1. GENERAL
A. THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION," AIA DOCUMENT A201, LATEST EDITION, AS APPLICABLE,
AND THIS SPECIFICATION AS APPLICABLE ARE PART OF THIS CONTRACT.
B. ALLAPPLICABLECODES,LAWSANDREGULATIONSGOVERNINGORRELATINGTOANVPORTIONOFTHISWORKAREHEREBV
MCORPORATED INTO AND MADE A PART OF THESE SPECIFICATIONS, AND THEIR PROVISIONS SHALL BE CARRIE� OUT BV THE
CONTRACTOR W HO SHALL MFORM THE OW NER, PRIOR TO SUBMITTING A PROPOSAL, OF ANV W ORK OR MATERIALS W HICH
VIOLATE ANV OF THE ABOVE LAWS AND REGULATIONS. ANV WORK DONE BV THE CONTRACTOR CAUSING SUCH VIOLATION
SHALL BE CORRECTED BV THE CONTRACTOR.
C. INVESTIGATE EACH SPACE THROUGH W HICH EQl11PMENT M115T BE MOVE�. W HERE NECESSARY, EOUIPMENT SHALL BE
SHIPPED FROM MANUFACTURER IN SECTIONS OF SRE SUITABLE FOR MOVING THROUGH AVAILABLE RESTRICTNE SPACES.
ASCERTAM FROM BUILDING OW NER AND TENANT AT WHAT TIMES OF DAV EQUIPMENT MAV BE MOVED THROUGH ALL AREAS.
D. ALL DUCTWORK AND PIPING IS SHOW N DIAGRAMMATICALLV AND DOES NOT SHOW ALL OFFSETS, DROPS AND RISES OF RUNS.
THE CONTRQCTOR SHALL ALLOW IN HIS PRICE FOR ROUTING OF OUCTWORK AND PIPING TO AVOID OBSTRUCTIONS. EXACT
LOCATIONS ARE SUBJECT TO APPROVAL OF ARCHITECT.
E SUPPORTALLDUCTWORKANDPIPMGFROMBUILDINGSTRUCTUREAND/ORFRAMINGINANAPPROVEDMANNER.WHERE
OVERHEAD CONSTRUCTION DOES NOT PERMR FASTENWG OF SUPPORTS FOR WUIPMENT, FURNISH ADDITIONAL FRAMING.
F. INSTALL W ORK 50 AS TO BE READILV ACCESSIBLE FOR OPERATION, MAINTENANCE AND REPAIR. MINOR �EVIATIONS FROM
DRAW INGS MAV BE MADE TO ACCOMPLISH THIS, Bl1T CHANGES WHICH INVOLVE EXTRA COST SHALL NOT BE MADE W ITHOIIT
APPROVAL.
G. LEAVE WORK READILVACCESSIBLE FOR OPERATION, MAINTENANCE, AND REPAIR. PROVIDE ACCESS HATCHES IN FINISHED
CONSTRUCTION WHEREVER MECHANISMS RE�UIRING ACCESS FOR MAINTENANCE, READING OF INSTRUMENTS, OR FOR
OPERATION ARE CONCEALED IN THE STRUCTURE AND WHEREVER INDICATED ON THE DRAW INGS. SUPPLV ACCESS OOORS
OF SIZES NECESSARV TO PROVIDE READV ACCESS TO THE CONCEALED ITEMS. GROUP VALVES, CONTROLS, DAMPERS,
TRAPS EXPANSION JOINTS. CLEANOUTS, GAUGES, S W ITCHES, AND OTHER E�l11PMENT REQUIRING ACCESS IN CEILINGS.
WALLS AND FURRED SPACES TO REDUCE THE NUMBER OF ACCESS DOORS.
H. REMOVAL AND RELOCATION OF CERTAM EXISTING WORK WILL BE NECESSARV FOR THE PERFORMANCE OF THE GENERAL
WORK. ALL EXISTING CONDITIONS CANNOT BE COMPLETELV �ETAILED ON THE DRAW INGS. THE CONTR4CTOR SHALL SURVEV
THE SITE AND INCW DE ALL CHANGES IN MAKING UP THE WORK PROPOSAL.
I. CONNECT NEW WORK TO EXISTING WORK IN NEAT AND APPROVED MANNER. RESTORE EXISTING WORK DISTURBED W HILE
INSTALLING NE W W ORK TO ACCEPTABLE CONDITION AS DETERM W ED BY ARCHITECT.
J. DISCONNECT,REMOVEAND/ORRELOCATEEXISTINGMATERIALSEQUIPMENTANDOTHERWORKASNOTEDORREQUIREDFOR
PROPER MSTALLATION OF NEW SVSTEM.
K. THECONTRACTORSHALLKEEPALLEQUIPMENTANDMATERIALSANDALLPARTSOFTHEBUILDING,E%TERIORSPACESAND
ADJACENT STREET, SIDEWALKS AND PAVEMENTS, FREE FROM MATERIALS AND DEBRIS RESULTING FROM THE EXEWTION OF
THIS WORK EXCE55 MATERIALS W ILL NOT BE PERMITTEO TO ACCUMULATE EITHER ON THE INTERIOR OR THE EXTERIOR.
L SEAL OPENINGS AROUN� DUCTS AND PIPING THROUGH PARTITIONS, WALLS AND FLOORS (NOT IN SHAFTS) W ITH MINERAL
W OOL OR OTHER NONCOMBUSTIBLE MATERIAL.
M. PROVIDE ALL NECESSARV FLASHMG AND COUNTER FLASHING TO MAINTAIN THE WATERPROOFING INTEGRITV OF THIS
BUILDING AS REQUIRED BY THE INSTALLATION OR REMOVAL OF PIPES, OUCTS, CONDUITS, AND E�UIPMENT. PROVIDE
EQUIPMENT CURBS, CONCRETE HOUSEKEEPING PADS AND E�UIPMENT SUPPORT STEEL AS RWUIRED.
N. ALL PRESENT MATERIALS AND EQUIPMENT TO BE REMOVED UNDER THIS CONTRACT WILL REMAM THE PROPERTV OF THE
OWNER OR SHALL BE DISPOSE� OF BV THIS CONTRACTOR AS �IRECTED BV THE ARCHITECT.
0. MATERIALSANDWORKMANSHIP,UNLESSOTHERWISENOTED,SHALLBEINACCORDANCEWITHBUILDWGSTANDARDS.
P. THEWORKINTHEBUILDIN6SHALLBE�ONEWHENANDASDIRECTED,ANDINAMANNERSATISFACTORVTOTHEOWNER.THE
W ORK SHALL BE PERFORMED 50 AS TO CAUSE THE LEAST POSSIBLE INCONVENIENCE AND DISTURBANCE TO THE PRESENT
OCCUPANTS.
