Loading...
HomeMy WebLinkAboutIMG_0219. Review Cycle History CYCLE DEPARTMENT Building Engineering Plan Review Planning & Zoning Building Engineering Plan Review Planning & Zoning REVIEWED BY Mike Sheeks msheeks@carmel.in.gov Alex Jordan ajordan@carmel.in.gov Christina Jesse cjesse@carmel.in.gov Mike Sheeks msheeks@carmel.in.gov Alex Jordan ajordan@carmel.in.gov Christina Jesse cjesse@carmel.in.gov REVIEW STATUS REVIEWER COMMENTS Request for Information Request for Information Request for Information Once the consent to encroach is processed arc' ..,,proved, we will allow the release of the building permit. Please provide a plan that shows joist direction and placement (not joist needs to be drawn in) along with any support beam locations. Please also provide a footing detail/sketch that shows the depth to a min. of 30 inches down to frost line and min. diameters of 12 inch for 4x4 and 18 inches for a 6x6 or 3 times the size of the post. Last item, please state/show that the beams, joists or ban board (which ever is appropriate) will sit on top of the posts or provide the mechanical connection to be used. (le.... brackets or hangers) . Code does not allow bolting to the side of posts unless it is approved/made for bracket to do so. Please let me know if you have any questions. msheeks@carmel.in.gov. Thank you, Mike S. A consent to encroach will need to be applied for to construct the deck within the drainage easement. The consent to encroach application can be found here: hftps://www.carmel.in.gov/home/showdocum... id=7933. Please have this submitted for review at your earliest convenience. Also, will any equipment the size of a bobcat, mini excavator, or larger be used for this project? If so, we will require a right-of-way permit and $5,000 license and permit bond. The permit can be applied for at the following site: http://carmel. in.gov/department- services/engineering/right-of-way-information. Please label the requested setback distances from the proposed deck location to the Request for property lines on the plot plan. Please also Information obtain consent to encroach into the 50' drainage easement and upload an HOA letter of approval to the documents folder. Thanks! APPLICANT COMMENTS 1. 1 have attached the file (Beams joist and post details) which shows the direction of the joist and it's placement. 2. All the positions of the footings have been mentioned with a depth of 30 inches and all the posts are 6 X 6. 3. The depth of all the 6 X 6 footing holes will have an 18 in diameter. 4. There will be a double beam in the center and the joist will be 10 ft on each side. 5. All the mechanical connections will be hangers. 6. Bolting will not be used on the side of the posts. 1. We are not using any equipment the size of a bobcat, mini excavator, or larger. 2. Attached consent form file ( Consent to Encroach agreement) 1. Consent to encroach agreement attached. 2. Contingency approval from HOA email chain is attached