HomeMy WebLinkAboutP000 Plumbing LegendPLUMBING LEGEND
( NOTALL SYMBOLS LISTED BELOW ARE aEING USEo IN THIS SETOF PLUMBING DRAWINGS )
GENERALSYMBOLS/ABBR.
SVMBOL ABBR DESCRIPTION
� EQUIPMENT/RXTURE
DESI6NATION
�� SHEET KEV NOTES
— �
POINT OF CONN. (CONN. NEW
� POC TO EXISTING)
�� POD POINTOFDISCONNECTION
UP
DN
ARROW INDICATESOIRECTION
OFFLOW
RISE IN DIRECTION OF FLOW
DROP IN DIRECTION OF FLOW
AFF ABOVEFINISHEDFLOOR
AFG ABOVEFINISHEDGRADE
BOP BOTTOM OF PIPE (AFF)
BS BELOW SLAB
CL CENTERLWE
DN DOWN
EL ELEVATION
INV INVERT
NTS NOTTOSCALE
SQ.FT S�UARE FEET
TOP TOP OF PIPE (AFF)
(E) EXISTING
(R) REMOVE
SITE/BLDG INFRASTRUCTURE
SVMBOL AeaR DESCRIPTION
F FlRE
SP SPRINKLER
BFP BACKFLOW PREVEMER
� OCOA DOUBLECHECKDETECTOR
ASSEMBLY
�I-po- DCVA DOUBLE CHECK VALVE
ASSEMBLY
OCV DOUBLE CHECK VALVE
FAI FRESH AIR INTAKE
HT HOUSE TR4P
LE INVERTELEVATION
REDUCEDPRESSUREZONE
-0�-N�HD:� RPZ ASSEMBLY
� TB THRUSTBLOCK
OM M METER
GENERAL PIPING
SVMBOL ABBR DESCRIPTION
EXISTING PIPING
(LIOHT SOLI� LINE)
----------- EXISTING PIPING TO BE
REM W ED (DASHED L W E)
--- CW DOMESTICCOLDWATER
---- HW DOMESTIC HOT WATER
T TEMPEREDWATER
----- HWC DOMESTICHOTWATER
CIRWLATWG
THW DOMESTIC TEMP. HOT WATER
SAN SANITARYWASTEABOVEFLOOR
— — — UGS SANITARV WASTE BELOW
FLOOR (UNDER GROUND)
----------- V SANITARV VENT
DR EQUIP. DRAIN
—2"SAN — PIPE SIZH PIPE TVPE
ROOF/STORM
SVMBOL ABBR DESCRIPTION
69�RY[�]:I���JIJI�[H_VDll/ytlPDl:�
ST STORM PIPING BELOW FLOOR
OD STORMOVERFLOWABOVE
FLOOR
— — — OD STORM OVERFLOW BELOW
FLOOR
OO RD ROOF DR41N
OO OD OVERFLOW ROOF DRAIN
� DSN DOWNSPOUTNOZZLE
0 A� AREADRAIN
SVMBOL
���J
�I�
�
�
���
4 Fs
4os
�
�
C
�
�
�I
L�`
�
�
�
�
�
�
��
�
JIL
FITTINGS
ABBR I DESCRIPTION
EJ EXPANSIONJOINT
U UNION
THERMOMETER
W/THERMOW ELL
AV AIR VENT
FC REXIBLEPIPECONNECTOR
FS FLOW SWITCH
PS PRESSURESWITCH
PRESSURE GAUGE WIGAUGE
P� WCK
ELBOW UP
ELBOW DOWN
TEE UP
rEE oowN
PIPE CAP OR PLUG
CO CLEANOUTPLUG
'� ° ^ HOSE BIBB, WALL HVDRANT
VB VACUUMBREAKER
SA $HOCK ARRESTOR
FD FLOOR DRAIN
CODP/ FLOORCLEANOUT
FCO
FS FLOOR SINK
CR CONCENTRIC REDUCER
WCO WALLCLEANOUT
CR CONCENTRIC REOUCER
ER ECCENTRICRE�UCER
VTR VENTTHRUROOF
VALVES
SVMBOL ABBR DESCRIPTION
�� pV DRAIN VALVE W/HOSE END
CONN
� CHECKVALVEW/INDICATION
CV OFFLOWDIRECTION
� PRV PRESSURE REDUqNG VALVE
