HomeMy WebLinkAboutC101 - EROSION CONTROL PLANPROPOSED 3 BED HOUSE
ATTACHED GARAGE
PROPOSED DRIVE
STONE DURING
CONSTRUCTION
PROPERTY
LINES
2ND STREET SOUTHWEST
PROPERTY
LINES
PROPERTY
LINES
EXISTING GRAVEL
DRIVE CONSTRUCTION
ENTRANCE
ERROSION CONTROL FENCING
ERROSION CONTROL FENCING
ERROSION CONTROL FENCING
SUMP PUMP
DISCHARGE
CONNECTED TO
STORM
CONCRETE WAHSOUT
CATCH BASIN
OR DRAIN SOCK
TO GUARD STORM
SURFACE DRAIN
GENERAL NOTES
.20 ACRE LOT DISTURBANCE
SUMP PUMP
DISCHARGE
CONNECTED TO
STORM
C2017 CALIBRATED CONSULTING
654 Hickory Dr
Tipton, IN 46072
T 765-432-8150
General Contractor:
PROJECT #:
DRAWN BY: CLIFF
24x36 SHEET:
11x17 SHEET:
SCALE
BRYAN RAGAN CONS.
3056 S. 100 E.
TIPTON, IN 46072
T 765-292-2502
F 765-292-2502
CALIBRATED CONSULTING LLC
DATE:JUNE 16, 2020
1" = 10'-0"Jennifer BairdNEW HOME310 2nd Street SouthwestCarmel, IN 4603200210
C101
EROSION
CONTROL
PLAN
1" = 20'-0"
N RevisionsNo. Date Description08/28/20
Nick Mishler