Q. THE CONTRACTOR'S PROPOSAL FOR ALL WORK SHALL BE PREDICATED ON THE PERFORMANCE OF THE WORK �URING
REGULAR WORKING HOURS. WHEN SO DIRECTED, HOW EVER, THE CONTRACTOR SHALL INSTALL WORK ON OVERTIME AND THE
ADDITIONAL COST TO BE CHARGED THEREFORE SHALL BE ONLV THE "PREMIUM" PORTION OF THE WAGES PAID.
R. UNLESSOTHERWISESPECIFICALLVSPECIFIED,WCWDEALLCUTTINGANDPATCHINGOFEXISTINGFLOORS,WALLS,
PARTITIONS AND OTHER MATERIALS IN THE EXISTMG BWLDING. THE CONTRACTOR SHALL RESTORE THESE AREAS TO
ORIGINAL CONOITION.
S. ACCESSTILEIDENTIFlCATION:PROVIOEBUTTONS,TABSANDMARKERSTOIDENTIFVLOCATIONOFCONCEALEDVAWES,
DAMPERS AND EQUIPMENT.
T. ALL SVSTEMS LEFT OPER4TIONS DURING CONSTRUCTION SHALL BE PROVIDEO W ITH FlLTERS AT HTE OPENING TO THE
CONSTRUCTION AREA. PROVIDE NEW FlLTERS FOR AHU AFTER COMPLETION OF PROJECT IF OPERATING DURING
CONSTRUCTION.
LL CONTRACTORSHALLPROVIDETEMPORARYHEATASREQUIRED.
V. ALL WORK THAT REQUIRES OISRUPTION OF EXISTING SERVICES SHALL BE SCHEDULE� IN ADVANCE WITH CBRE.
W. PROTECTION OF ALL EOUIPMENT, INCWDING FIN TUBE RADIATION FROM DUSTAND OEBRIS DURING CONSTRUCTION. ANV
SVSTEMS LEFT OPERATIONAL �l1RMG CONSTRUCTION SHALL BE PROVIDED WITH FlLTERS AT THE OPEN WG TO THE
CONSTRUCTION AREA. PROVIOE NE W FlLTERS FOR ANV UNITS THAT qRCULATED AIR THROUGH THE CONSTRUCTION SPACE
UPON COMPLETION OF CONSTRUCTION.
2. SCOPE OF WORK
A. THEWORKl1NDERCONTRACTINCWDESALLLA60R,MATERIALSANDAPPLIANCESNECESSARVFORTHEFURNISHING,
INSTALLING AND TESTING, COMPLETE AND READV FOR SAFE OPERATION OF THE SVSTEM. WORK SHALL BE INSTALLED IN A
NEAT, WORKMANLIKE MANNER.
B. THE CONTRACTOR SHALL GNE NECESSARV NOTICE, FlLE DRAW INGS AND SPEQFlCATIONS W ITH THE DEPARTMENT HAVING
JURISDICTION, OBTAIN PERMITS OR LICENSES NECESSARV TO CARRY OUT THIS W ORK AND PAY ALL FEES THEREFOR. THE
CONTRACTOR SHALL ARRANGE FOR INSPECTION AND TESTS OF ANV OR ALL PARTS OF THE WORK IF SO REQUIRED BV
AUTHORITIES AND PAV ALL CHARGES FOR SAME. THE CONTRACTOR SHALL PAV ALL COSTS FOR, AND FURNISH TO THE
OW NER BEFORE FlNAL BILLING. ALL CERTIFlCATES NECESSARV AS EVIDENCE THAT THE W ORK INSTALLE� CONFORMS W ITH
ALL REGULATIONS WHERE THEV APPLV TO THIS WORK.
C. THE CONTRACTOR SHALL FURNISH A W RITTEN GUARANTEE TO REPL4CE OR REPAIR PROMPTLV ANO ASSUME
RESPONSIBILITV FOR ALL EXPENSES INCURRED FOR ANY W ORKMANSHIP AND EQUIPMENT IN W HICH DEFECTS DEVELOP
W ITHIN ONE VEAR FROM THE DATE OF FINAL CERTIFICATE FOR PAVMENT AND/OR FROM DATE OF ACTUAL USE OF E�UIPMENT
OR OCCUPANCV OF SPACES, BV OW NER, INCLUDED UNDER THE VARIOUS PARTS OF THE W ORK, W HICHEVER DATE IS EARLIER.
THIS WORK SHALL BE DONE AS DIRECTED BV THE OWNER. THIS GUARANTEE SHALL AL50 PROVIDE THAT WHERE DEFECTS
OCCUR, THE CONTRACTOR W ILL ASSUME RESPONSIBILITV FOR ALL EXPENSES INCURRED IN REPAIRING AND REPLACING
WORK OF OTHER TRADES AFFECTED BV DEFECTS, REPAIRS OR REPLACEMENTS IN EpUIPMENT SUPPLIED BV THE
CONTRACTOR.
3. SHEETMETALWORK
A. WSTALLALLDUCTWORKINSTRICTAOHERENCETOTHECEILINGHEIGHTSCHEDULEINOICATEDONARCHITECTSDRAWINGS.
CONSULT W ITH THE ELECTRIC AND PWMBING CONTRACTORS, AND IN CONJl1NCTION W ITH THE ABOVE CONTRACTORS,
ESTABLISH THE NECESSARY SPACE REQUIREMENTS FOR EACH TRADE. THE SHEET METAL DUCTW ORK SHALL, WHETHER
INDICATED OR NOT, RISE AND/OR DROP AN�iOR CHANGE IN SHAPE TO QEAR ANV AND ALL CONDUITS. LIGHTMG FIXTURES,
PLUMBING ANO HEATING MAINS TO MAINTAIN THE DESIRED CEILING HEIGHTS.
B. EXCEPT AS OTHERW ISE SHOW N OR NOTED, ALL DUCTVJORK AND OTHER SHEET METAL WORK SHALL BE GALVANIZED SHEET
STEEL AND SHALL BE INSTALLED IN ACCORDANCE W ITH SMACNA DUCT CONSTRUCTION STANDARDS FOR P' SP. ALL
DUCTVJORK DOW NSTREAM OF TERMINAL UNITS SHALL HAVE CLASS "B" SEALANT PROVIDED FOR JOINTS AND SEAMS. ALL
�UCT MAINS UPSTREAM OF TERMINAL UNITS SHALL BE MEDIUM PRESSURE AND CONSTRUCTED TO SMACNA 3" PRESSURE
CLASS W ITH SEAL CLASS A.
