Loading...
HomeMy WebLinkAboutP101 - BASEMENT & FIRST FLOOR PLUMBINGWD DN UP UP DN 2"ø 3"ø 3"ø 3"ø 3"ø4"ø 4"ø 4"ø 2"ø 2"ø 4"ø2"ø2"ø 2"ø4"ø CLEANOUT 2" SAN DOWN TO SEWAGE PIT REFER TO SITE PLAN SHEET A000 FOR SANITARY CONTINUATION VENT FOR SEWAGE PIT 2" VENT UP2"ø 2" STORM FROM SUMP PIT 2" STORM FROM SUMP PIT2"ø 2"ø2"ø REFER TO SITE PLAN SHEET A000 FOR STORM CONTINUATION 2" RADON VENT UP 3"ø 2"ø 2"øHearth Room Kitchen Mudroom Laundry Main Bathroom Powder Foyer Dining Garage Front Porch Back Porch Stair Bedroom 2 Closet 2 Pantry 2" SAN DOWN 1-1/2" SAN DOWN 1-1/2" SAN DOWN 3" SAN DOWN 3" SAN DOWN 3" SAN DOWN 2" SAN DOWN 3" SAN DOWN 3"ø 2" SAN DOWN 2" SAN DOWN 2" VENT UP VENTING ADJACENT SINK & WASHER BOX 2" VENT UP VENTING ADJACENT TOILET & SINK 2" VENT UP VENTING ADJACENT TOILET & SINK 2" VENT UP VENTING ADJACENT TUB SHOWER 2" RADON VENT FROM BASEMENT 2" SAN DOWN Plumbing Symbols SANITARY PIPE UP RISE UP TO NEXT LEVEL PIPE DROP VENT STORM C2017 CALIBRATED CONSULTING 654 Hickory Dr Tipton, IN 46072 T 765-432-8150 General Contractor: PROJECT #: DRAWN BY: CLIFF 24x36 SHEET: 11x17 SHEET: SCALE BRYAN RAGAN CONS. 3056 S. 100 E. TIPTON, IN 46072 T 765-292-2502 F 765-292-2502 CALIBRATED CONSULTING LLC DATE:JUNE 16, 2020 1/4" = 1'-0"Jennifer BairdNEW HOME310 2nd Street SouthwestCarmel, IN 4603200210 P101 BASEMENT & FIRST FLOOR PLUMBING 1/8" = 1'-0"RevisionsNo. Date Description08/28/20 Nick Mishler