Loading...
HomeMy WebLinkAboutG003 General Notes1. DOORSCHEDULE REFER TO DOOR SCHE�ULE FOR ALL DOOR/HARDWARE SPECIFlCATIONS. 1. OVERTIME WORK WHEN FLOOR BELOW IS OCCUPIED PRICE EXTENSIVE FLOOR SLAB PENETRATIONS AND/OR CORING ON AN OVERTIME BASIS. 2 FIELD MEASURE FIELD MEASURE FLOOR TO CEILING DOORS FOR PROPER FIT. ALL CORE AND/OR FLOOR TRENCHING FOR TELEPHONE/ELECTRICAL CON�UITING SHALL BE PERFORME� AFTER HOURS AS REQUIRED AN� COORDINATED WITH BUILDING OWNER PoR APPROVAL. 3. SLOPE EXTERIORLEVELLANDINGMAVSLOPEUPT01/4"PERFOOTMA%.INANVDIRECTIONFORSURFACEDRAINAGE 2 COORDINATIONOFTHEWORK SURVEV FlELD CONDITIONS AND VERIFY THAT WORK IS FEASIBLE AS SHOWN. VERIFY LOCATION OF FLOOR 4. THRESHOLDS OURETS AND OTHER OURETS IN RELATION TO STRUCTURAL THEFLOORORLANDINGSHALLNOTBEMORETHANI/2"LOWERTHANTHETHRESHOLDOFTHEDOORWAY.BEVEL AN�OTHERELEMENTSASREQUIRED.NOTIFVARCHITECTINWRITINGOFANV�ISCREPANCIESBEFORE (12 MAX. SLOPE) WHERE THE THRESHOLD EXCEEDS 1/4" IN HEIGHT. PROCEEDING WITH WORK. 5. DOOROPENINGS ELECTRICALSWITCHANDOUTLETCOVERPLATES,SURFACEHARDWARE,ETC.,SHALLBEINSTALLE�AFTER DOOROPENINGSINPARTITIONSNOTDIMENSIONEDARETOBELOCATEDWITHIN4"OFADJOININGPARTITION, PAINTINGAND/ORAPPLICATIONOFWALLCOVERWGSANDCARPETSPECIFlED. U.O.N. 6. GLASS ALL GLASS IN DOORS SHALL BE TEMPERED SAFETV GLASS, UD.N. 7. HOLLOWMETALDOORS HOLLOW METAL DOORS SHALL BE FINISHED WITH SEMI-GLOSS PAINT. REFER TO FINISH SCHEDULE FOR AD�ITIONL WFORMATION. 8. EXITCORRI�ORS DOORS OPENING INTO REQUIRED EXIT CORRIDORS DO NOT RESTRICT THE REQUIRED WIDTH WHEN OPENED IN ANY POSITION. 3. OUTLETLOCATIONS ARCHITECTURAL DRAW WGS DETERMINE LOCATION AND TVPE (ARCHITECT TO VERIFV WITH ENGINEER) OF ALL OUTLETS AND TAKE PRECEDENCE OVER ALL OTHERS, U.O.N. ELECTRICAL ENG W EER'S PO WER PLAN SHALL GOVERN THE W IRING LAVOUT AN� INSTALLATION IN COMPLIANCE WITH ALL LAWS APPLICABLE AND ENFORCE� BV GOVERNING AUTHORITIES. 4. WALLMOl1NTED0UTLETS OUTLETS SHOWN BACK TO BACK ON PARTITION WALLS SHALL BE OFFSET 1'-0' MAXIMUM, OR MOUNTED AT �IFFERENT HEIGHTS IF INDICATED. 5. �I@d.ITl1RELAVOUT FURNITURE, IF SHO W N, IS FOR REFERENCE ONLY AND IS NOT IN CONTRACT, U.O.N. 9. DOORSWINGS ALL DOORS REQUIRED AS EXRS SHALL SWING IN THE DIRECTION OF TRAVEL 6. EOUIPMENT COORDINATION COORDINATE ALL W ORK RELATED TO EQUIPMENT W ITH MANUFACTURER'S RECOMMENDATIONS, SPECIFICATIONS, 10. WOODSPECIESFORDOORFACINGS AN�INSTRUCTIONS. PROVIDE DOORS MADE WITH ADHESNES AND COMPOSITE WOOD PRODUCTS WHERE POSSIBLE THAT DO NOT CONTAIN UREA FORMALDEHVDE Z EXISTING FLOOR PENEfRATIONS ALL E%ISTING AN� NEW UL RATED FLOOR SLAB PENETRATIONS FOR CONDUIT SHALL BE FULLV PACKED AND 11. WOODORIGINS: SEALEDINACCORDANCEWITHTHEAPPLICABLEBUILDWGANDFlRECODES. ALL WOOD UTILIZED ON THE JOB (SOLID WMBER AND TIMBER PANEL PRODUCTS PWS FINISHED WOOD) SHOULD ORIGINATEFROMREGIONSAOLURCESANDFROMCERTIFlEDANDSUSTAINABLESOURCES(SUCHASSUSTAINABLE e. OUTLETFINISHES PoRESTRY INITIATNE, CSA, FORESTRV STEWARDSHIP COUNCIL, OR AMERICAN TREE FARM SYSTEMS). REFER TO FlNISH PLAN PoR OUTLET AND SWITCH COVERPLATE FlNISH. VERIFY SELECTION AND CHOICE WITH THE ARCHITECT PRIOR TO ORDERING MATERIALS. 