C. VOWMEDAMPERS:GALVAWZEDSTEEL,PERSMACNA"LOWVELOCITYMANUAC',EXCEPTPROVIDEBEARINGATONEENDOF
DAMPER ROD AND QUADRANT, W ITH LEVER AN� LOCKSCREW AT OTHER END. FOR INSULATED DUCTS, QUADRANTS MOUNTED
ON COLLAR TO CLEAR INSULATION. MSTALL W ITH LEVERS ACCESSIBLE. VOLUME DAMPER BLADES SHALL NOT BE W IDER
THAN 12", SHALL BE COMPLETE W ITH HEAVV ANGLE IRON FRAMES, CONNECTIIN6 AND OPERATMG LINKS, BRASS TRUNNIONS,
AND BRONZE BEARINGS. DAMPERS, UNLE55 OTHERW ISE NOTED SHALL BE FABRICATE� W ITH NOT LE55 THAN NO i6 GAUGE.
BLADES SHALL BE PROVIDED W ITH CONTINUOUS STOPS ON ALL FOUR SIDES TO PREVENT AIR LEAKAGE. BLADES OF THE
DAMPERS SHALL BE SET INTO A FLAT STEEL FRAME W ITH THE FRAME SECURELV BOLDTED TO THE DUCT. ALL DAMPERS
SHALL BE FlTTED W ITH A HEXAGONAL BRAS SPINDLE W HICH SHALL BE EXTENDED THROUGH THE EXTERIOR OF THE DUCT AND
BE FITTED WITH AN INDICATING SELF-LOCKING REGULATOR. REGULATOR SHALL BE SIMILAR TO VENTLOCK 641. MAXIMUM OF
TWO BLADES PER FRAME.
D. ACCESS DOORS: INSIILATE� OR UNINSIILATEO, SAME AS DIICT.
1) PROVIDEMINIMUMI2"x12"ONBRANCHDUCTS,UNLESSOTHERWISEAPPROVED,ATFIRE�AMPERS,SMOKEDAMPERS,
AND AT ALL �UCT ACCESSOPoES SUCH AS HUMIDIRERS, DUCT SMOKE oETECTORS, AUTO DAMPERS, AND LO WERS.
PROVIOE A 12" X 12" ACCESS DOOR FOR EVERV 50'-0" RUN OF DUCTWORK FOR CLEANING PURPOSE.
2) ALL ACCE55 DOORS TO BE HINGED, W ITH LATCH SIMILAR TO VENTLOCK NO. 100, UNLE55 OTHERWISE APPROVED.
E FLEXIBLE CONNECTIONS: NEOPRENE-COATED GLASS FABRIG 30 OZ PER SQ V� W ITH SEW ED AND CEMENTED SEAMS, SIMILAR
TO VENR FABRICS. PROVIDE W ITH METAL COLLARS. ALLOW MINIMUM MOVEMENT OF 7". CONNECTIONS SHALL BE A MINIMUM
OF6"LON6.
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
r
�un��V l�rc�alols�.
�
DATE: OH�Z5�2O
F. TURNINGVANES:GALVANIZEDSTEELSMALLSINGLETHICKNESSVANESWITHT'INSIDERADIUS.
G COMBINATION FlRE/SMOKE DAMPERS AN� DAMPER OPERATORS: 16 GAUGE MINIMUM GALVANIZED CONSTRUCTION, AIRFOIL
SHAPED DOUBLE SKIN BLA�ES PAftALLEL BLA�E OR OPPOSED AS REQUIRED W ITH 14 GAUGE EQUIVALENT THICKNESS,
( )
STAINLE55STEELBEARINGS,ANDSILICONRUBBERBLADEEDGESDESIGNEDTOWITHSTANO450F. COMBINATION
FIREISMOKE DAMPER AND OPERATOR SHALL BE 14/2 HOUR FIRE RATED 11NDER 11L STANDARD 555 ANO BE CLASSIFIED BV 11L
UNDER THE LATEST VERSION OF UL555S AT AN ELEVATED TEMPERATURE OF 250 F, 350 F, OR 450 F DEPENDING UPON THE
OPERATOR. ELECTRONIC OPERATORS SHALL BE INSTALLED BV THE DAMPER MANUFACTURER AT TIME OF DAMPER
FABRICATION. EACH DAMPER SHALL BE EQUIPPED W ITH A UL CLASSIRED FlRESTAT EQUAL TO RUSKIN MODEL TS150 AND
SHALL BE ELECTRICALLV AND MECHANICALLY LOCKE� IN A CLOSEO POSITION W HEN �UCT TEMPERATURES EXCEED 212 F
AND SHALL ALLOW APPROPRIATE AUTHORITY TO OVERRIDE FIRESTAT AND OPERATE DAMPER AS MAV BE REQUIRED FOR
SMOKE CONTROL FUNCTIONS. FIRESTAT PACKAGE SHALL INCW DE TWO DAMPER POSITION INDICATOR SW ITCHES LINKED
DIRECTLY TO DAMPER BLADE DAMPERS SHALL BE RUSKIN MODEL FSD36 W ITH TSi50 RRESTAT PACKAGE.
H. ALLDUCTDIMENSIONSINDICATEDONPLANSAREINSIDE0.EARDIMENSIONS.
4. AIROUTLETS:
A. GENERAL
1) FINISHANDCOLORASSELECTEDBYARCHITECT.
2) EXACT LOCATION OF ALL AIR OURETS AS PER ARCHITECTURAL DRAW INGS. RELOCATION OF CEILING DIFFUSERS OR
REGISTERS IN ORDER TO MATCH THE CEILING TILE LAVOUT SHALL BE MADE AT NO AOOITIONAL COST TO OW NER.
3) FRAMETVPESUITABLEFORMOUNTINGINCEILINGORWALLCONSTRUCTIONASIN�ICATEDONARCHITECTURALPLANS.
4) SUITABLE FOR OPERATION AT 20 % EXCESS AND 20% LESS THAN NOTED CAPAGTV. MANUFACTURER RESPONSIBLE FOR
EXAMINWG APPLICATION OF EACH OUTLET AND GUARANTEE THAT EACH W ILL PROVIDE REQUIRED NC LEVELS AND
COMFORT SPACE CONDITIONS WITHOUT �RAFTS THROUGHOUT OPERATING RANGE.
