIONS, W CLUDING ADDENDA AND CONTRACT MODIFICATIONS. C. REPORTS: SUBMIT WRITTEN REPORT WEEKLV INDICATING ITEMS INCORPORATEO INTO PROJECT RECORD DOCUMENTS CONCURRENT WITH PROGRESS OF THE WORK, WCWDING REVISIONS, CONCEALEO CONDITIONS, FIELD CHANGES, PRODUCTSELECTIONS, AND OTHER NOTATIONS INCORPORATED. PART2-PRODUCTS 2.1 RECORD DRAWINGS A. RECORD DIGITAL DATA FlLES: IMMEDIATELV BEFORE WSPECTION FOR CERTIFICATE OF SUBSTANTIAL COMPLETION, PREPARE A FULL SET OF CORRECTED DIGITAL DATA FILES OF THE CONTRACT DRAW INGS, AS FOLLOWS: 1. FORMAT: DW F AN� PDF ELECTRONIC FlLES, MICROSOFT W INDOWS OPER4TING SVSTEM. 2 ARCHITECT W ILL FURNISH CONTRACTOR ONE SET OF DIGITAL DATA FILES OF THE CONTRACT �RAWINGS FOR USE IN RECORDING INFORMATION. A. ARCHITECT W ILL PROVIDE OATA FlLE LAVER INFORMATION. RECORD MARKUPS IN SEPARATE LAVERS. 22 RECORD SPECIRCATIONS A. PREPARATION: MARK SPEQFICATIONS TO INDICATE THE ACTUAL PRODUCT WSTALLATION WHERE INSTALLATION VARIES FROM THAT INDICATED W SPECIFICATIONS, ADDENDA, AND CONTRACT MOOIFICATIONS. 1. GIVE PARTICULAR ATTENTION TO INFORMATION ON CONCEALED PRODl1CT5 AND INSTALLATIONS THAT CANNOT BE READILV IDENTIFIED AND RECORDED LATER. 2. MARK COPV W ITH THE PROPPoETARV NAME AND MODEL NUMBER OF PRODUCTS, MATERIALS, AND EQl11PMENT FURNISHED, INCW DING SUBSTITUTIONS ANO PRODl1CT OPTIONS SELECTED. 3. RECORD THE NAME OF MANUFACTURER, SUPPLIER, INSTALLER, AND OTHER WFORMATION NECESSARV TO PROVIDE A RECORD OF SELECTIONS MADE. 4. FOR EACH PRINCIPAL PRODUCT, INDICATE WHETHER RECORD PRODl1CT DATA HAS BEEN SUBMITTED IN OPERATION AND MAIMENANCE MANUALS INSTEAD OF SUBMITTED AS RECORD PRODUCTDATA. 5. NOTE RELATED CHANGE ORDERS, RECORD PRODUCT DATA, AND RECORD DRAW INGS WHERE APPLICABLE. B. FORMAT'. SUBMIT RECORD SPECIRCATIONS AS ANNOTATED PDF ELECTRONIC FlLE 2 3 RECORD PRODl1CT DATA A. PREPARATION: MARK PRODUCT DATA TO INDICATE THE ACTUAL PRODUCT INSTALLATION WHERE WSTALLATION VARIES SUBSTANTIALLY FROM THAT IN�ICATED IN PRODUCT DATA SUBMITTAL. 1. GIVE PARTICULAR ATTENTION TO W FORMATION ON CONCEALED PRODUCTS AND INSTALLATIONS THAT CANNOT BE READILV IDENTIFlED AND RECORDED LATER. 2. INCW DE SIGNIFICANT CHANGES IN THE PRODUCT DELNERED TO PROJECT SITE AND CHANGES IN MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATION. 