HomeMy WebLinkAboutG003 General Notes1. DOORSCHEDULE
REFER TO DOOR SCHE�ULE FOR ALL DOOR/HARDWARE SPECIFlCATIONS.
1. OVERTIME WORK
WHEN FLOOR BELOW IS OCCUPIED PRICE EXTENSIVE FLOOR SLAB PENETRATIONS AND/OR CORING ON AN
OVERTIME BASIS.
2 FIELD MEASURE
FIELD MEASURE FLOOR TO CEILING DOORS FOR PROPER FIT. ALL CORE AND/OR FLOOR TRENCHING FOR TELEPHONE/ELECTRICAL CON�UITING SHALL BE PERFORME� AFTER
HOURS AS REQUIRED AN� COORDINATED WITH BUILDING OWNER PoR APPROVAL.
3. SLOPE
EXTERIORLEVELLANDINGMAVSLOPEUPT01/4"PERFOOTMA%.INANVDIRECTIONFORSURFACEDRAINAGE 2 COORDINATIONOFTHEWORK
SURVEV FlELD CONDITIONS AND VERIFY THAT WORK IS FEASIBLE AS SHOWN. VERIFY LOCATION OF FLOOR
4. THRESHOLDS OURETS AND OTHER OURETS IN RELATION TO STRUCTURAL
THEFLOORORLANDINGSHALLNOTBEMORETHANI/2"LOWERTHANTHETHRESHOLDOFTHEDOORWAY.BEVEL AN�OTHERELEMENTSASREQUIRED.NOTIFVARCHITECTINWRITINGOFANV�ISCREPANCIESBEFORE
(12 MAX. SLOPE) WHERE THE THRESHOLD EXCEEDS 1/4" IN HEIGHT. PROCEEDING WITH WORK.
5. DOOROPENINGS ELECTRICALSWITCHANDOUTLETCOVERPLATES,SURFACEHARDWARE,ETC.,SHALLBEINSTALLE�AFTER
DOOROPENINGSINPARTITIONSNOTDIMENSIONEDARETOBELOCATEDWITHIN4"OFADJOININGPARTITION, PAINTINGAND/ORAPPLICATIONOFWALLCOVERWGSANDCARPETSPECIFlED.
U.O.N.
6. GLASS
ALL GLASS IN DOORS SHALL BE TEMPERED SAFETV GLASS, UD.N.
7. HOLLOWMETALDOORS
HOLLOW METAL DOORS SHALL BE FINISHED WITH SEMI-GLOSS PAINT. REFER TO FINISH SCHEDULE FOR AD�ITIONL
WFORMATION.
8. EXITCORRI�ORS
DOORS OPENING INTO REQUIRED EXIT CORRIDORS DO NOT RESTRICT THE REQUIRED WIDTH WHEN OPENED IN ANY
POSITION.
3. OUTLETLOCATIONS
ARCHITECTURAL DRAW WGS DETERMINE LOCATION AND TVPE (ARCHITECT TO VERIFV WITH ENGINEER) OF ALL
OUTLETS AND TAKE PRECEDENCE OVER ALL OTHERS, U.O.N. ELECTRICAL ENG W EER'S PO WER PLAN SHALL GOVERN
THE W IRING LAVOUT AN� INSTALLATION IN COMPLIANCE WITH ALL LAWS APPLICABLE AND ENFORCE� BV
GOVERNING AUTHORITIES.
4. WALLMOl1NTED0UTLETS
OUTLETS SHOWN BACK TO BACK ON PARTITION WALLS SHALL BE OFFSET 1'-0' MAXIMUM, OR MOUNTED AT
�IFFERENT HEIGHTS IF INDICATED.
5. �I@d.ITl1RELAVOUT
FURNITURE, IF SHO W N, IS FOR REFERENCE ONLY AND IS NOT IN CONTRACT, U.O.N.
9. DOORSWINGS
ALL DOORS REQUIRED AS EXRS SHALL SWING IN THE DIRECTION OF TRAVEL 6. EOUIPMENT COORDINATION
COORDINATE ALL W ORK RELATED TO EQUIPMENT W ITH MANUFACTURER'S RECOMMENDATIONS, SPECIFICATIONS,
10. WOODSPECIESFORDOORFACINGS AN�INSTRUCTIONS.
PROVIDE DOORS MADE WITH ADHESNES AND COMPOSITE WOOD PRODUCTS WHERE POSSIBLE THAT DO NOT
CONTAIN UREA FORMALDEHVDE Z EXISTING FLOOR PENEfRATIONS
ALL E%ISTING AN� NEW UL RATED FLOOR SLAB PENETRATIONS FOR CONDUIT SHALL BE FULLV PACKED AND
11. WOODORIGINS: SEALEDINACCORDANCEWITHTHEAPPLICABLEBUILDWGANDFlRECODES.
ALL WOOD UTILIZED ON THE JOB (SOLID WMBER AND TIMBER PANEL PRODUCTS PWS FINISHED WOOD) SHOULD
ORIGINATEFROMREGIONSAOLURCESANDFROMCERTIFlEDANDSUSTAINABLESOURCES(SUCHASSUSTAINABLE e. OUTLETFINISHES
PoRESTRY INITIATNE, CSA, FORESTRV STEWARDSHIP COUNCIL, OR AMERICAN TREE FARM SYSTEMS). REFER TO FlNISH PLAN PoR OUTLET AND SWITCH COVERPLATE FlNISH. VERIFY SELECTION AND CHOICE WITH THE
ARCHITECT PRIOR TO ORDERING MATERIALS.