5) ALL REGISTERS AND OIFFUSERS SHALL BE PROVIDED WITH OPPOSED BLADE VOLUME DAMPERS (UNLE55 NOTED
OTHERW ISE). DAMPER OPERATING LEVERS SHALL BE ACCESSIBLE AT THE FACE OF AIR OUTLETS.
6) ALLGRILLES,REGISTERSANDDIFFUSERSMUSTBETESTEDUNDERADCSTANDARDSANDCARRVTHEADCSEALOF
APPROVAL.
]) MODELS SHALL BE PER SCHEDULE.
5. NOISE CONTROL:
A. ALL ROOM NC LEVEL SHALL BE 35 OR LESS.
B. SOUNDLINING FOR LOW PRESSURE DUCTWORK SHALL BE 1"THICK, 1-1/2 LB. DENSITV, RBROUS GLASS DUCT LINING MEETWG
THE REQUIREMENTS OF NFPA9�A
G PROVIDE SOUNDLINING FOR 2 FT W EACH �IRECTION WHERE DUCT TAPS MAIN BEFORE PASSING THROUGH WALLS. SEE
OETAILS.
6. TESTINGANDBALANCING:
A. BALANCING SHALL BE ACCOMPLISHED BY ADJUSTMENT OF FANS AND BRANCH DAMPERS FOR MAJOR ADJUSTMENTS.
ADJUSTMENT OF TERMINAL DAMPERS ANO DEVICES SHALL BE FOR TRIM OR MINOR ADJUSTMENT ONLV. THIS SHALL BE DONE
TO PERMIT THE LEAST NOISE GENERATION W THE TERMINAL AREAS ANO UTILRE MINIMUM FAN ENERGY.
B. BALANCE REPORT SHALL BE PROVIDED ON AABC-TVPE FORMS.
G TESTING AND BALANqNG SHALL BE PERFORMED AND SUPERVISED BV A CERTIFIED INDEPENDENT FIRM SPECIALIZMG IN
TESTING AND BALANqNG.
D. ADJUSTFLOWSTOWITHINIO%OFVALUESSHOWN. IFDESIGNFLOWSCANNOTBEOBTAINEDWITHINSPEQFIE�LIMITSTHE
BALANCING CONTRACTOR W ILL PERFORM THE FOLLOW ING (AT THE MINIMUM)'.
1) MEASUREANDRECORDMAJORPRESSl1REDROPSINTHESVSTEM.
2) CONSULTWITHTHEENGWEERANDINSTALLERASRE�UIRED.
3) UPONRECENINGWRITTEN�IRECTIONTOPROCEE�ANDAFfERANVCORRECTIONAREPERFORMED,REBALANCE
AFFECTED PORTION OF THE SYSTEM.
E. DUCT LEAKAGE TESTING
1) WSTALLED DUCTWORK SHALL BE TESTED PRIOR TO WSTALLATION OF ACCESS DOORS, TAKE-OFFS ETC.
2) ALL LEAK TESTMG SHALL BE W ITNESSED BV THE ENGMEER OR REPRESENTATIVE OF THE ENGWEER. THE CONTRACTOR
SHALL GNE THE ENGMEER 12 HOURS NOTICE PRIOR TO TESTING. ANV TESTING NOT WITNESSED BV THE ENGWEER OR
HISMER REPRESENTATIVE, SHALL BE CONSI�ERED INVALID AND WILL BE REDONE.
3) THETESTINGSHALLBEPERFORMEDASFOLLOWS:
A) PERFORM TESTING IN ACCOR�ANCE W ITH HVAC AIR DUCT LEAKAGE TEST MANUAL.
B) USE A CERTIRED ORIFlCE TUBE FOR MEASURING THE LEAKAGE.
C) DERNE SECTION OF SVSTEM TO BE TESTED AND BLANK OFF.
D) DETERMINE THE PERCENTAGE OF THE SVSTEM BEING TESTED.
E) USING THE PERCENTAGE, DETERMINE THE ALLOWABLE LEAKAGE (CFM) FOR THAT SECTION BEING TESTED.
F) PRESSURIZET0I.STIMESOPERATINGPRESSUREANDREPAIRANYSIGNIFICANTORAUDIBLELEAKS.
G) REPRESSURREANDMEASURELEAKAGE.
H) REPEAT STEPS fi AND ] UNTIL THE LEAKAGE MEASURE� IS LE55 THAN THE ALLOWABLE DEFINED IN STEP 5.
4) ALL TRANSVERSE JOINTS AN� LONGITUDINAL SEAMS SHALL CONFORM TO SMACNA'S CLA55 A SEALING REOUIREMENTS AS
DEFINED ON PAGE 1-6 OF THE 1995 SMACNA MANUAL, FIRST EDITION.
5) VARIABLEAIRVOLUMESVSTEMSISUPPLYDUCTWORK
FAN TO VAV BOXES 1% OF DESIGN CFM
VAV BOXES TO REGISTERS 2% OF DESIGN CFM
]. SHOPDRAWINGS:
A. INDICATE ON EACH SUBMISSION:
1) PROJECT NAME AND LOCATION.
2) ARCHITECTANDENGMEER.
3) ITEM IDENTIFICATION.
4) APPROVAL STAMP OF PRIME CONTRACTOR.
B. SUBMISSION:
1) SUBMISSIONS 71 in. x 1� in.OR SMALLER: IF THE SUBMISSION IS A CATALOG CUT, THEN THE CONTRACTOR SHALL SUBMIT
THREECOPIES. THEARCHITECTWILLFORWARDTHEORIGINALANDONECOPV�TWOCOPIESWHENNOORIGINALIS
RECENED) TO THE ENGINEER. ALL CATALOG CUTS SHALL BE COMPLETE.
2) Sl1BMISSIONSLARGERTHAN11in.x1]in:SUBMITTWOPRINTSANDELECTRONICCOPVTOTHEARCHITECT.THE
ARCHITECT W ILL FORWARD ONE PRINT AND ELECTRONIC COPV TO THE ENGINEER.
G SUBMITSHOPDRAWINGSFORFOLLOWING
1) DUCTWORKLAVOUTANDSHEETMETALDETAILS
2) AIROUTLETS
3) EQUIPMENTSUPPORT�ETAILS
4) AIR BALANCE REPORT
5) OPERATION SEQUENCE
6) CONTROLSVSTEMS,
]) INSULATION
8) AS-BUILTDRAWINGS
8. DUCTWORKINSULATION
A. INSULATE ALL OUCTW ORK EXCEPT THE FOLLOW ING PORTIONS OF DUCTW ORK'.
1) OUCTSANOCASINGSINTERNALLYINSULATEDORPROVIOEDWITHSOUNOABSORPTNELINING.