12. ADHESIVES & SEALANTS: THEVOCCONTENTOFADHESNESANDSEALANTSUSEDSHALLBELESSTHANTHECURRENTVOCCONTENTLIMITS 9. ELECTRICALCOORDINATION OFSOUTHCOASTAIRQUALITVMANAGEMENT�ISTRICT(SCApMD)RULE#1168,ANDALLSEALANTSUSEDAS COORDINATENEWELECTRICALWITHEXISTING,WHEREOCCURS. FlLLERS SHALL MEET OR E%CEED THE REQUIREMENT50 F THE BAV AREA AIR QUALITV MANAGEMENT DISTRICT REGULATION 8, RULE 51. l0. OOTLET LAVOLIT UPON COMPLETION OF OUTLEf LAYOUT, NOTIFY THE ARCHITECT. ARCHITECT SHALL SITE VERIFY ALL OUTLET LOCATIONS PRIOR TO COMMENCEMENT OF CORING OR OUTLEf INSTALLATION. G G TO PROVIDE AND INSTALL REFLECTED CEILING PLAN NOTES COVER PLATES FOR ALL WALL MOUNTED ELECTRICAL AND COMMUNICATIONS OUTLETS. 11. ULRATEDASSEMBLIES 1. COORDINATION COORDINATE THE WORK OF ALL TRA�ES INVOLVED IN THE CEILING WORK TO INSURE 0.EARANCES PoR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SVSTEM, ETG, NECESSARV TO MAINTAIN THE FINISHED CEILING HEIGHTS. SEE REFLECTED CEILING PLANS FOR FINISHED CEILING HEIGHTS. VERIFY W FIELD. FURNISH AND INSTALL UNDERWRITERS LABORATOPoES, ING (UL) LABELE� DEVICES THROUGHOUT. 1. LOCKSETS ALL LOCKSETS SHALL HAVE LIPS OF SUFFIQENT LENGTH TO CLEAR TRIM AND PROTECT CLOTHING. 2. COORDINATION GENERAL CONTRACTOR TO COOR�INATE HAR� WARE PURCHASE, SPECI FICATION, AND INSTALLATION W ITH BUILDMG MANAGEMENT. 3. KEVING KEVING OF CYLINDER LOCKS SHALL BE COORDINATED WITH THE OWNER, FOR ESTIMATE USE GRAN�MASTER KEVING CHARGE UNDER OWNER'S DIRECTION, KEY TO NEW OR EXISTING SYSTEM TO BE APPROVED eV OWNER'S REPRESENTATNE IN WRITING. FURNISH CONSTRUCTION KEY SVSTEM WITH KEVS WHICH CAN BE RENDERED INOPERATIVE BV THE TURN OFTHE CHANGE KEV. STAMP ALL KEVS "DO NOT DUPLICATE". FOR PROTECTION OF THE OWNER, ALL LOCKS AND CYLINDERS SHALL BE KEVED AT THE FACTORV OF THE LOCK MANUFACTURER W HERE PERMANENT RECOR�S ARE MAINTAINED. 4.HINGES FURNISH TWO PAIR HINGES PER LEAF, U.O.N. FURNISH HINGES WITH STAWLE55 STEEL PINS AND CONCEALED BEARINGS. SIZE LISTED IN HARD WARE SETS INDICATE HEIGHT. 5. SILENCERS FURNISH SILENCERS FOR ALL INTERIOR FRAMES' 3 FOR SINGLE DOORS, 4 FOR PAIR OF DOORS. OMIT WHERE SOUND OR LIGHT SEAL OCCURS. 6.LOCKS LOCK TO BE 30' FROM BOTTOM OF DOOR TO CENTER OF LEVER U.N.O. INSTALLATION'. A. INSTALL EACH HARDWARE ITEM PER MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS. DO NOT INSTALL SURFACE MOUNTED ITEMS UNTIL FINISHES HAVE BEEN COMPLEfED ON THE SUBSTRATE. SET UNITS LEVEL, P W MB, AND TRUE TO LINE AND LOCATION. ADJUST AND RE W FORCE THE ATTACHMENT SUBSTRATE AS NECESSARY PoR PROPER INSTALLATION AND OPERATION. B. ADJUST AND CHECK EACH OPERATWG ITEM OF HARDWARE AND EACH DOOR TO ENSURE PROPER OPERATION OR FUNCTION OF EVERY UNIT. REPLACE UNITS WHICH CANNOT BE ADJUSTED TO OPERATE FREELY AND SMOOTHLV. Z FAILSAFE ALL ELECTROMAGNETIC HARDWARE SHALL BE FAILSAFE AND TIED INTO THE LIFE SAFETY SVSTEM. SEE DOOR SCHEDULE, HARDWARE GROUPS AND SEQUENCE OF OPERATION FOR COMPLETE OPERATION. 