12. ADHESIVES & SEALANTS:
THEVOCCONTENTOFADHESNESANDSEALANTSUSEDSHALLBELESSTHANTHECURRENTVOCCONTENTLIMITS 9. ELECTRICALCOORDINATION
OFSOUTHCOASTAIRQUALITVMANAGEMENT�ISTRICT(SCApMD)RULE#1168,ANDALLSEALANTSUSEDAS COORDINATENEWELECTRICALWITHEXISTING,WHEREOCCURS.
FlLLERS SHALL MEET OR E%CEED THE REQUIREMENT50 F THE BAV AREA AIR QUALITV MANAGEMENT
DISTRICT REGULATION 8, RULE 51. l0. OOTLET LAVOLIT
UPON COMPLETION OF OUTLEf LAYOUT, NOTIFY THE ARCHITECT. ARCHITECT SHALL SITE VERIFY ALL OUTLET
LOCATIONS PRIOR TO COMMENCEMENT OF CORING OR OUTLEf INSTALLATION. G G TO PROVIDE AND INSTALL
REFLECTED CEILING PLAN NOTES COVER PLATES FOR ALL WALL MOUNTED ELECTRICAL AND COMMUNICATIONS OUTLETS.
11. ULRATEDASSEMBLIES
1. COORDINATION
COORDINATE THE WORK OF ALL TRA�ES INVOLVED IN THE CEILING WORK TO INSURE 0.EARANCES PoR
FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SVSTEM, ETG, NECESSARV TO MAINTAIN THE FINISHED CEILING
HEIGHTS. SEE REFLECTED CEILING PLANS FOR FINISHED CEILING HEIGHTS. VERIFY W FIELD.
FURNISH AND INSTALL UNDERWRITERS LABORATOPoES, ING (UL) LABELE� DEVICES THROUGHOUT.
1. LOCKSETS
ALL LOCKSETS SHALL HAVE LIPS OF SUFFIQENT LENGTH TO CLEAR TRIM AND PROTECT CLOTHING.
2. COORDINATION
GENERAL CONTRACTOR TO COOR�INATE HAR� WARE PURCHASE, SPECI FICATION, AND INSTALLATION W ITH
BUILDMG MANAGEMENT.
3. KEVING
KEVING OF CYLINDER LOCKS SHALL BE COORDINATED WITH THE OWNER, FOR ESTIMATE USE GRAN�MASTER
KEVING CHARGE UNDER OWNER'S DIRECTION, KEY TO NEW OR EXISTING SYSTEM TO BE APPROVED eV OWNER'S
REPRESENTATNE IN WRITING. FURNISH CONSTRUCTION KEY SVSTEM WITH KEVS WHICH CAN BE RENDERED
INOPERATIVE BV THE TURN OFTHE CHANGE KEV. STAMP ALL KEVS "DO NOT DUPLICATE". FOR PROTECTION OF
THE OWNER, ALL LOCKS AND CYLINDERS SHALL BE KEVED AT THE
FACTORV OF THE LOCK MANUFACTURER W HERE PERMANENT RECOR�S ARE MAINTAINED.
4.HINGES
FURNISH TWO PAIR HINGES PER LEAF, U.O.N. FURNISH HINGES WITH STAWLE55 STEEL PINS AND CONCEALED
BEARINGS. SIZE LISTED IN HARD WARE SETS INDICATE HEIGHT.
5. SILENCERS
FURNISH SILENCERS FOR ALL INTERIOR FRAMES' 3 FOR SINGLE DOORS, 4 FOR PAIR OF DOORS. OMIT WHERE
SOUND OR LIGHT SEAL OCCURS.
6.LOCKS
LOCK TO BE 30' FROM BOTTOM OF DOOR TO CENTER OF LEVER U.N.O.
INSTALLATION'.
A. INSTALL EACH HARDWARE ITEM PER MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS. DO NOT
INSTALL SURFACE MOUNTED ITEMS UNTIL FINISHES HAVE BEEN COMPLEfED ON THE SUBSTRATE. SET UNITS
LEVEL, P W MB, AND TRUE TO LINE AND LOCATION. ADJUST AND RE W FORCE THE ATTACHMENT SUBSTRATE AS
NECESSARY PoR PROPER INSTALLATION AND OPERATION.
B. ADJUST AND CHECK EACH OPERATWG ITEM OF HARDWARE AND EACH DOOR TO ENSURE PROPER OPERATION
OR FUNCTION OF EVERY UNIT. REPLACE UNITS WHICH CANNOT BE ADJUSTED TO OPERATE FREELY AND
SMOOTHLV.