IJJ
SV SOLENOIDVALVE
FC AUTO FLOW CONTROL VALVE W/
I iI FW TEST PORTS
LJ
� CS,BV CIRCUITSETTERORBALANCING
VALVE
M GLOBE VALVE (STRAIGHT
I%J GLV pqTTERN)
� GLOBE VALVE (ANGLE
GLV PATTERN)
�l � BFV BUTTERFLV VALVE
� BV BALLVALVE
� TCV THERMOSTATICMIXING
VALVE, 2-WAV
y X F TCV THERMOSTATIC MIXING
4� VALVE, &WAV
� � TEMPER4TURE/PRESSIIRE
, uN, � TPR RELIEF VALVE
� VALVE IN RISER
� STRAINERWBLOW-OFF&
STR CAPPED HOSE-END
CONNECTION
� GV GATE VALVE
� OS&V OUTSIDE STEM AND VOKE
M ECHANICAL/PLUMBING/
SPRIN KLER/ELECTRICAL
COORDINATION REQUIREMENTS
FOR MECHANICAL ANo P W MBING E�UIPMENT AS
INDICATED ON THE �NISION 21, 22, AN� 23 DRAWINGS,
THE DIVISION 21, 22 AND 23 CONTRACTORS SHALL
COORDINATE W ITH DIVISION 26 CONTRACTOR TO
CONNECT ALL MECHANICAL AND PWMBING
EQUIPMENT INDICATED ON THE MECHANICAL AND
PLUMBING DRAW INGS. COORDINATE FOR COMPLETE
W IRING, STARTERS, AND DISCONNECTING MEANS FOR
ALL MECHANICAL AND PW MBING EQUIPMENT.
PLUMBING SPECIFICATIONS
1. GENERAL
A. ALLWORKSHALLCONFORMTOLOCALPWMBINGCODESANDALLOTHER
AUTHORITI ES HAVING lURISDICTION. CONTRACTOR SHALL FlLE AND OBTAIN ALL
APPROVALS.
B. OBTAIN AND PAY FOR ALL PERMITS, CERTIFlCATES, ETC, AS REQUIRED.
C. DELIVERCERTIFlCATEOFFlNALWSPECTIONTOTHEARCHITECTBEFOREAPPLVING
FORFINALPAVMENT.
D. VERIFYFlELDCONDITIONSBEFORESUBMITTINGBID.ANVMINORCHANGES
REQUIRED DUE TO EXISTING CONDITIONS SHALL BE MADE W ITH NO ADDITIONAL
COST.
E. PITCH HORIZONTFLSNNITARVAND WASTE DRAINAGE PIPING 1/4" PER FOOT
MINIMUM.
E GUARANTEEALLWORK,MATERIAL,ANDEQUIPMENTFORAPERIODOFONEVEAR
FROM DATE OF FlNAL NCCEPTANCE.
G. PERFORMNTTINGANDPATCHINGASREQUIRED.
H. THECONTRACTORSHALLCONNEQTOTHEE%6TINGSANITARV,VENT,HOTAND
COLD WATER PIPING AS REQUIRED.
2 SHOPDRAWINGS
A. TH6CONTRAQORSHALLSUBMITSHOPDRAWINGSOFALLMAIOREQUIPMENTTO
THE ARCHITEQ FOR APPROVAL.
3. AS-BUILTDRAWINGS
A CONTRACTORSHALLPREPAREANDSUBMITTOTHEARCHITECT"AS-BUILT"
DRAWINGS INDICATING THE EXAQ LOCATION OF PIPING, FI%TURES, ETC.
4. HANGERSANDSUPPORTS
A. ALLHORIZONTALRUNSOFCASTIRON,WASTEANDVENTPIPESHALLBEFIRMLV
SUPPORTED IN PLACE W ITH APPROVED CLEVIS OR TRAPEZE TVPE HANGERS AND
SUPPORTS SPACED EVERY 5 FEET AND AT EACH IOINT. W HERE A CONCENTRATION
OF FlTTINGS OCCURS, ADDITIONAL SUPPORTS SHALL BE PROV IDED CONSISTENT
WITH GOODTRADE PRACTICES.