3. NOTE RELATED CHANGE ORDERS, RECORD SPECIFICATIONS, AND RECORD DRAW INGS WHERE APPLICABLE. B. FORMAT: SUBMIT RECORD PRODUCT DATA AS ANNOTATED P�F ELECTRONIC RLE. 1. INCLUDE RECORD PRODUCT DATA DIRECTORV ORGANRED BY SPECIFICATION SECTION NUMaER AND TITLE, ELECTRONICALLV LINKED TO EACH ITEM OF RECORD PRODUCT DATA. PART 3 - EXECUTION 3.1 RECORDING AND MAINTENANCE A. RECORDING'. MAINTAIN ONE COPV OF EACH SUBMITTAL DURING THE CONSTRUCTION PERIOD FOR PROJECT RECORD DOCUMENT PURPOSES. POST CHANGES AND REVISIONS TO PROJECT RECORD DOCUMENTS AS THEV OCCUR; DO NOT WAIT UNTIL END OF PROJECT. B. MAINTENANCE OF RECORD DOCUMENTS AND SAMPLES: STORE RECORD DOCUMENTS AND SAMPLES W THE FIELD OFFICE APART FROM THE CONTRACT DOCUMENTS USED FOR CONSTRUCTION. DO NOT USE PROJECT RECORD DOCUMENTS FOR CONSTRUCTION PURPOSES. MAINTAIN RECORD DOCUMENTS IN GOOD OR�ER AND IN A QEAN, DRY, LEGIBLE CONDITION, PROTECTEO SECTION 024119- SELECTIVE DEMOLITION PART7-GENERAL 1.1 RELATED DOCUMENTS A. DRAW INGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDMG GENERAL AND SUPPLEMENTARV CONDITIONS AND DIVISION 01 SPECIFICATION SECTIONS, APPLV TO THIS SECTION. 1 2 Sl1MMARV A. SECTION INCLUDES: 1. DEMOLITION AND REMOVAL OF SELECTED PORTIONS OF BUILDING OR STRUCTURE. 2 OEMOLITION AND REMOVAL OF SELECTED SITE ELEMENTS. 3. SALVAGE OF EXISTING ITEMS TO BE REUSED OR RECYCLED. 1.3 DERNITIONS A. REMOVE: DETACH ITEMS FROM EXISTING CONSTRIICTION AND LEGALLV DISPOSE OF THEM OFF-SITE UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND REINSTALLED. B. REMOVE AND SALVAGE: CAREFULLV DETACH FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, AND DELIVER TO OWNER READV FOR REUSE. C. REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE FOR REUSE, AND REINSTALL WHERE INDICATED. D. EXISTING TO REMAIN: E%ISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE PERMANENTLV REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. 1 4 QUALITV ASSURANCE A. REFRIGERANT RECOVERV TECHNICIAN QUALIFICATIONS: CERTIFIED BVAN EPA-APPROVED CERTIFICATION PROGRAM. SECTION 055000 - METAL FABRICATIONS PART1-GENERAL 1.iRELATEDDOCUMENTS A.DRAWINGSANDGENERALPROVISIONSOFTHECONTRACT INCWDINGGENERALAND SUPPLEMENTARVCONDITIONS AND DIVISION 01 SPECIFICATION SECTIONS, APPLV TO THIS SECTION. 1.25UMMARV A. SECTION INCLUDES: 1. STEEL FRAMING AND SUPPORTS FOR CEILING-HUNG TOILET COMPARTMENTS. 2 STEEL FRAMING AND SUPPORTS FOR OPERABLE PARTITIONS. 3. STEEL FRAMING AND SUPPORTS FOR OVERHEAD DOORS. 4. STEEL FRAMING AND SUPPORTS FOR COUNTERTOPS. 5. STEEL TUBE REINFORCEMENT FOR LOW PARTITIONS. 6. STEEL FRAMING AND SUPPORTS FOR MECHANICAL AND ELECTRICAL EQUIPMENT. �. STEEL FRAMING AND SUPPORTS FOR APPLICATIONS W HERE FRAMING AND SUPPORTS ARE NOT SPECIFIED IN OTHER SECTIONS. 