HomeMy WebLinkAboutSOUTHILL C TRUSS LAYOUT 18-52224-1/2" Cant.
2x4 Ledger
(6) HUS2624" o/c Spacing2x4 Nailer2x4 Nailer(5) HUS26
2x4 Nailer
24" o/c Spacing
Add scabs to 2x6 legs in field per engineering
24" o/c Spacing
24" o/c Spacing
24" o/c Spacing
(9) HUS26 Add overhangs in field here
2x4 Nailer
(1) HUS26
BGC1CGATGAGC1FG
F
FGR
GG
HG
HGR
LGL1EG KGKGRMG
M1
V12
V1
V2
V3
V4
V5
V6
V7
V8
V9
V10
V11
V13
V14
V15
V16PBB
PBC
B ( 6 )A ( 10 )
CT1 ( 3 ) C ( 3 )G ( 4 )L ( 4 )
CT(2)E1(5)E(5)K(5)PBA(10)M(4)36-00-004-00-0011-00-008-00-0013-04-00 18-00-00
12-07-00
20-03-0812-00-00 10-04-04
54-00-00
12-08-00 8-09-00
22-08-00
8-00-00
8-04-001-08-00
10-00-00
12-00-00 8-00
1-04-00
18-00-00
54-00-0016-00-0012-00-00
2-00-0020-08-0027-04-0012-00-00
18-00-00 5-01-08
12-00-00SHOP DRAWING APPROVAL
THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR OTHER TRUSS LAYOUTS.
REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST
CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU.
REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.These trusses are designed as individual building components to be incorporated
into the building design at the specification of the building designer. See individual design sheets for each truss design identified on the
placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the
overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the
building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate Institute,
583 D'Onifrio Drive; Madison, WI 53179.
Floor Area: 0
Roof Area: 4204.31
Hip Lines: 10.76
Horizontal OH: 155.74
Rake OH: 273.61
Valley Lines: 134.65
Ridge Lines: 154.39
2702 North Tibbs Avenue
Indianapolis, Indiana 46222
Sales Rep:
SOUTHILL C T 3-CAR/COV.PRCH S
Subdivision:
Order #:
Job Name:
2/26/2019
Designer:
Eric Hooker
Date:
Model:
Client:
Lot #:
Mike Cook
SOUTHILL C 8960-C2
LENNAR
SOUTHILL
C T