B. ALLOTHER HOft120NTAL RUNSOF PIPING SHALL BE FIRMLVSUPPORTED IN PLNCE
W ITH APPROVED CLEVIS OR TRAPEZE HANGERS AND SUPPORTS IN MAXIMUM
INTERVALS AS FOLLOWS�.
AEEL PIPE UP TO 1-1/2"-S'-0", 1-1/2" TO 2-1/2"-10'-0", 3" AND LFRGER 12'-0".
COPPER TUBING: UP TO 1-1/4"-6'-0", UP TO 2-1/2"-10'-0".
5. INSULATION
A. ALL HOT WATERAND COLD WATER PIPING SHALL BE INSULATE� WITH 1" THICK
FlBER6LFSS PIPE WSULATION WITH VAPOR BARRIER IAGKET.
B. INSUL4TION WSTALLE� ABOVE CEILING SHALL BE RATED FOR PLENUM
INSTALLATIONS W ITH FL4ME SPREAD INDEX OF 25 OR LESS AND SMOKE INDEX OF
50 OR LE55.
6. VALVES
A. DOMESTICWATER: PROVIDESHUT-OFFVALVESSIMILARTONIBCOT-113-LFOR
APPROVED EQUAL ALL WATER VALVES SHALL HAVE A MINIMUM WATER WORKING
PRESSURE OF 125 P51. ALL DOMESTIC WATER VALVES SHALL BE NSF61 CERTIFlED.
B. CONTRACTORSHALLFURNISHANDMSTALLALLBAIXFLOWPREVENTERS,VACUUM
BREAKERS, VALVES, UNIONS, AND BVPASS PIPING AS REQUIRED BV THE LOCAL
UTILITIES AND CODES.
]. PIPEANDFITTING
A. HOTANDCOLDWATEftPIPINGSHALLBETVPE"L"COPPERHARDTEMPERASTM
B-88 W ITH SOLDER JOINTS, 95/5 SOLDER. BRAZIN6 MATERIAL SHALL CONTAIN NOT
MORE THAN 0.02% LEAD IN ACCORDANCE W ITH EPA REQUIREMENTS.
PLUMBING FIXTURE SCHEDULE
CODE FIXTURE CWCONN. HWCONN. SANCONN. VENTCONN. IWCONN. MANUFACTURERBMODELNO. FAUCETIFLUSHVALVE ACCESSORIES/COMMENTS
E-OS ICEMACHME 1IP' - - - 1" SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS VB,FLTR
E-0]C DISHWASHER - 1/2" 1-012" - - SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS PROVIDEDRAINTOWVECONNECTIONBELOWSINK
E01D DISHWASHER - il2" 1412" - - SEEARCHITECTURALSPEGRCATIONS SEEARCHITECTURALSPEpRCATIONS PROVIDEDRAINTOWVECONNECTIONBELOWSINK
E-OB.E40 KITCHENSINK 1IP' 1I2" 1-V2" 1-VP' - SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS MV
E-12 WATERDISPENSER il2" - - - - SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS VB,FLTER
E2QE-22 LAV 1l2" il2" 1412" 1-V2" - SEEARCHITECTURALSPEGRCATIONS SEEARCHITECTURALSPECIRCATIONS MV
E-42 COFFEEMAKER 1IP' - - - - SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS VB,FLTR,BFP
E-5� DRMKINGFOUNTAIN il2" V2" 1-012" 1-1/2" - SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS VB,FLTR,BFP
E-53 WATERCLOSET 1" - 4" 2" - SEEARCHITECTURALSPEGRCATIONS SEEARCHITECTURALSPEpRCATIONS
E-54 URINAL 1" - A" T' - SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS
E-SS,E-56 LAV il2" V2" - - - SEEARCHITECTURALSPECIFICATIONS SEEARCHITECTURALSPEQFICATIONS MV
FD FLOORDRAIN - - SEEPLANS 2" - ZURN24156 PROVIDEWATERLESSTRAPSEALORTRAPPRIMER
GENERALNOTES
1. PLUMBING DESIGN AND SIZES ARE BASED ON THE 2015 UNIFORM PLUMBWG CODE.
2 ALL EXPOSED PIPING SERVING PW MBING FIXTURES THAT MAV BE USED FOR ADA PURPOSES SHALL TRAPS AND SUPPLIES INSULATED PER ADA REOUIREMENTS.
