Loading...
HomeMy WebLinkAboutTRICO_Sewer_Permit200706113128Project WO Project Name Project Developer Lift Station Treatment Plant Parcel Acreage EDU in Gallons rinai auomvision 1908 E SectYon Number North Augusta 98th Street Lot Number TriCo Address Number 10 Michigan Road Station Address 2 CTRWD 1NV1ffP Street Local Sewer Charge • District Contribution Plan Review and Inspection Application Fee EDU Fee Interceptor Fee OtherFees Fees Due Invoice Number 45 City 310 Zip Code County 0.00 Builder 0.00 150.00 Phone Number 1908.00 Owne� 1833.75 phone Number 0.00 3891.75 �ccupant Phone Number North Augusta 55 3717 W 98th St Carmel 46032 Hamilton PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are eutended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arrenged by contacting TriCo's office at 844-9200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. fhe building has: Grease Trep Grease Interceptor Grit Interceptor Grinder Station YES Water Service Main ID: Slab Foundation Crawl Space Basement Manhole IDs USMH YES � Lid Elevation � First Floor Elevation Carmel Utilities � Basement Elevation NA-ZONE7 DSMH 0.00 0.00 Calcufation !s based on both Manho/e Lid E/evations and the e(evation o/the First Floor 0.00' 0.00 Ft. Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Low Pressure System � TriCo currently requires that an I&I inspection is performed and a Certifcate of Compliance is issued prior to occupancy / sale of a properrty. Please review attached I/I Permit. � Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. 1�' — The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure. The terms of the conditional permit, if any, are listed below. Pians have been submitted. All fees have been paid. No certificate of insurance required. No additional permits required. No manhole core permit required. _ The facility is not classified as a FOG faciliN. (Notes)