2) ALLEXHAUSTOUCTWORK,E%CEPTWHEREOTHERWISENOTED.
3) RETURN AIR DUCTWORK FROM AIR CONDITIONING SVSTEMS PASSING THROUGH AIR CONDITIONED SPACE AND/OR HUNG
CEILING OF AIR CONDITIONED SPACE.
4) RETURN AIR DUCTVJORK FROM HEATING AND VENTILATING SVSTEMS, WHERE RETURN AIR DUCTS PASS THROUGH HEATED
AREAS.
5) LOW PRESSURE SUPPLV DUCTS
6) TRANSFER DUCTS
B. ALL INSULATION SHALL HAVE COMPOSITE (INCLUDING INSULATION JACKET OR FACWG AND ADHESIVE) FlRE AND SMOKE
HAZARD RATINGS AS TESTED BV PROCEDURE ASTM E-84, NFPA 255 AND UL 123 NOT EXCEEDING'.
1) FLAMESPREAD........_25
2) SMOKEDEVELOPED._.50
C. INSULATION FOR CONCEALED DUCT
1 EXCEPT W HERE OTHERW ISE NOTED ALL CONCEALED RECTANGULAR AND ROUND DUCTWORK SHALL BE COVERED W ITH
)
REXIBLE DUCT INSULATION W ITH OR W ITHOUT VAPOR BARPoER AND OF THE THICKNESS INDICATED BELOW:
SERVICE THICKNESS WITH
COLD SUPPLV Dl1CTS 2" VAPOR BARRIER
COLD RETURN AIR DUCTS 2" VAPOR BARRIER
2) REXIBLE DUCT WSULATION W ITH VAPOR BARRIER SHALL BE 1-7/2 LBS. PER CU. FT. DENSITY GLASS FlBER W ITH A
MAXIMUM K FACTOR OF � 25 AT 15EF MEAN TEMPERATURE, W ITH REMFORCED FOIL-FACED FLAME RESISTANT KRAFT
VAPOR BARRIER.
3) INSULATION W ITH VAPOR BARRIER SHALL BE DUCT W RAP INSULATION FRK-25, TVPE 100 AS MADE BV OWENS-CORNING OR
MANVILLE MICROLITE W ITH FRK VAPOR BARRIER FACING OR STANDARD DUCT INSULATION AS MADE 8V CGG W ITH FRK
FAQNG.
4) REXIBLE DUCT INSULATION W ITHOUT VAPOR BARRIER SHALL BE 1-0/2 LBS. PER CU. Ff. �ENSITV GLA55 FBER W ITH A
MAXIMUM K FACTOR OF 025 AT ]5EF. MEAN TEMPERATURE ANO SHALL BE OWENS CORNING FIBERGLA55 TVPE ]SP,
MANVILLE MICROLITE OR EpUAL.
5) ADHERE INSULATION TO DUCT WITH FOSTER FIRE RESISTANT ADHESIVE 85-60, CHILDERS CP427.OR APPROVED EQUAL,
APPLIED IN 3 WCH W IDE TRANSVERSE STRIPS AT B INCH INTERVALS. INSULATION SHALL BE BUTTED W ITH FACING
W ERLAPPING ALL JOINTS AT LEAST 21NCHE5 AND SEALEO W ITH FOSTER FIRE RESISTANT ADHESIVE 85-6q CHILDERS
CP-02], OR APPROVED EOUAL FOR INSULATION W ITH VAPOR BARRIER USE FOSTER FIRE RESISTANT VAPOR BARRIER
ADHESNE OR EpUAL AND JOINTS W ITHOUT TABS SHALL BE FIRMLV SEALED W ITH AWMINUM FOIL TAPE ADHERED W ITH
SAME ADHESIVE. SECURE INSULATION W ITH i6 GAUGE COPPERCLAD W IRE SPACED NOT MORE THAN 12 WCHES ON
CENTER.
6) ADDITIONALLV, SECURE WSULATION TO BOTTOM OF RECTANGULAR DUCTS OVER 24" W IDE W ITH WELDED PWS OR STICK
CLIPS ON 18" CENTERS COATEO W ITH A VAPOR BARRIER COATING
D. INSULATION FOR EXPOSED RECTANGULAR DUCT
1) PROVIDERIGIDDUCTINSULATIONWITHANDOFTHETHICKNESSINDICATEDBELOWFOREXPOSEDDUCTWORKWITHIN100
FT OF ROOFfOP UNITS. ALL OTHER DUCTWORK UPSTREAM OF TERMINAL BOXES SHALL BE PROVIOED WITH 2" DUCT WRAP.
SERVICE THICKNE55 WITH
COLD AND HOT AIR SUPPLV DUCTS
(EXCEPT WHERE OTHERWISE NOTED) 1-i12" VAPOR BARRIER
COLD AND HOTAIR RETURN AIR DUCTS
(EXCEPT WHERE OTHERWISE NOTED) 1-1/2" VAPOR BARRIER
2) RIGID DUCT INSULATION WITH VAPOR BARRIER SHALL BE 4 LBS. PER CU. FT. DENSITY GLASS FIBER WITH MAXIMUM K
FACTOR OF 0 22 AT ]SEF. MEAN TEMPERATURE WITH FIRE RETARDANT VAPOR BARRIER FAqNG ALL SERVICE JACKET
(WHITE FINISH}
3) RIGID DUCT INSULATION W ITH VAPOR BARRIER SHALL BE RBERGLASS TVPE 105 BV OWENS-CORNING OR MANVILLE, TYPE
4]5 OR TVPE 800 MICRO-AIRE W ITH FSK FAQNG OR EQUAL.
6) RIGID DUCT INSULATION W ITHOUT VAPOR BARRIER SHALL BE 6 LBS. PER CU. FT. DENSITV GLASS FIBER W ITH MA%IMUM K
FACTOROF022AT]5EF.MEANTEMPERATURE. WITHFIRERETARDANTFACWGFOILREINFORCEDDRAFT(ALLSERVICE
JACKET).
5) RIGID DUCT INSULATION W ITHOUT VAPOR BARRIER SHALL BE RBERGLA55 TVPE �OS BV OWENS-CORNING OR MANVILLE,
NO. 81] W/ASJ OR APPROVED EQUAL.
6) INSULATIONSHALLBEFASTENEDTODUCTWITHI2GAUGEWELDEDPINSANDWASHERS,OREpUIVALENTASAPPROVED.