3. RNISH AND TVPE OF ALL RXTURES AND FAUCETS ARE SUBJECT TO ARCHITECT APPROVAL.
A. EACH PW MBING FI%TURE SHALL BE PROVIDED W ITH A P-TRAP, EXCEPT THOSE W ITH INTEGRAL TRAPS.
5. EXTEND INDIRECT WASTE FULL SIZE TO NEAREST SINK HUB DRAIN UNLE55 OTHERWISE NOTED ON PLANS.
fl FAUCET SHALL BE LEAD FREE AS PER COMPLIANCE W ITH NSF 61.
ACCESSORVCOOES
TP = TRAP PRIMER BFP = BACKFLOW PREVENTER, ASSE 1 W 2 OR 1024 COMPLIANT.
VB = VAW UM BREAKER
FLTR = FILTER, SEE RISER DIAGRAM FOR MODEL
MV = POINT-0FUSE MIXING VALVE, ASSE 10�0 COMPLIANT
CODE
1
2
DOMESTIC WATER HEATER SCHEDULE (ELECTRIC)
MANUFACTURERI STORAGE RECOVERV TEMP. ELECTRICAL
MODEL NQ LOCATION (GAL) (GPH) RISE KW VOLT PH FLA DISC FEEDER
AOSMITHIDEL40 168-GALLEV 10 20 60 4 208 1 144 30 3#74#70G,314"C
AOSMITH/DEL-10 225-KITCHENETTE 10 20 60 4 208 1 144 30 3#10,N10G,314"C
1. HEAT EXCHANGER AND TANK TO BE ASSEMBLED AT THE FACTORY AN� SHIPPED FULLY ASSEMBLED.
2. ROUTE T&P RELIEF VALVES TO DRIP PAN.
3. MUST BE NSF APPROVED.
4. PROVIDE W ITH TEMPERING VALVE ON OUTLET OF HEATER COMPLIANT W ITH ASSE 1011.
REMARKNOTES
A. PROVIDE W ITH DRIP PAN, LEAK DETECTOR AND SOLENOID SHUTOFF ON WCOMING CW LME LEAK DETECTOR SHALL CLOSE SOLENOID. CONNECT TO BMS.
B. PROVI�E WITH 120V HW CIRC PUMP ON HWC LINEANDTIMER CONTROLS.
C. PROVIDE ASSE 10]0 COMPLIANT TEMPERING VALVE FOR RESTROOM LAVATORIES.
GENERAL
MANUFACTUREW
CODE MODELNO.
PUMP SCHEDULE
PUMP DATA
SERVICE I LOCATION I TVPE I GPM I ffTl�
1. PUMP SHALL BE INSTALLE� IN A LOCATION W ITH ADEQUATE ACCESS FOR MAINTENANCE.
2. PUMP SHALL BE APPROVED FOR USE IN POTABLE WATER SVSTEM..
3. CONTROL VIA HWC PIPE ADUASTAT. PUMP ON BELOW 100 DEGF, OFF AT 105 DEGF.
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
r
�un��V l�rc�alols�.
�
DATE: OH�Z5�2O
ELECTRICAL
REMARKS
0
0
W I VOLT I PH I HZ I REMARKS
B. SOIL,WASTEANDVENTPIPINGSHALLBENO-HUB,STANDARDWEI6HT,CAAIRON
SOIL PIPE AND RTTINGS OR GALVANIZED STEEL SCREW PIPE WITH GALVANIZED
CAST IRON RECESSED DRAINAGE FITTINGS, WITH GALVANRED MALLEABLE BEADED
FITTINGS FOR VENT PIPING.