8 ELECTRONIC HARDWARE ALL EXIT �OORS SCHEDULED WITH ELECTRONIC HARDWARE SHALL UNLOCK UPON THE ACTUATION OF A LIFE SAFETV DEVICE ALL DOORS REQUIRED AS EXITS WITH ELECTRONIC HARDWARE UNLOCK UPON THE LOSS OF POWER CONTROLLING THE LOCK OR LOCK MECHANISM. ALL DOORS REQUIRED AS EXITS WITH ELECTRONIC HARDWARE SHALL HAVE THE CAPABILITV OF BEING UNLOCKED BV A SIGNAL FROM THE FlRE COMMAND CENTER IN HIGHRISE BUILDINGS WHERE APPLICABLE SEE �OOR SCHEDULE, HARDWARE GROUPS AND SEQUENCE OF OPERATION FOR COMPLEfE DESCRIPTION. 9. DELAYED EGRESS ELECTRIC HARDWARE EMERGENCV LIGHTING AN� AUDBLE ALARM SHALL BE PROVIDED AT ALL DOORS REQUIRED AS E%ITS W ITH DELAVE� EGRE55 ELECTRIC HAR�WARE. ALARM SHALL NOTIFV TENANT FLOOR AND CUSTOMER'S BURGLAR ALARM SVSTEM. 1. FINISHES 1. BLOCKING NOPAINTINGORINTERIORFINISHINGSHALLBE�ONEUNDERCONDITIONSWHICHWILLJEOPARDIZETHE ALLBLOCKINGRE UIREDSHALLBESCRIBEDTOWALLORCEILINGG.GTOCHECKJOBPROGRESSAND Q QUALITVORAPPEARANCEOFSUCHWORK.ALLWORKMANSHIPWHICHISJUDGEDLESSTHANFlRSTQUALITYBV COORDINATEWITHOTHERTRADESINVOLVED.G.C.ISRESPONSBLEFORALLBLOCKINGREQUIRED;UNDERNO THE ARCHITECT W ILL BE REJECTED. CIRCUMSTANCES WIL V'EXTRA" WORK BE AUTHOPoZED FOR EXTRA BLOCKING. 2. COLOR SELECTION 2 SHOP DRAWINGS ALL W LORS ARE TO BE SELECTED BY THE ARCHITECT, U.O.N. THE GL. SHALL SUBMIT SHOP DRAW INGS AN� SAMPLES TO THE ARCHITECT FOR REVIEW. 3. RNISH PREPARATION 3. FIELD CONDITIONS ALLSURFACESSHALLBEPREPARE�TORECEIVETHESCHE�ULEDFINISHPERMANUFACTURERS' PRIORTOTHESTARTOFFABRICATION,THEGL.SHALLCHECKANDVERIFVALLDIMENSIONSANDCONDITIONSAT RECOMMEN�ATIONS. ALL GVPSl1M BOARD PARTITIONS SHALL BE TAPED AND SANDED SMOOTH. PAINT GRADE JOB SITE AND SHALL BE RESPONSIBLE FOR SAME. WOO�WORK SHALL BE HAND SANDE� BETWEEN COATS AND DUSTED CLEAN. ALL HOLES. PITCH POCKETS. OR SAPPV PORTIONS SHALL BE SCRAPED AND SEALED WITH KNOT SEALER. NAIL HOLES, CRACKS, OR �EFECTS SHALL 4. IJO NERy BE PUTTIED AFTER FIRST COAT, W ITH PUTTV MATCH W G COLOR OF STAIN WHERE MEMBERS ARE MRERED OR BUTTED, THEV SHALL BE JO WED AND SECURED IN A MANNER TO INSURE OR PAINT FlNISH. REMOVE OIL OR GREASE WITH MINERAL SPIRITS. AGAINST THE JOINT OPENING. ALL CRACKS, HOLES, IMPERFECTIONS IN EXISTING WALLS, PARTITIONS, OR GYPSUM WALLBOARD SHALL BE i FABRICATION FlLLEDWITHPATCHINGPLASTERANDSMOOTHE�OFFTOMATCHADJOININGSURFACES. ALLOFTHEWORKSHALLBEFABRICATED,ASSEMBLED,FINISHED,ANDERECTEDINTHEBESTMETHODKNOWNTO THE CABINET TRADE. SURFACES SHALL BE TRUE, STRAIGHT, AND FREE FROM ALL MACHINE AND TOOLS INTERIORGVPSUMWALLBOAR�SURFACESSHALLBEWIPEDWITHADAMPCLOTHJUSTPRIORTOAPPLICATION MARKWGS,BRUISES,INDENTATIONS,CHIPS,ORABRASIONS. OF THE FlRST COAT, IN ORDER TO LAY RAT ANV NAP WHICH MAV HAVE PoRMED W SANDING PROCESS. 