8. SHELF ANGLES. 9. MISCELL4NEOUS STEEL TRIM 1.3 COOR�INATION A. COORDINATE SELECTION OF SHOP PRIMERS WITH TOPCOATS TO BE APPLIED OVER THEM. COMPLV W ITH PAINT AND COAT W G MANUFACTURERS' W RITTEN RECOMMEN�ATIONS TO ENSURE THAT SHOP PRIMERS AND TOPCOATS ARE COMPATIBLE W ITH ONE ANOTHER. B. COORDINATE INSTALLATION OF METAL FABRICATIONS THAT ARE ANCHORED TO OR THAT RECEIVE OTHER WORK FURNISH SETTING DRAW MGS, TEMPLATES, AND DIRECTIONS FOR INSTALL WG ANCHORAGES, INCWDING SLEEVES, CONCRETE INSERTS, ANCHOR BOLTS, AND ITEMS WITH INTEGRAL ANCHORS, THAT ARE TO BE EMBEDDED IN CONCRETE OR MASONRV. DELNER SUCH ITEMS TO PROJECT SITE IN TIME FOR INSTALLATION. 1.4 ACTION SUBMITTALS A. SHOP DRAWINGS: SHOW FABRICATION AND INSTALLATION DETAILS. INCLUDE PLANS, ELEVATIONS, SECTIONS, AND DETAILS OF METAL FABRICATIONS AND THEIR CONNECTIONS. SHOW ANCHORAGE ANDACCESSORYITEMS. 1.5 RELD CONDITIONS A RELD MEASUREMENTS: VERIFV ACTUAL LOCATIONS OF WALLS AND OTHER CONSTRUCTION CONTIGUOUS WITH METAL FABRICATIONS BY FIELD MEASUREMENTS BEFORE FABRICATION. PART2-PRODUCTS 2.7 METALS A. METAL SURFACES, GENERAL PROVI�E MATERIALS WITH SMOOTH, FLAT SURFACES UNLESS OTHERW ISE INDICATED. FOR METAL FABRICATIONS E%POSED TO VIEW IN THE COMPLETED WORK, PROVIDE MATERIALS WITHOUT SEAM MARKS, ROLLER MARKS, ROLLED TRADE NAMES, OR BLEMISHES. 22FASTENERS A. GENERAL: UNLESS OTHERWISE INDICATED, PROVIDE TVPE 304 STAINLESS-STEEL FASTENERS FOR EXTERIOR USE AND ZINC-PLATED FASTENERS W ITH COATING COMPLVING W ITH ASTM B 633 OR ASTM F 1941 (ASTM F 1941M), CLASS FEIZN 5, AT EXTERIOR WALLS. SELECT FASTENERS FOR TVPE, GftADE, AND CLASS RE�UIRED. 2.3 MISCELLANEOUS MATERIALS A. LOW-EMITTING MATERIALS: PAINTS AND COATINGS SHALL COMPLV WITH THE TESTING AND PRODUCT REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH'S (FORMERLV, THE CALIFORNIA DEPARTMENT OF HEALTH SERVICES') "STANOAR� METHOD FOR THE TESTING AND EVALUATION OF VOLATILE ORGANIC CHEMICAL EMISSIONS FROM INDOOR SOURCES USING ENVIRONMENTALCHAMBERS." B. SHOP PRIMERS: PROVIDE PRIMERS THAT COMPLV WITH MANUFACTURER'S RECOMMENDATIONS AND INDUSTRV STANDARDS. UNIVERSAL SHOP PRIMER: FAST-W RING, LEAD- AND CHROMATE- FREE, UNNERSAL MODIFIEDALKVD PRIMER COMPLVING W ITH MPI#19 AND COMPATIBLE WITH TOPCOAT. C. EPDXV ZINC-RICH PRIMER: COMPLVING W ITH MPI#20 AND COMPATIBLE WITH TOPCOAT. D. SHOP PRIMER FOR GALVANRED STEEL�. PRIMER FORMULATED FOR EMERIOR