Z FAILSAFE
ALL ELECTROMAGNETIC HARDWARE SHALL BE FAILSAFE AND TIED INTO THE LIFE SAFETY SVSTEM. SEE DOOR
SCHEDULE, HARDWARE GROUPS AND SEQUENCE OF OPERATION FOR COMPLETE OPERATION.
8 ELECTRONIC HARDWARE
ALL EXIT �OORS SCHEDULED WITH ELECTRONIC HARDWARE SHALL UNLOCK UPON THE ACTUATION OF A LIFE
SAFETV DEVICE ALL DOORS REQUIRED AS EXITS WITH ELECTRONIC HARDWARE UNLOCK UPON THE LOSS OF
POWER CONTROLLING THE LOCK OR LOCK MECHANISM. ALL DOORS REQUIRED AS EXITS WITH ELECTRONIC
HARDWARE SHALL HAVE THE CAPABILITV OF BEING UNLOCKED BV A SIGNAL FROM THE FlRE COMMAND CENTER
IN HIGHRISE BUILDINGS WHERE APPLICABLE SEE �OOR SCHEDULE, HARDWARE GROUPS AND SEQUENCE OF
OPERATION FOR COMPLEfE DESCRIPTION.
9. DELAYED EGRESS ELECTRIC HARDWARE
EMERGENCV LIGHTING AN� AUDBLE ALARM SHALL BE PROVIDED AT ALL DOORS REQUIRED AS E%ITS W ITH
DELAVE� EGRE55 ELECTRIC HAR�WARE. ALARM SHALL NOTIFV TENANT FLOOR AND CUSTOMER'S BURGLAR
ALARM SVSTEM.
1. FINISHES 1. BLOCKING
NOPAINTINGORINTERIORFINISHINGSHALLBE�ONEUNDERCONDITIONSWHICHWILLJEOPARDIZETHE ALLBLOCKINGRE UIREDSHALLBESCRIBEDTOWALLORCEILINGG.GTOCHECKJOBPROGRESSAND
Q
QUALITVORAPPEARANCEOFSUCHWORK.ALLWORKMANSHIPWHICHISJUDGEDLESSTHANFlRSTQUALITYBV COORDINATEWITHOTHERTRADESINVOLVED.G.C.ISRESPONSBLEFORALLBLOCKINGREQUIRED;UNDERNO
THE ARCHITECT W ILL BE REJECTED. CIRCUMSTANCES WIL V'EXTRA" WORK BE AUTHOPoZED FOR EXTRA BLOCKING.
2. COLOR SELECTION 2 SHOP DRAWINGS
ALL W LORS ARE TO BE SELECTED BY THE ARCHITECT, U.O.N. THE GL. SHALL SUBMIT SHOP DRAW INGS AN� SAMPLES TO THE ARCHITECT FOR REVIEW.
3. RNISH PREPARATION 3. FIELD CONDITIONS
ALLSURFACESSHALLBEPREPARE�TORECEIVETHESCHE�ULEDFINISHPERMANUFACTURERS' PRIORTOTHESTARTOFFABRICATION,THEGL.SHALLCHECKANDVERIFVALLDIMENSIONSANDCONDITIONSAT
RECOMMEN�ATIONS. ALL GVPSl1M BOARD PARTITIONS SHALL BE TAPED AND SANDED SMOOTH. PAINT GRADE JOB SITE AND SHALL BE RESPONSIBLE FOR SAME.
WOO�WORK SHALL BE HAND SANDE� BETWEEN COATS AND DUSTED CLEAN. ALL HOLES. PITCH POCKETS. OR
SAPPV PORTIONS SHALL BE SCRAPED AND SEALED WITH KNOT SEALER. NAIL HOLES, CRACKS, OR �EFECTS SHALL 4. IJO NERy
BE PUTTIED AFTER FIRST COAT, W ITH PUTTV MATCH W G COLOR OF STAIN WHERE MEMBERS ARE MRERED OR BUTTED, THEV SHALL BE JO WED AND SECURED IN A MANNER TO INSURE
OR PAINT FlNISH. REMOVE OIL OR GREASE WITH MINERAL SPIRITS. AGAINST THE JOINT OPENING.
ALL CRACKS, HOLES, IMPERFECTIONS IN EXISTING WALLS, PARTITIONS, OR GYPSUM WALLBOARD SHALL BE i FABRICATION
FlLLEDWITHPATCHINGPLASTERANDSMOOTHE�OFFTOMATCHADJOININGSURFACES. ALLOFTHEWORKSHALLBEFABRICATED,ASSEMBLED,FINISHED,ANDERECTEDINTHEBESTMETHODKNOWNTO
THE CABINET TRADE. SURFACES SHALL BE TRUE, STRAIGHT, AND FREE FROM ALL MACHINE AND TOOLS
INTERIORGVPSUMWALLBOAR�SURFACESSHALLBEWIPEDWITHADAMPCLOTHJUSTPRIORTOAPPLICATION MARKWGS,BRUISES,INDENTATIONS,CHIPS,ORABRASIONS.