6. FlELD VERIFlCATION WHEREAPPLICABLEE%ISTINGPLASTERANDCONCRETESTRUCTURESCHEDULEDTOBEE%POSEDSHALLBE ITSHALLBETHEG.C'SRESPONSIBILITYTOHAVEEXAMWEDTHEJOBSREINCONJUNCTIONWITHTHEPROJECT FlNISHE� TO PROVIDE A LEVEL 3 FlNISH UNO. DOCUMENTS SO AS TO BE SATISFlED AS TO THE CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED, WCWDING SUCH MATTERS AS UNLOADING FACILITIE$ LOCATIONS AND SIZES OF ELEVATORS,EQUIPMENT, OR 4. WORK AREA CLEAN UP FACILITIES NEEDED PRELIMINARV TO AND DURING THE WORK, AND OTHER CONDITIONS WHICH MAY AFFECT THE UPONCOMPLETION,REMOVEALLPAINTFROMWHEREITHASSPILLED,SPLASHED,ORSPLATTEREDONEXPOSED WORK. SURFACES. ].PROTECTION 5. STAINING VENEER THE G.0. SHALL MAINTAIN REASONABLE PROTECTION TO SAFEGUARD HIS WORK FROM DAMAGE AND TO PROTECT ALL VENEER STAINS SHALL HAVE UNIFORM COLOR. BUILDING OWNER'S PROPERTY FROM INJURV OR LOSS ARISWG IN CONNECTION WITH ALL PROJECT WORK. 6. TOIICH UP 8. GUARANTEE EXAMWEALLFINISHSURFACESAFTERCOMPLETIONOFWORK,WCLUDINGWOODFLOORINGANDMILLWORK THEG.C.SHALLGUARANTEETHATALLMATERIALSANDWORKMANSHIPSHALLBEOFTHEQUALITVSPECIFlED INSTALLATION, AND PROCEED W ITH'TOUCH-UP" AS REqUIRED. AND SHOWN AND THAT ANV DEFECT DUE TO IMPROPER WORKMANSHIP OR MATERIALS DISCOVERED AND MADE KNO WN W ITHIN ONE VEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OF THE INSTALLATION SHALL BE ]. FINISH APPROVAL REPAIRED OR REPLACED W ITH REASONABLE PROMPTNESS W ITHOUT ADDITIONAL COST. ARCHRECT W ILL GNE PROVIDEARCHITECTWITHAMINIMUMOF(3)8"%10"BRUSH�OUTSOFEACHCOLORANDFINISHFORARCHITECT'S NOTICEOFSUCHOBSERVEDDEFECTSWITHREASONABLEPROMPTNESS. APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION. ON-SITE APPLICATION WILL BE REQUIRED ONE WEEK PRIORTOFINALAPPROVAL.ARCHITECTRESERVESTHERIGHTTOADJUSTANVCOLOR/FINISHONCETHEWALL 9.INSTALLATION TEST HAS BEEN MADE. G.G SHALL SHIM AND LEVEL COUNTERTOPS ABOVE FlLES AFTER FlLES ARE INSTALLED BY OTHERS FlLES IN OPERATIONS AREA TO BE SHIMMED AND SECURED TO MILLW ORK AFfER THEV ARE SET IN PLACE. G.C. TO LEVEL PRIOR TO SITE APPLICATION, PROVIDE ARCHITECT WITH B" X 10" SAMPLE CUTTINGS FROM ACTUAL DVE LOTS OF FLOOR UN�ER FlLES IN ALL AREAS WHERE FlLES ARE GANGED OR INSTALLED BELOW FI%ED CABINETRY. ALLSPEpFlEDWALLCOVERINGSFORARCHITECT'SAPPROVALANDPROVIDEE%PECTEDDELIVERVDATETOJOB (PLASTICLAMINATEDSHIMSASREQUIREDATFlLECABWEfAREA). SITE. 10. FINISH e. SOFFITS ALL MILLWORK SHALL RECBVE FlNAL FlNISH AT THE SHOP OR FACTORY PRIOR TO DELNERV. G.G SHALL PROTECT UNDERSIDEOFSOFFlTS(WHEREOCCURS)TORECENEAFlNISHTOMATCHADJACENNERTICALFlNISH,U.O.N. ALLFINISHEDANDINSTALLEDMILLWORKFROMDAMAGEBVOTHERTRADES.DAMAGEDORDEFECTIVEMILLWORK 9. DELNERV LEAD TIME CONTRACTOR SHALL BE RESPONSIBLE PoR ALLOWING PoR DELNERY LEAD TIMES PoR ALL FABRICS AND OTHER 11. COORDINATION WSTOMRNISHESWITHINTHECONSTRUCTIONSCHEDULEALL�ELNERVTIMESMUSTBECONFIRMED,ANDANY