FASTENERS SHALL BE SPACED 12 TO 181NCHES ON CENTER, A MINIMUM OF TNO ROWS PER SI�E OF DUCT. SECURE
INSULATION IN PLACE W ITH SUITABLE SPEED WASHERS RRMLV EMBEDDED IN WSULATION, OR PUSH A SELFLOCKING CAP
OVER PIN AFTER COATING W ITH FITTING MASTIC TYPE C BY OW ENS-CORNING OR EQUAL.
]) SEAL ALL JOINTS, BREAKS AND IMPRESSIONS W ITH FOSTER FIRE RESISTANT VAPOR BARRIER MASTIC FOSTER 30-65,
CHIL�ERS CP-34, OR APPROVED EQUAL, AND APPLV 5' W IDE JOINT SEALING TAPE TO ALL JOINTS. ALL SURFACE MUST BE
CLEAN AND DRV BEFORE APPLVING TAPE. COAT ALL TAPE SEAMS W ITH SAME VAPOR BARRIER MASTIC TO PREVENT
DELAMINATION OF TAPE.
8) THE CONTRACTOR SHALL HAVE THE OPTION TO USE THE FOLLOWING MATERIAL: INSULATION FOR ROUND DUCTS SHALL
BE OF THICKNESS NOTED ABOVE AND SHALL BE FIBERGLASS BEND-A-BOAR� HAVING A FACTORV APPLIED ASJ VAPOR
BARRIER JACKET SECURED W ITH STABLES AND ASJ PRESSURE SENSITIVE TAPE. BEN�-A-BOARD IS A 3.00 PA.F. BOARD
CUT INTO STRIPS, ADHERED TO JACKETWG IT MUST HAVE A UL LABEL.
9) TRANSITION DUCTWORK AT SOUND TRAPS SHALL BE INSULATED W ITH 1-1/2" THICKNESS, 4 LBS. DENSITY, FlBROUS GLASS
BOAR�WITHREINFORCEDALUMINUMVAPORBARRIER,OWENS-CORNINGSERIES]�S,ORAPPROVEDEQUAL FASTEN
INSULATION IN PLACE W ITH W ELDEO PINS AND WASHERS OR EQUIVALENT MECHANICAL FASTEN WG METHOD, AS
APPROVED. SEAL ALL JOINTS WITH VAPOR BARRIER ADHESNE TO PROVIDE CONTINUOUS VAPOR BARRIER. ALL EDGES,
CORNERS AND JOINTS, RBNPoRCED W ITH 4" W IDE TAPE TAPE OF TYPE AND APPLIED IN STRICT CONFORMANCE W ITH
MANUFACTURER'S RECOMMENDATIONS. OVER THE INSULATION APPLV A FLOOD COAT OF FOSTER 30-65, CHILDERS CP34
OR EOUAL VAPOR BARRIER COATING. PROVIOE FIBERGLA55 FITTING TAPE OR GLASS CLOTH SMOOTHLV ADHEREO W ITH
FOSTER 85-60/85-20 ADHESIVE.
10) TRANSITION PIECE AT STACK AND Dl1CTWORK FOR HIGH TEMPERATURE HOT WATER GENERATORS SHALL BE INSULATED
W ITH 2" THICKNESS CALCIUM SILICATE BLOCK INSULATION. APPLIED OVER A 1" "V" RIBBED LATH TO PROVIDE A 1" AIR
SPACE UNDER INSULATION. FIRMLV ATTACH "V" RIBBED LATH TO SURFACES TO BE INSULATE� BY TACK W ELDING CLIP
ANGLES TO BREECHING, Dl1CTW ORK AN� TRANSITION PIECE AT A SPACING OF NOT GREATER THAN iT CENTERS
VERTICALLV AND HORIZONTALLV. LATH SHALL BE TACK W ELDED OR W IRED TO CLIP ANGELS. INSULATION SHALL BE
COVERED W ITH 1" GALVANIZED HEXAGONAL W IRE MESH, #18 GAGE MINIMUM AND TWO 1I41NCH THICK COATS OF
PORTLAND CEMENT PLASTER FlRST COAT TO BE ROUGH OR SCRATCH COAT. THE SECONO COAT SHALL BE TROWELED
TO A SMOOTH AND EVEN FINISH. ACCE55 DOORS AND EXPANSION JOINTS SHALL BE NOT COVERED. ACCESS OOOR SHALL
BE DOUBLE W ALL W NSTRl1CTION W ITH 2" W SULATION.
E. INSULATION PACKING FOR DUCTWORK
1) PROVIOEI/2"THICKRIGIDFlBERBOARDSLEEVEWHEREVERDUCTWORKPENETRATESWALLSROORSLABS,PARTITIONS,
ETG SPACE BETW EEN DUCT AND W ALL SLEEVE AND BETW EEN DUCT AN� SLAB OPENING SHALL BE TIGHTLY PACKED W ITH
MMERAL W OOL AND SEALED W ITH APPROVED TVPE NON-HARDENING CAULKING COMPOUND.
2) PACKING MATERIAL SHALL BE ROCKWOOL INSULATION AS MANUFACTURED BV UNITEO STATED GVPSUM C0. OR EQUAL
AND SHALL COMPLY W ITH FED. SPEC. HH4-558, FORM A, CLASS 4, K=024, MELTING POINT 2000°F.
F DUCTWORKEXECUTION
1) DO NOT INSTALL COVERING BEFORE DUCTWORK HAS BEEN TESTED AND APPROVED.
2) WSULATION SHALL BE APPLIEO ON CLEAN DRV SURFACES, AFTER INSPECTION ANO RELEASE FOR INSULATION
APPLICATION.
3) THEFlNISHWCLUDINGANVVAPORBARRIERTREATMENTSHALLLAPADJACENTSECTIONSATBOTHTHETRANSVERSEAND
LONGITUDINAL JOINTS AND 3" STRIPS OF MATCHING RNISH MATERIAL SHALL BE ADHERED AT THE TRANSVERSE JOINTS.
9. AUTOMATICTEMPERATURECONTROLS
A. THE WORK INCW DES THE PROVI�ING OF ALL LABOR, MATERIALS, EQl11PMENT, ACCESSORIES, SERVICES AND TESTS
NECESSARV TO COMPLETE THE PLACE INTO SATISFACTORV OPERATION A COMPLETE SVSTEM OF AUTOMATIC TEMPERATURE
CONTROLS AS SHOWN ON THE DRAW MGS AND HEREINAFTER SPECIFIED.
