HomeMy WebLinkAboutP101 - BASEMENT & FIRST FLOOR PLUMBINGWD
DN
UP
UP
DN
2"ø
3"ø
3"ø 3"ø
3"ø4"ø 4"ø 4"ø 2"ø 2"ø 4"ø2"ø2"ø
2"ø4"ø CLEANOUT
2" SAN DOWN
TO SEWAGE
PIT
REFER TO SITE PLAN
SHEET A000 FOR
SANITARY CONTINUATION
VENT
FOR SEWAGE
PIT
2" VENT UP2"ø
2" STORM FROM
SUMP PIT
2" STORM FROM
SUMP PIT2"ø 2"ø2"ø REFER TO SITE PLAN
SHEET A000 FOR
STORM CONTINUATION
2" RADON
VENT UP
3"ø
2"ø
2"øHearth Room
Kitchen
Mudroom
Laundry
Main Bathroom
Powder
Foyer
Dining
Garage
Front Porch
Back Porch
Stair
Bedroom 2
Closet 2
Pantry
2" SAN DOWN
1-1/2" SAN DOWN
1-1/2" SAN DOWN
3" SAN DOWN
3" SAN DOWN
3" SAN DOWN
2" SAN DOWN
3" SAN DOWN
3"ø
2" SAN DOWN
2" SAN DOWN
2" VENT UP
VENTING ADJACENT
SINK & WASHER BOX
2" VENT UP
VENTING ADJACENT
TOILET & SINK
2" VENT UP
VENTING ADJACENT
TOILET & SINK
2" VENT UP
VENTING ADJACENT
TUB SHOWER
2" RADON
VENT FROM
BASEMENT
2" SAN DOWN
Plumbing Symbols
SANITARY
PIPE UP RISE UP
TO NEXT LEVEL
PIPE DROP
VENT
STORM
C2017 CALIBRATED CONSULTING
654 Hickory Dr
Tipton, IN 46072
T 765-432-8150
General Contractor:
PROJECT #:
DRAWN BY: CLIFF
24x36 SHEET:
11x17 SHEET:
SCALE
BRYAN RAGAN CONS.
3056 S. 100 E.
TIPTON, IN 46072
T 765-292-2502
F 765-292-2502
CALIBRATED CONSULTING LLC
DATE:JUNE 16, 2020
1/4" = 1'-0"Jennifer BairdNEW HOME310 2nd Street SouthwestCarmel, IN 4603200210
P101
BASEMENT &
FIRST
FLOOR
PLUMBING
1/8" = 1'-0"RevisionsNo. Date Description08/28/20
Nick Mishler