MILLWORKCONTRACTORTOCOORDINATELOCATIONOFELECTRICAL,TELEPHONE,ANDCOMMUNICATIONS "12MOUNTINGHEIGHTS EXCESSNELEADTIMEMUSTBEBROUGHTTOTHEARCHITECT'SATTENTIONIMME�IATELVTOALLOWFORRE- OUTLETSANDINSTALLGROMMETSINCOUNTERTOPSURFACESASREQUIREDTOCONCEALCABLES. INSTALLWALLMOUMEDOUTLETS181NCHESABOVEFlNISHEDFLOOR,U.O.N.HEIGHTSSHALLBEDETERMWED 10.DOORHANDLES SPECIFlCATIONIFNECESSARY. FROM FINISHED FLOOR TO THE CENTERLME OF COVERPLATE, INSTALLED VERTICALLV, GROUNDING POLE AT ALL DOORS WITH LOCK SETS AND LATCH SETS SHALL HAVE A LEVER HANDLE 12 SHELVING BOTTOM, U O.N. OUTLETS MOUNTED HIGHER THAN D" SHALL BE INSTALLED HORIZONTALLV, GROUNDING POLE AT 10. FLOOR SURFACE MODIFICATIONS NO UNBRACED LENGTH OF SHELVING AND OR COUMER WORK SHALL EXCEED 3'-0" WITHOUT A�DITIONAL LEFT, U.O.N. FOURPLEX OUTLETS TO BE INSTALLED VERTICALLV, U.ON. 11. MOUNTING HEIGHTS MODIFV EXISTING FLOOR SURFACES AS REQUIRED TO INSTALL NEW FLOORING MATERIALS, THUS PREVENTING SUPPORTS AND OR BLOCKING. ALL EN� CONDITIONS SHALL BE PROPERLV BLOCKED AND OR SUPPORTE�. HAND-ACTIVATEDDOOROPENINGHARDWAREMUSTBEMOUNTEDBETWEEN30AND441NCHESABOVEFlNISH NOTICEABLELUMPSORDEPRESSIONS. �3. HORIZONTALCLEARANCES FLOOR. 13.OVERHEADCABWEfS MAINTAIN A 4-INCH HORIZONTAL CLEARANCE IN ALL DIRECTIONS, MIN. FROM E�GE OF COVERPLATE, FOR WALL 1 L FlNISHES ALL BLOCKING AND WOOD CLEATS FOR OVERHEAD CABMETS TO BE SCRE WED AND SECURED TO FULL HEIGHT OR MOUNTED OUTLETS, OR FROM EDGE OF MONUMENT FOR FLOOR MOUNTED OUTLEfS, WHEN ADJACENTTO A WALL, �p, DOOR HARDWARE SEE FINISH PLAN, ELEVATIONS, AND �ETAILS FOR CL4RIFICATION OF EXTENT OF FINISH MATERIALS. BRACED CEILING HEIGHT METAL STUDS AND WOOD GROUN�S. COWMN,ORSIMILARELEMENTS,U.O.N. DOORHARDWARESHALLBEOPERABLEWITHASINGLEEFFORTWITHOUTREQUIRINGTHEABILITVTOGRASPTHE 12JOWTSSTAWE�ANDPAMTEDSl1RFACESSHALLBEFlNI5HED5UCHTHATJ0INTSARENOTVISIBLEWHEN HARDWARE(LEVERORPUSHTVPEISACCEPTABLEPERLOCALJURISDICTIONCO�EDEFINEDCRITERIA) VIEWEDFROMANYREASONABLEANGLE. 14.WOO�ORIGINS'. 14. DIMENSIONS ALL WOOD UTILIZEO ON THE JOB (SOLID W MBER AND TIMBER PANEL PRODUCTS P W S FINISHED WOOD) SHALL INDICATE�DIMENSIONSARETOTHECENTEROFTHECOVERPLATEORMONUMENT;CWSTERSOFOUTLETSARE �3.CARDREA�ERS 13.FLOORFINISHES ORIGINATEFROMREGIONALSOURCESANDFROMCERTIFlEDAN�SUSTAINABLESOURCES(SUCHASSUSTAINABLE DIMENSIONEDTOTHECENTEROFTHECLUSTER,U.O.N;GANGCOVERPLATESSHALLBEONE-PIECETYPE,UAN. CARDREADERDEVICESTOBEPROVI�EDASREFERENCEDINDOORSCHEDULE.ALLDEVICESANDINSTALLATION ALLINTERSECTIONSOFFLOORFlNISHMATERIALSSHALLBELOCATE�DIRECTLVUNDERCENTEROFDOOR,WHERE FORESTRVINITIATIVE,CSA,FORESTRVSTEWAR�SHIPCOUNQL,ORAMERICANTREEFARMSVSTEMS). SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES. SEE DOOR SCHEDULE. HARDWARE GROUPS AND OCCURS, UA.N. "I5. CABINETRV SEQUENCE OF OPERATION FOR COMPLETE DESCRIPTION. 