OF THE FlRST COAT, IN ORDER TO LAY RAT ANV NAP WHICH MAV HAVE PoRMED W SANDING PROCESS.
6. FlELD VERIFlCATION
WHEREAPPLICABLEE%ISTINGPLASTERANDCONCRETESTRUCTURESCHEDULEDTOBEE%POSEDSHALLBE ITSHALLBETHEG.C'SRESPONSIBILITYTOHAVEEXAMWEDTHEJOBSREINCONJUNCTIONWITHTHEPROJECT
FlNISHE� TO PROVIDE A LEVEL 3 FlNISH UNO. DOCUMENTS SO AS TO BE SATISFlED AS TO THE CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED,
WCWDING SUCH MATTERS AS UNLOADING FACILITIE$ LOCATIONS AND SIZES OF ELEVATORS,EQUIPMENT, OR
4. WORK AREA CLEAN UP FACILITIES NEEDED PRELIMINARV TO AND DURING THE WORK, AND OTHER CONDITIONS WHICH MAY AFFECT THE
UPONCOMPLETION,REMOVEALLPAINTFROMWHEREITHASSPILLED,SPLASHED,ORSPLATTEREDONEXPOSED WORK.
SURFACES.
].PROTECTION
5. STAINING VENEER THE G.0. SHALL MAINTAIN REASONABLE PROTECTION TO SAFEGUARD HIS WORK FROM DAMAGE AND TO PROTECT
ALL VENEER STAINS SHALL HAVE UNIFORM COLOR. BUILDING OWNER'S PROPERTY FROM INJURV OR LOSS ARISWG IN CONNECTION WITH ALL PROJECT WORK.
6. TOIICH UP 8. GUARANTEE
EXAMWEALLFINISHSURFACESAFTERCOMPLETIONOFWORK,WCLUDINGWOODFLOORINGANDMILLWORK THEG.C.SHALLGUARANTEETHATALLMATERIALSANDWORKMANSHIPSHALLBEOFTHEQUALITVSPECIFlED
INSTALLATION, AND PROCEED W ITH'TOUCH-UP" AS REqUIRED. AND SHOWN AND THAT ANV DEFECT DUE TO IMPROPER WORKMANSHIP OR MATERIALS DISCOVERED AND MADE
KNO WN W ITHIN ONE VEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OF THE INSTALLATION SHALL BE
]. FINISH APPROVAL REPAIRED OR REPLACED W ITH REASONABLE PROMPTNESS W ITHOUT ADDITIONAL COST. ARCHRECT W ILL GNE
PROVIDEARCHITECTWITHAMINIMUMOF(3)8"%10"BRUSH�OUTSOFEACHCOLORANDFINISHFORARCHITECT'S NOTICEOFSUCHOBSERVEDDEFECTSWITHREASONABLEPROMPTNESS.
APPROVAL AT LEAST 2 WEEKS PRIOR TO SITE APPLICATION. ON-SITE APPLICATION WILL BE REQUIRED ONE WEEK
PRIORTOFINALAPPROVAL.ARCHITECTRESERVESTHERIGHTTOADJUSTANVCOLOR/FINISHONCETHEWALL 9.INSTALLATION
TEST HAS BEEN MADE. G.G SHALL SHIM AND LEVEL COUNTERTOPS ABOVE FlLES AFTER FlLES ARE INSTALLED BY OTHERS FlLES IN
OPERATIONS AREA TO BE SHIMMED AND SECURED TO MILLW ORK AFfER THEV ARE SET IN PLACE. G.C. TO LEVEL
PRIOR TO SITE APPLICATION, PROVIDE ARCHITECT WITH B" X 10" SAMPLE CUTTINGS FROM ACTUAL DVE LOTS OF FLOOR UN�ER FlLES IN ALL AREAS WHERE FlLES ARE GANGED OR INSTALLED BELOW FI%ED CABINETRY.
ALLSPEpFlEDWALLCOVERINGSFORARCHITECT'SAPPROVALANDPROVIDEE%PECTEDDELIVERVDATETOJOB (PLASTICLAMINATEDSHIMSASREQUIREDATFlLECABWEfAREA).
SITE.
10. FINISH
e. SOFFITS ALL MILLWORK SHALL RECBVE FlNAL FlNISH AT THE SHOP OR FACTORY PRIOR TO DELNERV. G.G SHALL PROTECT
UNDERSIDEOFSOFFlTS(WHEREOCCURS)TORECENEAFlNISHTOMATCHADJACENNERTICALFlNISH,U.O.N. ALLFINISHEDANDINSTALLEDMILLWORKFROMDAMAGEBVOTHERTRADES.DAMAGEDORDEFECTIVEMILLWORK
9. DELNERV LEAD TIME
CONTRACTOR SHALL BE RESPONSIBLE PoR ALLOWING PoR DELNERY LEAD TIMES PoR ALL FABRICS AND OTHER 11. COORDINATION
WSTOMRNISHESWITHINTHECONSTRUCTIONSCHEDULEALL�ELNERVTIMESMUSTBECONFIRMED,ANDANY MILLWORKCONTRACTORTOCOORDINATELOCATIONOFELECTRICAL,TELEPHONE,ANDCOMMUNICATIONS
"12MOUNTINGHEIGHTS EXCESSNELEADTIMEMUSTBEBROUGHTTOTHEARCHITECT'SATTENTIONIMME�IATELVTOALLOWFORRE- OUTLETSANDINSTALLGROMMETSINCOUNTERTOPSURFACESASREQUIREDTOCONCEALCABLES.