B. THE CONTROL SVSTEM SHALL BE OF THE ELECTRONIC FULLV MODULATING TVPE ALL CONTROLS SHALL BE THE PRODUCT OF
ONE MANUFACTURER. THE TEMPERATURE WNTROL MANUFACTURER SHALL BE RESPONSBLE FOR THE QUALITV ANO
SATISFACTORV OPERATION OF MATERIAL PROVIDED BUT NOT ACTUALLV MANUFACTURED BV HIM.
G THE CONTROL SVSTEM SHALL INCW DE ALL NECESSARV THERMOSTATS SENSORS, DAMPER ACTUATORS, VALVES, RELAVS.
ETC., AND ALL NECESSARV E�UIPMENT FOR A COMPLETE CONTROL SVSTEM, REGARDLESS OF WHETHER OR NOT
SPECIFICALLY MENTIONED.
�. THECONTROLSVSTEMSHALLINCWOEALLCONTROLANDINTERLOCKWIRING,UNLESSOTHERWISESHOWNONTHE
ELECTRICDRAWINGS. THECONTROLWIRINGSHALLINCWDEALLWIRING,INCWDMGPOWERWIRINGFORSENSORS,
CONTROLS, CONTROL DEVICES, RELAVS. FREEZESTATS, FIRESTATS AND ALL OTHER NECESSARV EQUIPMENT TO PROVIDE A
COMPLETE CONTROL SVSTEM, REGARDLESS OF W HETHER OR NOT SPEQFlCALLV MENTIONED, INCLUDING ELECTRIC RELAVS
AND CONTACTORS REQUIREO FOR CONTROL WTERLOCKING. INTERLOCK WIRING SHALL INCWDE INTERLOCKS BETWEEN FAN
STARTERS BETWEEN PUMP STARTERS BETWEEN STARTERS ANO REMOTE CONOENSING UNITS, BETWEEN PUMPS, CHILLERS
AND COOLING TOWERS AND WHEREVER ELSE CALLE� FOR IN THESE SPECIFICATIONS. UNLESS OTHERW ISE NOTEq ALL
CONTROL CIRCUITS SHALL BE 120 VOLTS OR LESS.
E PROVIDE NAMEPLATES ON ALL OEVICES, W HETHER OR NOT MOUNTED ON THE FACE OF LOCAL CONTROL PANELS. IN
OCCUPIED AREAS, NAMEPLATES SHALL BE CONCEALED BENEATH COVERS OF ROOM NPE WSTRUMENTS, TO DESCRIBE
FUNCTIONS.
F. BMS AND CONTROLS WORK SHALL BE PERFORMED BY VENDORICONTRACTOR SPECIALIZWG IN CONTROLS WORK.
G. COMPLETE SHOP DRAWIN6S SHALL BE SUBMITTED TO THE ENGWEER FOR APPROVAL BEFORE ANV RELO INSTALLATION IS
STARTED. SUCH DRAWINGS SHALL GNE A COMPLETE DESCRIPTION OF ALL CONTROL ELEMENTS AND SHALL SHOW
COMPLETEDSCHEMATICPIPINGANDWIRINGDIAGRAMS,INCWDINGFUNCTIONALDESCRIPTION. VALVEANDDAMPER
SCHEDULESSHALLBEINCLUDED.
H. FLOOR PLANS IN�ICATING ALL ROOM THERMOSTAT LOCATIONS NOT SHOWN ON THE DRAWINGS AND SAMPLES OF EACH
TVPE, SHALL BE PREPAREO AND SUBMITTED TO THE ARCHITECT FOR APPROVAL BEFORE INSTALLATION. SAMPLES OF
UNITARV CONTROLS SHALL AL50 BE SUBMITTED FOR APPROVAL. ALL ROOM CONTROLS SHALL BE MOUNTED FIVE FEET
ABOVE FINISHED FLOOR.
I. THE CONTROL SVSTEM HEREIN SPEqRED SHALL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIAL UNDER NORMAL
USE AND SERVICE IF. W ITHIN ONE VEAR FROM DATE OF ACCEPTANCE BV THE ARCHITECT, ANV EQUIPMENT HEREIN
DESCRIBED IS PROVED TO BE DEFECTNE IN W ORKMANSHIP OR MATERIAL, IT SHALL BE ADJUSTED, REPAIRED OR REPLACED,
FREE OF CHARGE, DURING THE GUARANTEE PERIOD
J. ALL ELECTRIC W IRING, MATERIALS AND INSTALLATION SHALL BE IN ACCOR�ANCE WITH THE LATEST REVISION OF THE
NATIONAL ELECTRIC CO�E, AND APPLICABLE LOCAL GODE, AND SHALL CARRV THE UL LABEL W HERE APPLICABLE ALL W IRING
SHALL BE INSTALLE� M EMT OR RIGID GALVANRED STEEL CONDUIT (EXTERIOR) OR EMT, 3l4" MINIMUM, AND SHALL BE A
MINIMUM OF N14 AWG. ALL SPECIALS, SUCH AS JUNCTION BOXES AND CONNECTORS, SHALL BE OF TVPE �ESIGNED FOR USE
W ITH CONDUIT. ELECTRIC COMMIINICATIONS BETWEEN SENSORS, CONTROLLERS, CONTROL DEVICES ETC. MAV BE RUN IN
THIN WALL CONDUIT IF THE VOLTAGE OF THE COMMUNICATION IS UNDER 50 VOLTS. PROVIDE COMMUNICATION WIRE THAT IS
RECOMMENDED AND APPROVED BV THE COMMUNICATION EQUIPMENT MANUFACTURER FOR THE SPEQRC APPLICATION.
K. AUTOMATIC AND SMOKE DAMPER OPERATORS:
1) DAMPER OPERATORS SHALL BE OF THE PISTON TVPE, W ITH REINFORCED SVNTHETIC RUBBER DIAPHR4GM, AN� W ITH
BRACKET ARRANGEMENT FOR LOCATION OUTSIDE THE AIRSTREAM W HEREVER POSSBLE ALL DAMPER OPERATORS
SHALL BE OF SUFFlqENT SIZE AND NUMBER TO OPERATE THEIR RESPECTNE DAMPERS SMOOTHLV AGAWST FRICTION
AN� AIR FLOW. DAMPER OPERATORS SHALL HAVE EXTERNAL ADJUSTABLE STOPS TO LIMITTHE STROKE M EITHER
DIRECTION, IF REQUIRED FOR PROPER OPERATION. DAMPER MOTORS SHALL SPRING RETURN TO THE FAIL SAFE
POSITION. SEEPOSITIONINGRELAVSFORADDITIONALREpUIREMENTS.