15. ADHESIVES & SEALANTS: OUTLETS INSIDE AND/OR ATTACHED TO CABINETRV SHALL BE FURNISHED AND INSTALLED TO MATCH SIMILAR 14. CABINETRV THE VOC CONTENT OF ADHESNES AND SEALANTS USED SHALL BE LE55 THAN THE CURRENT VOC CONTENT CONDITIONSSUCHASWALL,FLOOR,ANDTHELIKEFURNISHANDINSTALLBOXEXTENSIONOROTHER ALLOPENCABINETRVSHALLBEPLASTICLAMINATEONALLE%POSEDSURFACES,U.O.N.APPLVWHITEMELAMINE LIMITSOFSOUTHCOASTAIRQUALITVMANAGEMENTDISTRICT(SCAQMD)RULE#1168,AN�ALLSEALANTSUSED APPROPRIATE DEVICES AS REQUIRED. ADJACENT OUTLETS SHALL NOT BE GREATER THAN 6" 0 C. APART, U 0 N. TO WTERIOR OF CABINETRV W ITH DOORS AND �RAW ERS, UDN. AS FlLLERS SHALL MEET OR EXCEED THE REQUIREMENTS OF THE BAY AREA AIR QUALITV MANAGEMENT DISTRICT REGULATION 8, RULE 51. 2 PERIMEfERCEILINGANGLES PERIMETER CEILING ANGLE, W HERE OCCURS, SHALL BE INSTALLED TIGHT TO VERTICAL SURFACE$ FREE FROM CURVES, BREAKS, OR OTHER IRREGULARITIES, AND PAINTED TO MATCH CEILMG FlNISH. 3. FlXTURETRIM FURNISH AND INSTALL ALL FlXTURES, ASSOCIATED TRIM, FlXTURE LAMPS, AND SEISMIC BRACMG AS REQUIRED. 4. FIXTURE LOCATIONS LIGHT FlXTURE$ EXIT SIGNS, SPRWKLERS, AND OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TLLE, U.O.N. ALL SW ITCHES AND DIMMERS SHALL BE LOCATED 48" ABOVE FINISHED FLOOR TO CENTER OF SW ITCH, U.0 N. MULTIPLE SWRCHES AT ONE LOCATION SHALL BE GANGED TOGETHER AND FlNISHED WITH ONE COVER PLATE, LLO.N. 5. CEILING ACCESS PROVIDE CEILING ACCESS AS REQUIRED PoR EQUIPMENT AND SVSTEM MAINTENANCE, AND MATCH ADJACENT CEILING FINISH, U.O.N. 6. SOFFlTSAN�CEILINGHEIGHTSDIMENSIONS ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF FINISHED FLOOR TO BOTTOM OF FINISHED GYPBOARD OR CEILING TILE AND SHALL ALLO W FOR THICKNESS OF ALL FLOOR FlNISHES. ]. COORDINATION THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT TVPES, LIGHT FlXTURES, SWITCH LOCATIONS, AND ASSOqATED ITEMS. REFER TO ENGMEERING DRAWING (LIGHTING PLAN) PoR CIRCUITING, WIRING LAYOUT, AND ADDITIONAL INFORMATION. S. DISCREPANGES IN THE EVENT OF DISCREPANCIES BEf WEEN THE ARCHITECT'S REFLECTED CEILING PLAN AND THE ENG W EER'S LIGHTING PL4N, IMMEDIATELV NOTIFVTHE ARCHITECT IN WRITING BEFOREORDERING MATERIALS OR PROCEEOWG WITH WORK. 9. PLENl1M ALL SPECIRC MPoRMATION CONCERNING MSTALLATION OF VARIOUS ABOVECEILING ELEMENTS ARE TO BE FOUND IN THE HVAC, PLUMBING, FIRE PROTECTION, ELECTRICAL, AND LIGHTING DRAW INGS. 10. CONFLICT NOTIFV ARCHITECT OF ANV CONFLICTS OF LIGHT FI%TURE LOCATIONS WITH MAIN RUNNERS, DUCTS, STRIICTURES, HVAC, AN�/OR (E)CONDUIT, PRIOR TO FRAMING FOR LIGHTS. ANV DISCREPANCIES BETWEEN ARCHITECTS CEILING GRID LOCATION AN� ACTUAL FlELD CONDITIONS ARE TO BE CLAPoFlED WITH THE ARCHITECT PRIOR TO FRAMING. 11. FIXTURE LAVOUT SUBMIT GRILLE, SPR W KLER, THERMOSTAT, AND OTHER FIXTURE AND ELEMENT LAVOUTS TO THE ARCHITECT FOR REVIEW AT LEAST 2 WEEKS PRIOR TO INSTALLATION. 