INSTALLWALLMOUMEDOUTLETS181NCHESABOVEFlNISHEDFLOOR,U.O.N.HEIGHTSSHALLBEDETERMWED 10.DOORHANDLES SPECIFlCATIONIFNECESSARY.
FROM FINISHED FLOOR TO THE CENTERLME OF COVERPLATE, INSTALLED VERTICALLV, GROUNDING POLE AT ALL DOORS WITH LOCK SETS AND LATCH SETS SHALL HAVE A LEVER HANDLE 12 SHELVING
BOTTOM, U O.N. OUTLETS MOUNTED HIGHER THAN D" SHALL BE INSTALLED HORIZONTALLV, GROUNDING POLE AT 10. FLOOR SURFACE MODIFICATIONS NO UNBRACED LENGTH OF SHELVING AND OR COUMER WORK SHALL EXCEED 3'-0" WITHOUT A�DITIONAL
LEFT, U.O.N. FOURPLEX OUTLETS TO BE INSTALLED VERTICALLV, U.ON. 11. MOUNTING HEIGHTS MODIFV EXISTING FLOOR SURFACES AS REQUIRED TO INSTALL NEW FLOORING MATERIALS, THUS PREVENTING SUPPORTS AND OR BLOCKING. ALL EN� CONDITIONS SHALL BE PROPERLV BLOCKED AND OR SUPPORTE�.
HAND-ACTIVATEDDOOROPENINGHARDWAREMUSTBEMOUNTEDBETWEEN30AND441NCHESABOVEFlNISH NOTICEABLELUMPSORDEPRESSIONS.
�3. HORIZONTALCLEARANCES FLOOR. 13.OVERHEADCABWEfS
MAINTAIN A 4-INCH HORIZONTAL CLEARANCE IN ALL DIRECTIONS, MIN. FROM E�GE OF COVERPLATE, FOR WALL 1 L FlNISHES ALL BLOCKING AND WOOD CLEATS FOR OVERHEAD CABMETS TO BE SCRE WED AND SECURED TO FULL HEIGHT OR
MOUNTED OUTLETS, OR FROM EDGE OF MONUMENT FOR FLOOR MOUNTED OUTLEfS, WHEN ADJACENTTO A WALL, �p, DOOR HARDWARE SEE FINISH PLAN, ELEVATIONS, AND �ETAILS FOR CL4RIFICATION OF EXTENT OF FINISH MATERIALS. BRACED CEILING HEIGHT METAL STUDS AND WOOD GROUN�S.
COWMN,ORSIMILARELEMENTS,U.O.N. DOORHARDWARESHALLBEOPERABLEWITHASINGLEEFFORTWITHOUTREQUIRINGTHEABILITVTOGRASPTHE 12JOWTSSTAWE�ANDPAMTEDSl1RFACESSHALLBEFlNI5HED5UCHTHATJ0INTSARENOTVISIBLEWHEN
HARDWARE(LEVERORPUSHTVPEISACCEPTABLEPERLOCALJURISDICTIONCO�EDEFINEDCRITERIA) VIEWEDFROMANYREASONABLEANGLE. 14.WOO�ORIGINS'.
14. DIMENSIONS ALL WOOD UTILIZEO ON THE JOB (SOLID W MBER AND TIMBER PANEL PRODUCTS P W S FINISHED WOOD) SHALL
INDICATE�DIMENSIONSARETOTHECENTEROFTHECOVERPLATEORMONUMENT;CWSTERSOFOUTLETSARE �3.CARDREA�ERS 13.FLOORFINISHES ORIGINATEFROMREGIONALSOURCESANDFROMCERTIFlEDAN�SUSTAINABLESOURCES(SUCHASSUSTAINABLE
DIMENSIONEDTOTHECENTEROFTHECLUSTER,U.O.N;GANGCOVERPLATESSHALLBEONE-PIECETYPE,UAN. CARDREADERDEVICESTOBEPROVI�EDASREFERENCEDINDOORSCHEDULE.ALLDEVICESANDINSTALLATION ALLINTERSECTIONSOFFLOORFlNISHMATERIALSSHALLBELOCATE�DIRECTLVUNDERCENTEROFDOOR,WHERE FORESTRVINITIATIVE,CSA,FORESTRVSTEWAR�SHIPCOUNQL,ORAMERICANTREEFARMSVSTEMS).
SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES. SEE DOOR SCHEDULE. HARDWARE GROUPS AND OCCURS, UA.N.
