HomeMy WebLinkAboutP102 - SECOND FLOOR PLUMBINGDN
DN
Bedroom 3
Loft
BathroomMaster ClosetMaster Bathroom
Master Bedroom
1-1/2" SAN DOWN
2" SAN DOWN
3" SAN DOWN
1-1/2" SAN DOWN
3" SAN DOWN
2" SAN DOWN
2" VENT UP
VENTING ADJACENT
TOILET, SINK,
AND TUB SHOWER
3" VENT UP
THRU ROOF
2" VENT UP
VENTING
ADJACENT SINKS
2" VENT UP
VENTING ADJACENT
SHOWER
2" VENT UP
VENTING
ADJACENT TOILET
2" RADON VENT UP
THRU ROOF
C2017 CALIBRATED CONSULTING
654 Hickory Dr
Tipton, IN 46072
T 765-432-8150
General Contractor:
PROJECT #:
DRAWN BY: CLIFF
24x36 SHEET:
11x17 SHEET:
SCALE
BRYAN RAGAN CONS.
3056 S. 100 E.
TIPTON, IN 46072
T 765-292-2502
F 765-292-2502
CALIBRATED CONSULTING LLC
DATE:JUNE 16, 2020
1/4" = 1'-0"Jennifer BairdNEW HOME310 2nd Street SouthwestCarmel, IN 4603200210
P102
SECOND
FLOOR
PLUMBING
1/8" = 1'-0"RevisionsNo. Date Description08/28/20
Nick Mishler