C ALLBURIEDSOIL,WASTE,ACIDWASTEANDVENTPIPINGTOBEWRAVPEDWITH
ASPHALTUM TAPE.
8. PWMBINGFlXTURES
A. PLUMBINGFlXTURESTOCOMPLVWITHALLLOCALCO�ES.
9. STERILRATION
A. THERENOVATEDPORTIONOFTHEE%ISTINGDOMESTICWATERPIPINGSVSTEMAND
THE NE W DOMESTIC WATER PIPING SHALL 8E THOROUGHLV AERILIZED W ITH
CHLORME BEFORE ACCEPTANCE FOR DOMESTIC OPERATION.
B. THEAMOUNTOFCHLORWEAPPLIEDSHALLBESUCHASTOPROVI�EADOSAGEOF
NOT LESS THAN 50 PARTS PER MILLION. THE CHLORINATING MATERIAL SHALL BE
EITHER LIqUID CHLORINE OR SODIUM HVPOCHLORITE SOLUTION, ALL IN
ACCORDANCE WITH CODE REQUIREMENTS.
10. TESTS
A. TESTSFORPIPINGSVSTEMSSHALLBEINACCORDANCEWITHTHEBUILOINGCODE.
ALL TESTS SHALL BE W ITNESSED 8Y ARCHITEQ OR HIS REPRESENTATNE,
INSPECTORS,ETG ATLEAST48HOUftSNOTICESHALLBEGNENINADVANCEOFALL
TESTS.
11. COORDINATIONDRAWINGS
A. PREPARECOMPOSITEWORKINGDRAWINGSANDSECTIONSATASUITABLESCALE
NOT LESSTHAN 3/8" =1'-0" QEARLYSHOWING HOW THE WORK ISTO BE
I NSTALLED IN REL4TION TO THE W ORK OF OTHER TRADES. IF THE I NSTALLATION IS
MA�E BEFORE COOR�INATING WITH OTHER TRADES, MAKE ALL NECESSARY
CHANGES IN THE WORK W ITHOUT E%TRA CHARGE TO THE OW NER.
B. BEFORESUBMITTIN6SHOPDRAWINGSFORSLEEVES,PIPINGANDDUCTWORK,THE
HEATING, VENTILATING AND AIR CONDITIONING CONTRACTOR SHALL PREPNRE A
COMBW ED 3/8" = 1'-0" SCALE SHOP �RAWING FOR PIPING AND DUQWORK
INDICATING LOCATION OF PIPING AND DUQWORK WITH DIMENSIONS. A
TRANSPARENT COPV OF THESE SHOP DRA W INGS SHALL BEGIVEN TO THE
ELECTRICAL CONTRACTOR.
/ 1
INDUSTRIOUS
COWORKING
880 W MONON GREEN BLVD
CARMEL qTV, IN 460323
OWNERRENANi
INDUSTRIOUS
215PARKAVES,4E1300
NEW YORK, NY 10003
ARCNI7ECTOFRECORD
NORF
325 N LASALLE Si- SOIiE 500
CHICAGO. IL 60654
PEiER-DUBWC.ANORR-COM
312-0242400
MEFENG/NEER
MEENGINEERS
29 WEST 38iH SiREEi, SiH FLOOR
NEW YORK. NY 10018
CONiAQ: BRIAN SHASSIAN
BRIANSHASSIAN@ME-ENGINEER$_COM
JOHN HIGGINS
JOHN.HIGGWS(�MEENGINEERS.COM
�212J 44]-6]]0 PHONE
LIGHi1NGDESIGNER
REGENCY
9261 JOkDAN AVE
CHAiSWORiH, GA
800-28d-202a
ISSUEDATES
REV. DAiE DESCRIPiION
06/OS/2020 DD3
06/18/2020 CDvI
0]/06/2020 CDv2
0]/16/2020 PERMIT
SEAL & SIGNATURE
BY CHEGK
ME ME
ME ME
ME ME
ME ME
PR0./ECTNAME
CARMEL CITY- 880 MONON GREEN
VROJECiNUMBER
IND880MON
DRAWING TITLE
PLUMBING LEGEND
SCALE
7/8„_ ��_�„
SHEETNUMBER
P-000
oF