"I5. CABINETRV SEQUENCE OF OPERATION FOR COMPLETE DESCRIPTION. 15. ADHESIVES & SEALANTS:
OUTLETS INSIDE AND/OR ATTACHED TO CABINETRV SHALL BE FURNISHED AND INSTALLED TO MATCH SIMILAR 14. CABINETRV THE VOC CONTENT OF ADHESNES AND SEALANTS USED SHALL BE LE55 THAN THE CURRENT VOC CONTENT
CONDITIONSSUCHASWALL,FLOOR,ANDTHELIKEFURNISHANDINSTALLBOXEXTENSIONOROTHER ALLOPENCABINETRVSHALLBEPLASTICLAMINATEONALLE%POSEDSURFACES,U.O.N.APPLVWHITEMELAMINE LIMITSOFSOUTHCOASTAIRQUALITVMANAGEMENTDISTRICT(SCAQMD)RULE#1168,AN�ALLSEALANTSUSED
APPROPRIATE DEVICES AS REQUIRED. ADJACENT OUTLETS SHALL NOT BE GREATER THAN 6" 0 C. APART, U 0 N. TO WTERIOR OF CABINETRV W ITH DOORS AND �RAW ERS, UDN. AS FlLLERS SHALL MEET OR EXCEED THE REQUIREMENTS OF THE BAY AREA AIR QUALITV MANAGEMENT DISTRICT
REGULATION 8, RULE 51.
2 PERIMEfERCEILINGANGLES
PERIMETER CEILING ANGLE, W HERE OCCURS, SHALL BE INSTALLED TIGHT TO VERTICAL SURFACE$ FREE FROM
CURVES, BREAKS, OR OTHER IRREGULARITIES, AND PAINTED TO MATCH CEILMG FlNISH.
3. FlXTURETRIM
FURNISH AND INSTALL ALL FlXTURES, ASSOCIATED TRIM, FlXTURE LAMPS, AND SEISMIC BRACMG AS REQUIRED.
4. FIXTURE LOCATIONS
LIGHT FlXTURE$ EXIT SIGNS, SPRWKLERS, AND OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF
INDIVIDUAL CEILING TLLE, U.O.N. ALL SW ITCHES AND DIMMERS SHALL BE LOCATED 48" ABOVE FINISHED FLOOR
TO CENTER OF SW ITCH, U.0 N. MULTIPLE SWRCHES AT ONE LOCATION SHALL BE GANGED TOGETHER AND
FlNISHED WITH ONE COVER PLATE, LLO.N.
5. CEILING ACCESS
PROVIDE CEILING ACCESS AS REQUIRED PoR EQUIPMENT AND SVSTEM MAINTENANCE, AND MATCH ADJACENT
CEILING FINISH, U.O.N.
6. SOFFlTSAN�CEILINGHEIGHTSDIMENSIONS
ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF FINISHED FLOOR TO BOTTOM OF FINISHED
GYPBOARD OR CEILING TILE AND SHALL ALLO W FOR THICKNESS OF ALL FLOOR FlNISHES.
]. COORDINATION
THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT TVPES, LIGHT FlXTURES,
SWITCH LOCATIONS, AND ASSOqATED ITEMS. REFER TO ENGMEERING DRAWING (LIGHTING PLAN) PoR
CIRCUITING, WIRING LAYOUT, AND ADDITIONAL INFORMATION.
S. DISCREPANGES
IN THE EVENT OF DISCREPANCIES BEf WEEN THE ARCHITECT'S REFLECTED CEILING PLAN AND THE ENG W EER'S
LIGHTING PL4N, IMMEDIATELV NOTIFVTHE ARCHITECT IN WRITING BEFOREORDERING MATERIALS OR
PROCEEOWG WITH WORK.
9. PLENl1M
ALL SPECIRC MPoRMATION CONCERNING MSTALLATION OF VARIOUS ABOVECEILING ELEMENTS ARE TO BE
FOUND IN THE HVAC, PLUMBING, FIRE PROTECTION, ELECTRICAL, AND LIGHTING DRAW INGS.
10. CONFLICT
NOTIFV ARCHITECT OF ANV CONFLICTS OF LIGHT FI%TURE LOCATIONS WITH MAIN RUNNERS, DUCTS,
STRIICTURES, HVAC, AN�/OR (E)CONDUIT, PRIOR TO FRAMING FOR LIGHTS. ANV DISCREPANCIES BETWEEN
ARCHITECTS CEILING GRID LOCATION AN� ACTUAL FlELD CONDITIONS ARE TO BE CLAPoFlED WITH THE
ARCHITECT PRIOR TO FRAMING.
11. FIXTURE LAVOUT
SUBMIT GRILLE, SPR W KLER, THERMOSTAT, AND OTHER FIXTURE AND ELEMENT LAVOUTS TO THE ARCHITECT FOR
REVIEW AT LEAST 2 WEEKS PRIOR TO INSTALLATION.