12 FIELDVERIFICATIONOFWORK VERIFV FIELD CONDITIONS AND LOCATIONS OF ALL P W MBING, MECHANICAL DUCTS, STRUCTURAL ELEMENTS, AND ANY AND ALL OTHER APPLICABLE ITEMS; INSTALL APPLICABLE NEW PLUMBING, MECHANICAL FANS, DUCTS, CONDUITS, AND OTHER RELATE� AND APPURTENANT ITEMS SO AS TO NOT CONFLICT W ITH W MINARIES AN� ANY AND ALL FlELD CONDITIONS. 13. ULRATEDASSEMBLIES FURNISH AND INSTALL UNDERWRITERS LABORATORIES W G(UL) LABELED DEVICES THROUGHOUT. 1Q LIGHTINGFI%TURES INSTALL LIGHT FIXTURES W ITH PROTECTNE FlLM OR SIMILAR COVER OVER LOUVER, LENS. BAFFLE, AND THE LIKE, TO AVOID FlXTURE SOILING OR DAMAGE; FlXTURES SHALL BE MAINTAWED CLEAN AND AS NEW; LAMPS SHALL BE NEW AT PROJECT COMPLETION. 15. LIFESAFETVDEVICES REFER TO ENGINEERING DRAW INGS FOR ALL LIFE SAFEfV DEVICES REpUIRE� BV CODE AND ALL EMERGENCV LIGHT FlXTURES. ARCHITECTURAL DRAWINGS SHALL GOVERN LOCATION OF THESE DEVICES. COORDINATE LOCATION OF �EVICES WITH ALL ARCHITECTURAL oOCUMENTS PRIOR TO INSTALLATION OF BACK BOXES. REVIEW ALL ARCHITECTURAL AND ENGINEERING DOCUMENTS AND NOTIFV ARCHITECT OF ANV CONFLICTS. GENERAL CONTRACTOR TO COORDINATE AND VEPoFV LOCATIONS OF EXISTING DEVICES TO REMAIN W ITH ARCHITECTURAL PLANS AND NOTIFV ARCHITECT OF ANV CONFLICTS DURING THE ROUGH-IN PHASE OF PROJECT. 16. WALLSWITCHLOCATIONS TO BE COORDINATED WITH FURNITURE AND WALL MOUNTED EDUIPMENT LOCATIONS PRIOR TO BOX ROUGH-MS. NOTIFV ARCHITECT OF ANV CONFLICTS PRIOR TO INSTALLATION OF ROUGH-INS. 17. ENGMEERING DOCUMENTS REFER TO ENG W EERING PLANS FOR ADDITI ONAL NOTES AND SPECIFICATI ONS. 18. SUSPENDEDCBLINGGRIDLAYOUT CENTER FULL TILES IN ROOM IN BOTH DIRECTIONS AS INDICATED ON DRAW INGS UNLE55 DIMENSIONED OR NOTED OTHERWISE. RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel r �un��V l�rcNal�l,��' � DATE: OH�Z5 2O l6. PANELBOARDS CIRCUIT BREAKERS SHALL BE NEATLV TAGGED AND NUMBERE� BV G.C. TO CORRESPOND W ITH CIRCUITING OUTLME� ON ENGWEERING DRAWINGS. "I]. DATAANDRECEPTACLES ALL WALL MOUNTED �ATA AND VOICE RECEPTACLES TO HAVE 3/4" CONDUIT STUB UP AND TERMINATED 6" ABOVE HUNG CEILING. 18. MILLWORK THE G.G SHALL COORDINATE ANV ELECTRICAL WORK OR LIGHTING INSTALLATION INTO CABW Ef WORK IF AND AS REQUIRED. 19. PULL STRINGS G Q TO PROVIDE PULL STRINGS IN ALL EMPTV CONDUIT. 20. SLAB ON GRADE WHERE FLOOR OUTLETS ARE SHOWN AT SLAB ON GRADE LOCATIONS, SAW CUT AN� DEMO E%ISTING SLAB AS REQUIRED PoR NEW WORK. EXPOSE (E) SLAB REWPoRCING 1'-0" MIN. BACK FROM EA. SAWCUT. PROVIDE NEW SLAB RBNPoRCING TO MATCH EXISTING. REPAIR AND TAPE JOINTS AT VAPOR BARPoER WHERE ENCOUMERED. PROVI�E CRUSHE� AGGREGATE TO MATCH EXISTING. PROVIDE 3,�00 P51 CONCRETE. FINISH TO MATCH E%ISTING PER APPLICABLE AQ CRITERIA. 21. ABANDONE�CORE/FLOORPENETRATIONS ALL ABANDONED CORE AND ABnNDONED FLOOR PENETRATIONS THAT ARE NOT SCHE�ULED TO BE REUSED ARE TO BE REMOVED. FLOOR TO BE REPAIRED AS REQUIRED PER UL AND LOCAL CODE. 22 EXISTING LIFE SAFETV �EVICES GENERAL CONTRACTOR TO COORDINATE LOCATIONS OF EXISTING LIFE SAFETV DEVICES WITH ENGW EERING AND ARCHITECTURAL PLANS AND FURNITURE AND WALL MOUNTED EQUIPMENT. ALL �EVICES THAT ARE IN CONFLICTS W ITH CONSTRUCTION DOCUMENTS FURNITURE AND WALL MOUNTED EQUIPMENT ARE TO BE RELOCATED, NOTIFY ARCHITECTS IN WRITING TO CONFIRM NEW LOCATION PRIOR TO RELOCATION OF DEVICES. 