Loading...
HomeMy WebLinkAboutP102 - SECOND FLOOR PLUMBINGDN DN Bedroom 3 Loft BathroomMaster ClosetMaster Bathroom Master Bedroom 1-1/2" SAN DOWN 2" SAN DOWN 3" SAN DOWN 1-1/2" SAN DOWN 3" SAN DOWN 2" SAN DOWN 2" VENT UP VENTING ADJACENT TOILET, SINK, AND TUB SHOWER 3" VENT UP THRU ROOF 2" VENT UP VENTING ADJACENT SINKS 2" VENT UP VENTING ADJACENT SHOWER 2" VENT UP VENTING ADJACENT TOILET 2" RADON VENT UP THRU ROOF C2017 CALIBRATED CONSULTING 654 Hickory Dr Tipton, IN 46072 T 765-432-8150 General Contractor: PROJECT #: DRAWN BY: CLIFF 24x36 SHEET: 11x17 SHEET: SCALE BRYAN RAGAN CONS. 3056 S. 100 E. TIPTON, IN 46072 T 765-292-2502 F 765-292-2502 CALIBRATED CONSULTING LLC DATE:JUNE 16, 2020 1/4" = 1'-0"Jennifer BairdNEW HOME310 2nd Street SouthwestCarmel, IN 4603200210 P102 SECOND FLOOR PLUMBING 1/8" = 1'-0"RevisionsNo. Date Description08/28/20 Nick Mishler