12 FIELDVERIFICATIONOFWORK
VERIFV FIELD CONDITIONS AND LOCATIONS OF ALL P W MBING, MECHANICAL DUCTS, STRUCTURAL ELEMENTS,
AND ANY AND ALL OTHER APPLICABLE ITEMS; INSTALL APPLICABLE NEW PLUMBING, MECHANICAL FANS, DUCTS,
CONDUITS, AND OTHER RELATE� AND APPURTENANT ITEMS SO AS TO NOT CONFLICT W ITH W MINARIES AN�
ANY AND ALL FlELD CONDITIONS.
13. ULRATEDASSEMBLIES
FURNISH AND INSTALL UNDERWRITERS LABORATORIES W G(UL) LABELED DEVICES THROUGHOUT.
1Q LIGHTINGFI%TURES
INSTALL LIGHT FIXTURES W ITH PROTECTNE FlLM OR SIMILAR COVER OVER LOUVER, LENS. BAFFLE, AND THE
LIKE, TO AVOID FlXTURE SOILING OR DAMAGE; FlXTURES SHALL BE MAINTAWED CLEAN AND AS NEW; LAMPS
SHALL BE NEW AT PROJECT COMPLETION.
15. LIFESAFETVDEVICES
REFER TO ENGINEERING DRAW INGS FOR ALL LIFE SAFEfV DEVICES REpUIRE� BV CODE AND ALL EMERGENCV
LIGHT FlXTURES. ARCHITECTURAL DRAWINGS SHALL GOVERN LOCATION OF THESE DEVICES. COORDINATE
LOCATION OF �EVICES WITH ALL ARCHITECTURAL oOCUMENTS PRIOR TO INSTALLATION OF BACK BOXES.
REVIEW ALL ARCHITECTURAL AND ENGINEERING DOCUMENTS AND NOTIFV ARCHITECT OF ANV CONFLICTS.
GENERAL CONTRACTOR TO COORDINATE AND VEPoFV LOCATIONS OF EXISTING DEVICES TO REMAIN W ITH
ARCHITECTURAL PLANS AND NOTIFV ARCHITECT OF ANV CONFLICTS DURING THE ROUGH-IN PHASE OF PROJECT.
16. WALLSWITCHLOCATIONS
TO BE COORDINATED WITH FURNITURE AND WALL MOUNTED EDUIPMENT LOCATIONS PRIOR TO BOX ROUGH-MS.
NOTIFV ARCHITECT OF ANV CONFLICTS PRIOR TO INSTALLATION OF ROUGH-INS.
17. ENGMEERING DOCUMENTS
REFER TO ENG W EERING PLANS FOR ADDITI ONAL NOTES AND SPECIFICATI ONS.
18. SUSPENDEDCBLINGGRIDLAYOUT
CENTER FULL TILES IN ROOM IN BOTH DIRECTIONS AS INDICATED ON DRAW INGS UNLE55 DIMENSIONED OR
NOTED OTHERWISE.
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
r
�un��V l�rcNal�l,��'
�
DATE: OH�Z5 2O
l6. PANELBOARDS
CIRCUIT BREAKERS SHALL BE NEATLV TAGGED AND NUMBERE� BV G.C. TO CORRESPOND W ITH CIRCUITING
OUTLME� ON ENGWEERING DRAWINGS.
"I]. DATAANDRECEPTACLES
ALL WALL MOUNTED �ATA AND VOICE RECEPTACLES TO HAVE 3/4" CONDUIT STUB UP AND TERMINATED 6" ABOVE
HUNG CEILING.
18. MILLWORK
THE G.G SHALL COORDINATE ANV ELECTRICAL WORK OR LIGHTING INSTALLATION INTO CABW Ef WORK IF AND AS
REQUIRED.
19. PULL STRINGS
G Q TO PROVIDE PULL STRINGS IN ALL EMPTV CONDUIT.
20. SLAB ON GRADE
WHERE FLOOR OUTLETS ARE SHOWN AT SLAB ON GRADE LOCATIONS, SAW CUT AN� DEMO E%ISTING SLAB AS
REQUIRED PoR NEW WORK. EXPOSE (E) SLAB REWPoRCING 1'-0" MIN. BACK FROM EA. SAWCUT. PROVIDE NEW
SLAB RBNPoRCING TO MATCH EXISTING. REPAIR AND TAPE JOINTS AT VAPOR BARPoER WHERE ENCOUMERED.
PROVI�E CRUSHE� AGGREGATE TO MATCH EXISTING. PROVIDE 3,�00 P51 CONCRETE. FINISH TO MATCH E%ISTING
PER APPLICABLE AQ CRITERIA.
21. ABANDONE�CORE/FLOORPENETRATIONS
ALL ABANDONED CORE AND ABnNDONED FLOOR PENETRATIONS THAT ARE NOT SCHE�ULED TO BE REUSED ARE
TO BE REMOVED. FLOOR TO BE REPAIRED AS REQUIRED PER UL AND LOCAL CODE.