23. ENGINEERWG DOCUMENTS REFER TO ENG W EERING PLANS FOR ADDITIONAL NOTES AND SPEQFICATIONS. 15. CARPETSEAMING PLAN SUBMIT CARPET SEAMING PLAN TO ARCHITECT PRIOR TO ORDERING AND AT LEAST (4) WEEKS PRIOR TO INSTALLATION PoR ARCHITECT'S REVIEW AN� APPROVAL. 16. EXISTING FINISHES EXISTWG FlNISHES IN BUILDING SERVICHCORE AREA TO REMAIN, UO.N. n. woao oaicws�. ALL WOOo UTILIZE� ON THE JOB (SOLID LUMBER AND TIMBER PANEL PRO�UCTS PLUS FlNISHED WOOD) SHALL ORIGINATE FROM REGIONAL SOURCES AND FROM CERTIFlE� AND SUSTAINABLE SOURCES (SUCH AS SUSTAINABLE FORESTRV INITIATIVE, CSA, FORESTRY STEWARDSHIP COUNQL, OR AMERICAN TREE FARM SVSTEMS). 18. ADHESNES & SEALANTS: THE VOC CONTENT OF ADHESIVES AND SEALANTS USED SHALL BE LE55 THAN THE CURRENT VOC CONTENT LIMITS OF SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT SCAQMD) RULE #1168, AN� ALL SEALANTS USED AS FILLERS MUST MEET OR EXCEED THE REQUIREMENTS OF THE BAV AREA AIR QUALITV MANAGEMENT DISTRICT REGULATION 8, RULE 51. 19. PAINT'. CONTRACTOR SHALL USE PA W T SPECIFlED BY ARCHITECT AND SHALL PROPERLV PREPARE ALL SURFACES TO RECENE ONE (1) PRIME COAT AND (2) FlNISH COATS (MIN) OF PAINT IN COLOR SPEQFlED BY ARCHITECT" PROVIDE ADDITIONAL PREPARATION AND FINISH PAINT COATS AS REQUIRED BV PAINT MANUFACTURER. REFER TO SPECIFICATION FOR ADDITIONAL W FORMATION. YUl•J_11J�LL1� W LW lq:ii[U:3�_FYI�P] W_\Ii�I�]Jlili9JF9:FYNiliRll�a�UbY11:bYOlOI[U�6YIIq�A 2L EXTRA MATERIALS: FURNISH EXTRA MATERIALS DESCRIBED IN CONTRACT �OCUMENTS THAT ARE FROM THE SAME PRODUCTION RUN (BATCH MI%) AS MATERIALS APPLIED AND ARE PACKAGED FOR STORAGE, I�ENTIFIED W ITH L4BELS DESCRIBING CONTENTS. STORE IN LOCATION MAINTAINING AN AMBIENT TEMPERATURE OF NOT LESS THAN 45 DEGREESF. -QUANTITV-. FURNISH AN ADDITIONAL (5) PERCENT OF EACH MATERIAL AND COLOR SPECIFlED. = 1.1 � INDUSTRIOUS COWORKING 880 W MONON GREEN BLVD CARMEL, IN 46032 OWNEPRENANT INDUSTRIOUS 215PARKAVES,4E1300 NEW YORK, NY 1 W03 ARCXITECT OF HECOPD NORX 325 N LASALLE Si- SOIiE SCO CHICAGO. IL 60654 PEiER.DUBWCmNORR-COM 312-0242400 MEP ENGINEER MEENGINEERS 29 WEST 38iH SiREEi, SiH FLOOR NEW YORK. NY 10018 CONiACi: BRIAN SHASSIAN BBIANSHASSIANC�.ME-ENGINEER$_COM JOHN HIGGINS JOHN.HIGGWS(�MEENGINEERS.COM �212J 44]-6]]0 PHONE LIGHTING DESIGNER REGENCY 9261 JOkDAN AVE CHAiSWORiH, CA 800-28d-202J ISSUE DATES REV. DAiE DESCRIPiION 06/OS/2020 DD3 06/18l2020 CDvI 0]/06/2020 CDv2 W/ V/2020 100%/PERMIT SEAL&SIGNATUNE BY CHECK BG PJ BC PJ eC Po BC PJ CARMEL CITY- 880 MONON GREEN PRQIECT NUMBER IND680MON DRAWING TITLE GENERALNOTES SCALE � � �Zii _ , i oii SHEET NUMBER G003 oF PROJECTNAME