2) SMOKEANDCOMBINATIONFIREISMOKEDAMPERSATUNIT,OUTSIDEAIR,RETURNAIRANDRELIEFAIRDAMPERSFOR
SVSTEMS M EXCESS OF 15000 CFM SHALL CLOSE, WHEN FAN IS OFF SMOKE AND COMBINATION RREISMOKE DAMPERS
SHALL HAVE 60 SECOND DELAV IN CLOSIN6 AND 20 SECOND RAPID OPENING.
3) ELECTRIC/ELECTRONIC DAMPER ACTUATORS SHALL HAVE OIL IMMERSEO MOTORS AND BE FULLV MODULATING OR TWO
POSITION AS HEREINAFTER REpUIRED. THEV SHALL HAVE SPRINGS TO FAIL IN THE SAFE POSITION UPON POWER FAI WRE.
CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS TO W IRE OR DELNER CONTROLLED AIR TO DAMPER
OPERATORS.
L ROOMTHERMOSTATS'.
1) ALL THERMOSTATS SHALL HAVE ADJUSTABLE SENSITIVITY AND SHALL BE OF THE FULLV PROPORTIONING TYPE,
COMPATIBLE W ITH THE BMS OR CONTROLS SVSTEM.
2) THERMOSTATS SHALL BE DIGITAL TVPE, W ITH CAPABILITV OF 7-DAY PROGRAMMABLE SCHEDULE.
3) PROVIDEEACHTHERMOSTATWITHAQEARTAMPERPROOFCOVER.
M. TRANSMITTERS ANO SENSORS:
1) ALL TR4NSMITTERS SENSING AIR TEMPERATURE SHALL BE CAPABLE OF MEASURWG SPACE OR Dl1CT TEMPERATURE AND
TRANSMITTING A PNEUMATIC SIGNAL DIRECTLV PROPORTIONAL TO THE TEMPERATURE. THE RANGE OF THE
TRANSMITTERS SHALL BE 50°. PoR ROOM AIR SENSING, AND 100°. OR 200°. FOR ALL OTHER SENSING, AS APPROVED. EACH
TRANSMISSION SVSTEM SHALL HAVE AN ACCURACY OF 1% OF SCALE RANGE ALL TRANSMITTERS SHALL BE LOCATE� AT
POINT OF MFASUREMENT, W ITH INSTRUMENT CASE LOCATED OUTSI�E OF UNIT OR �UCTWORK W ITH CAPILLARIES AND
SENSING BULBS AS OESCRIBED ABOVE THE THERMOSTATS.
2) DUCT STATIC PRESSURE TRANSMITTERS SHALL BE OF INDUSTRIAL �UALITV HAVING A MINIMUM 8" DIAMETER SENSING
DIAPHRAGM AN� A FORCE BALANCED RELAV. THEY SHALL BE 2 PIPE NON_BLEED W STRUMENTS.
3) WATER PRESSURE TRANSMITTERS SHALL BE OF THE SAME OUALITV AS TEMPERATURE TRANSMITTERS.
4) HUMIDITV,DEWPOWTORWETBULBTRANSMITTERSSHALLBEOFTHESAMEQUALITVASTEMPERATURETRANSMITTERS.
5) ELECTRONIC SENSORS SHALL HAVE LINEAR PRECISION RESISTANCE ELEMENTS. THEIR ACCURACV SHALL BE 1° OVER THE
FULLRANGEOFTHESENSOR.
6) DUCT SENSING ELEMENT SHALL BE NO LESS THAN ONE QUARTER OF THE DUCT WIDTH OR DIAMETER FROM THE DUCT
W ALL.
N. SERVICE:
1) AFTER COMPLETION OF THE CONTROL SVSTEM INSTALLATION, THE CONTROL MANUFACTURER SHALL REGULATE AND
ADJUST ALL THERMOSTATS, CONTROL VALVES, DAMPER ACTUATORS. ETG, AND PLACE IN COMPLETE OPERATING
CONDITION, SUBJECT TO THE APPROVAL OF THE ARCHITECT. THE CONTROL CONTRACTOR SHALL PROVIDE TWO
COMPLETE INSTRUCTION MANUALS, IN ADDITION TO ANV OTHER MANUALS CALLED FOR IN THIS SPEqRCATION, TO THE
OWNER'SOPERATINGPERSONNEL THEMANUALSHALLINCWDETHEFUNCTIONANDOPER4TIONOFALLCONTROL
COMPONENTS ON THIS PROJECT. COMPLETE WSTRUCTION SHALL BE GIVEN TO THE OPERATING PERSONNEL. THERE
SHALL BE TWO DAY'S INSTRUCTION GNEN TO W INTER CVCLE AND TWO �AV'S INSTRUCTION FOR SUMMER CVCLE
OPERATION.
O. CONTROLSEQUENCE
1) SEE CONTROLS DIAGRAMS
10. COMMISSIONING'.
A. COMMISSIONING IS NOT REQUIRED.
�
/ ♦ 1
�
INDUSTRIOUS
COWORKING
880 W MONON GREEN BLVD
CARMEL qTV, IN 460323
OWNERRENANi
INDUSTRIOUS
215PARKAVES,4E1300
NEW YORK, NY 10003
ARCNI7ECTOFRECORD
NORF
325 N LASALLE Si- SOIiE 500
CHICAGO. IL 60654
PEiER-DUBWC.ANORR-COM
312-0242400
MEFENG/NEER
MEENGINEERS
29 WEST 38iH SiREEi, SiH FLOOR
NEW YORK. NY 10018
CONiAQ: BRIAN SHASSIAN
BRIANSHASSIAN@ME-ENGINEER$_COM
JOHN HIGGINS
JOHN.HIGGWS(�MEENGINEERS.COM
�212J 44]-6]]0 PHONE
LIGHi1NGDESIGNER
REGENCY
9261 JOkDAN AVE
CHAiSwORiH, GA
800-28d-202a
ISSUEDATES
REV. DAiE DESCRIPiION
06/OS/2020 DD3
06/18/2020 CDvI
0]/06/2020 CDv2
0]/16/2020 PERMIT
SEAL & SIGNATURE
PR0./ECTNAME
CARMEL CITY- 880 MONON GREEN
VROJECiNUMBER
IND880MON
DRAWING TITLE
MECHANICALSPECSI
SCALE
7/8„_ ��_�„
SHEETNUMBER
M-020
BY CHEGK
ME ME
ME ME
ME ME
ME ME
