HomeMy WebLinkAboutIMG_0219. Review Cycle History
CYCLE DEPARTMENT
Building
Engineering Plan Review
Planning & Zoning
Building
Engineering Plan Review
Planning & Zoning
REVIEWED BY
Mike Sheeks msheeks@carmel.in.gov
Alex Jordan ajordan@carmel.in.gov
Christina Jesse cjesse@carmel.in.gov
Mike Sheeks msheeks@carmel.in.gov
Alex Jordan ajordan@carmel.in.gov
Christina Jesse cjesse@carmel.in.gov
REVIEW STATUS REVIEWER COMMENTS
Request for
Information
Request for
Information
Request for
Information
Once the consent to encroach is processed
arc' ..,,proved, we will allow the release of the
building permit.
Please provide a plan that shows joist direction
and placement (not joist needs to be drawn in)
along with any support beam locations. Please
also provide a footing detail/sketch that shows
the depth to a min. of 30 inches down to frost
line and min. diameters of 12 inch for 4x4 and
18 inches for a 6x6 or 3 times the size of the
post. Last item, please state/show that the
beams, joists or ban board (which ever is
appropriate) will sit on top of the posts or
provide the mechanical connection to be used.
(le.... brackets or hangers) . Code does not
allow bolting to the side of posts unless it is
approved/made for bracket to do so. Please let
me know if you have any questions.
msheeks@carmel.in.gov. Thank you, Mike S.
A consent to encroach will need to be applied
for to construct the deck within the drainage
easement. The consent to encroach
application can be found here:
hftps://www.carmel.in.gov/home/showdocum...
id=7933. Please have this submitted for review
at your earliest convenience. Also, will any
equipment the size of a bobcat, mini
excavator, or larger be used for this project? If
so, we will require a right-of-way permit and
$5,000 license and permit bond. The permit
can be applied for at the following site:
http://carmel. in.gov/department-
services/engineering/right-of-way-information.
Please label the requested setback distances
from the proposed deck location to the
Request for property lines on the plot plan. Please also
Information obtain consent to encroach into the 50'
drainage easement and upload an HOA letter
of approval to the documents folder. Thanks!
APPLICANT COMMENTS
1. 1 have attached the file (Beams joist and
post details) which shows the direction of the
joist and it's placement. 2. All the positions of
the footings have been mentioned with a
depth of 30 inches and all the posts are 6 X 6.
3. The depth of all the 6 X 6 footing holes will
have an 18 in diameter. 4. There will be a
double beam in the center and the joist will be
10 ft on each side. 5. All the mechanical
connections will be hangers. 6. Bolting will not
be used on the side of the posts.
1. We are not using any equipment the size of
a bobcat, mini excavator, or larger. 2. Attached
consent form file ( Consent to Encroach
agreement)
1. Consent to encroach agreement attached.
2. Contingency approval from HOA email
chain is attached