22 EXISTING LIFE SAFETV �EVICES
GENERAL CONTRACTOR TO COORDINATE LOCATIONS OF EXISTING LIFE SAFETV DEVICES WITH ENGW EERING AND
ARCHITECTURAL PLANS AND FURNITURE AND WALL MOUNTED EQUIPMENT. ALL �EVICES THAT ARE IN CONFLICTS
W ITH CONSTRUCTION DOCUMENTS FURNITURE AND WALL MOUNTED EQUIPMENT ARE TO BE RELOCATED, NOTIFY
ARCHITECTS IN WRITING TO CONFIRM NEW LOCATION PRIOR TO RELOCATION OF DEVICES.
23. ENGINEERWG DOCUMENTS
REFER TO ENG W EERING PLANS FOR ADDITIONAL NOTES AND SPEQFICATIONS.
15. CARPETSEAMING PLAN
SUBMIT CARPET SEAMING PLAN TO ARCHITECT PRIOR TO ORDERING AND AT LEAST (4) WEEKS PRIOR TO
INSTALLATION PoR ARCHITECT'S REVIEW AN� APPROVAL.
16. EXISTING FINISHES
EXISTWG FlNISHES IN BUILDING SERVICHCORE AREA TO REMAIN, UO.N.
n. woao oaicws�.
ALL WOOo UTILIZE� ON THE JOB (SOLID LUMBER AND TIMBER PANEL PRO�UCTS PLUS FlNISHED WOOD) SHALL
ORIGINATE FROM REGIONAL SOURCES AND FROM CERTIFlE� AND SUSTAINABLE SOURCES (SUCH AS SUSTAINABLE
FORESTRV INITIATIVE, CSA, FORESTRY STEWARDSHIP COUNQL, OR AMERICAN TREE FARM SVSTEMS).
18. ADHESNES & SEALANTS:
THE VOC CONTENT OF ADHESIVES AND SEALANTS USED SHALL BE LE55 THAN THE CURRENT VOC CONTENT
LIMITS OF SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT SCAQMD) RULE #1168, AN� ALL SEALANTS USED
AS FILLERS MUST MEET OR EXCEED THE REQUIREMENTS OF THE BAV AREA AIR QUALITV MANAGEMENT DISTRICT
REGULATION 8, RULE 51.
19. PAINT'.
CONTRACTOR SHALL USE PA W T SPECIFlED BY ARCHITECT AND SHALL PROPERLV PREPARE ALL SURFACES TO
RECENE ONE (1) PRIME COAT AND (2) FlNISH COATS (MIN) OF PAINT IN COLOR SPEQFlED BY ARCHITECT"
PROVIDE ADDITIONAL PREPARATION AND FINISH PAINT COATS AS REQUIRED BV PAINT MANUFACTURER. REFER
TO SPECIFICATION FOR ADDITIONAL W FORMATION.
YUl•J_11J�LL1� W LW lq:ii[U:3�_FYI�P] W_\Ii�I�]Jlili9JF9:FYNiliRll�a�UbY11:bYOlOI[U�6YIIq�A
2L EXTRA MATERIALS:
FURNISH EXTRA MATERIALS DESCRIBED IN CONTRACT �OCUMENTS THAT ARE FROM THE SAME PRODUCTION
RUN (BATCH MI%) AS MATERIALS APPLIED AND ARE PACKAGED FOR STORAGE, I�ENTIFIED W ITH L4BELS
DESCRIBING CONTENTS. STORE IN LOCATION MAINTAINING AN AMBIENT TEMPERATURE OF NOT LESS THAN 45
DEGREESF.
-QUANTITV-. FURNISH AN ADDITIONAL (5) PERCENT OF EACH MATERIAL AND COLOR SPECIFlED.
=
1.1
�
INDUSTRIOUS
COWORKING
880 W MONON GREEN BLVD
CARMEL, IN 46032
OWNEPRENANT
INDUSTRIOUS
215PARKAVES,4E1300
NEW YORK, NY 1 W03
ARCXITECT OF HECOPD
NORX
325 N LASALLE Si- SOIiE SCO
CHICAGO. IL 60654
PEiER.DUBWCmNORR-COM
312-0242400
MEP ENGINEER
MEENGINEERS
29 WEST 38iH SiREEi, SiH FLOOR
NEW YORK. NY 10018
CONiACi: BRIAN SHASSIAN
BBIANSHASSIANC�.ME-ENGINEER$_COM
JOHN HIGGINS
JOHN.HIGGWS(�MEENGINEERS.COM
�212J 44]-6]]0 PHONE
LIGHTING DESIGNER
REGENCY
9261 JOkDAN AVE
CHAiSWORiH, CA
800-28d-202J
ISSUE DATES
REV. DAiE DESCRIPiION
06/OS/2020 DD3
06/18l2020 CDvI
0]/06/2020 CDv2
W/ V/2020 100%/PERMIT
SEAL&SIGNATUNE
BY CHECK
BG PJ
BC PJ
eC Po
BC PJ
CARMEL CITY- 880 MONON GREEN
PRQIECT NUMBER
IND680MON
DRAWING TITLE
GENERALNOTES
SCALE
� � �Zii _ , i oii
SHEET NUMBER
G003
oF
PROJECTNAME