USE OVER ZMG COATED METAL AND COMPATIBLE WITH FINISH PAINT SVSTEMS INOICATED. E. GALVANIZING REPAIR PAINT: HIGH-ZINC-DUST-CONTENT PAINT COMPLVMG WITH SSPC-PAINT 20 AND COMPATIBLE W ITH PAINTS SPECIFlED TO BE USED OVER IT. F. NONSHRWK, NONMETALLIC GROUT' FACTORV-PACKAGED, NONSTAINING, NONCORROSIVE, NONGASEOUS GROUT COMPLVING WITH ASTM C 110]/C 110]M. PROVIDE GROUT SPECIFICALLV RECOMMENDED BV MANUFACTURER FOR INTERIOR AN� EMERIORAPPLICATIONS. 24 FABRICATION, GENER4L A. SHOP ASSEMBLV: PREASSEMBLE ITEMS IN THE SHOP TO GREATEST E%TENT POSSIBLE. DISASSEMBLE UNITS ONLV AS NECESSARV FOR SHIPPING AND HANDLING LIMITATIONS. USE CONNECTIONS THAT MAINTAIN STRUCTURAL VAW E OF JOINED PIECES. CLEARLV MARK UNITS FOR REASSEMBLV AND COORDINATED INSTALLATION. B. CUT, DftILL, AN� PUNCH METALS CLEANLV AND ACCUftATELV. REMOVE BURRS AND EASE EDGES TO A RADIUS OF APPROXIMATELV 1/32 WCH (1 MM) UNLESS OTHERWISE INDICATED. REMOVE SHARP OR ROUGH AREAS ON EXPOSED SURFACES. G FORM BENT-METAL CORNERS TO SMALLEST RADIUS POSSIBLE WITHOUT CAUSING GRAIN SEPARQTION OR OTHERW ISE IMPAIRING W ORK. D. FORM EXPOSED WORK WITH ACCl1RATE ANGLES AND SURFACES AND STRAIGHT EDGES. E WELD CORNERS AND SEAMS CONTINUOUSLY TO COMPLV W ITH THE FOLLOWING: 1. USE MATERIALS AND METHODS THAT MINIMIZE DISTORTION AND DEVELOP STRENGTH AND CORROSION RESISTANCE OF eASE METALS. 2. OBTAM FUSION W ITHOUT UNDERCUT OR OVERLAP. 3. REMOVE WELDING FWX IMMEDIATELV. 4. AT EXPOSED CONNECTIONS, FINISH EXPOSED WELDS AND SURFACES SMOOTH AND BLENDED SO NO ROUGHNESS SHOWS AFfER FlNISHING AND CONTOUR OF WELDED SURFACE MATCHES THAT OF ADJACENT SURFACE. F. FORM EXPOSED CONNECTIONS WITH HAIRLWE JOINTS, FLUSH AND SMOOTH, USING CONCEALED FASTENERS OR WELDS WHERE POSSIBLE W HERE EXPOSED FASTENERS ARE RE�UIRED, USE PMLLIPS FLAT-HEAO (COUNTERSUNK) FASTENERS UNLE55 OTHERWISE INDICATED. LOCATE JOINTS W HERE LEAST CONSPICUOt15. 2.5 MISCELLANEOUS FRAMING AND SUPPORTS A. GENERAL PROVIDE STEEL FRAMING ANO SIIPPORTS NOT SPEQFIED IN OTHER SECTIONS AS NEEDED TO COMPLETE THE WORK. B. FABRICATE UNITS FROM STEEL SHAPES, PLATES, AND BARS OF WELDED CONSTRUCTION UNLESS OTHERWISE INDICATED. FABRICATE TO SIZES. SHAPES, AND PROFlLES INDICATED AND AS NECESSARV TO RECENE ADJACENT CONSTRUCTION. Q FABRICATE SUPPORTS FOR OPEftABLE PARTITIONS FROM CONTINUOUS STEEL BEAMS OF SRES RECOMMENDED BY PARTITION MANUFACTURER WITH ATTACHE� BEARING PLATES, ANCHORS, AND BRACES AS RECOMMENDED BV PARTITION MANUFACTURER. 2B FlNISHES, GENERAL A. FINISH METAL FABRICATIONS AFTER ASSEMBLV. FINISH EXPOSED SURFACES TO REMOVE TOOL ANO DIE MARKS AND STRETCH LMES, AND TO BLEND INTO SURROUNDING SURFACE. 2] AW MINUM FlN ISHES A. AS-FABRICATED FlNISH: AA-M12. B. CLEAR ANODIC RNISH�. AAMA 611, CLASS I, AA-M12C22A41. PART 3 - EXECUTION 3.1 INSTALLATION, GENERAL A. CUTTING, FlTTING, AND PLACEMENT: PERFORM CUTTING, �RILLING, AND FITTING REpUIRED FOR INSTALLING METAL FABRICATIONS. SET METAL FABRICATIONS ACWRATELV IN LOCATION. ALIGNMENT, AND ELEVATION; W ITH EDGES AND SURFACES LEVEL, PLUMB, TftUE, AND FREE OF RACK; AND MEASURED FROM ESTABLISHED LINES AND LEVELS. B. FIT EXPOSED CONNECTIONS AC W RATELV TOGETHER TO FORM HAIRLINE JOINTS. WELD CONNECTIONS THAT ARE NOT TO BE LEFT AS EXPOSED JOINTS BUT CANNOT BE SHOP WELDED BECAUSE OF SHIPPING SIZE LIMITATIONS. G FASTENING TO IN-PLACE CONSTRUCTION: PROVIDEANCHORAGE DEVICES AND FASTENERS WHERE METAL FABRICATIONS ARE REOUIRED TO BE FASTENED TO IN-PLACE CONSTRUCTION. PROVIDE THREADE� FASTENERS FOR USE WITH CONCRETE AND MASONRV INSERTS, TOGGLE BOLTS, THROUGH BOLTS, AND OTHER CONNECTORS. D. CORROSION PROTECTION: COAT CONCEALED SURFACES OF ALUMINUM THAT COME INTO CONTACT W ITH GROUT, CONCRETE, MASONRY, WOOD, OR DISSIMILAR METALS WITH THE FOLLOW ING: 3 2 ADJUSTING AND CLEAN ING A. TOUCHUP PAINTING: IMMEDIATELY AFTER ERECTION, CLEAN FlELD W ELDS, BOLTED CONNECTIONS, AND ABR4DED AREAS. PAINT 11NCOATEO AND ABRA�ED AREAS WITH THE SAME MATERIAL AS USED FOR SHOP PAINTING TO COMPLV WITH SSPGPA 1 FOR TOUCHWG UP SHOP-PAINTED SURFACES. B. GALVAMZED Sl1RFACES: CLEAN FIEL� WELDS, BOLTED CONNECTIONS, AND ABRADED AREAS AND REPAIR GALVANIZING TO COMPLV WITH ASTM A]80/A ]SOM. � � / ♦ 1 � INDUSTRIOUS COWORKING 880 W MONON GREEN BLVD CARMEL, IN 46032 OWNEPRENANT INDUSTRIOUS 215PARKAVES,4E1300 NEW YORK, NY 1 W03 ARCXITECT OF HECOPD NORX 325 N LASALLE Si- SOIiE SCO CHICAGO. IL 60654 PEiER.DUBWCmNORR-COM 312-0242400 MEP ENGINEER MEENGINEERS 29 WEST 38iH SiREEi, SiH FLOOR NEW YORK. NY 10018 CONiACi: BRIAN SHASSIAN BBIANSHASSIANC�.ME-ENGINEER$_COM JOHN HIGGINS JOHN.HIGGWS(�MEENGINEERS.COM �212J 44]-6]]0 PHONE LIGHTING DESIGNER REGENCY 9261 JOkDAN AVE CHAiSWORiH, CA aoo-2aa2o2a ISSUE DATES REV. DAiE DESCRIPiION 06/OS/2020 DD3 06/18l2020 CDvI 0]/06/2020 CDv2 O]/V/2020 100%/PERMIT SEAL&SIGNATUNE BY CHECK BG PJ BC PJ eC Po BC PJ CARMEL CITY- 880 MONON GREEN PRQIECT NUMBER IND680MON DRAWING TITLE SPECIFlCATIONS SCALE 1 1/2" = 1' 0" SHEET NUMBER A-902 oF PROJECTNAME