HomeMy WebLinkAboutRohrer Road ImprovementsMONON CROSSING TOWNHOME DEVELOPMENT 3.31.20 Rohrer Road Collector Street Improvements Required Rohrer Road Width Length SY Tons Price Total 1.5" Mill for Overlay 11 472 576.9 $5.00 $2,884.44 1.5" HMA Surface 11 472 576.9 47.59 $114.10 $5,430.40 2.5" HMA Intermediate 12 472 629.3 86.53 $88.45 $7,653.87 3.5" HMA Base 121 472 629.3 121.15 $80.80 $9,788.65 2.5" HMA Intermediate 12 472 629.3 86.53 $112.80 $9,760.96 3" HMA Base 12 472 629.3 103.84 $115.00 $11,941.60 Subgrade Treatment 12 472 629.3 $3.60 $2,265.60 $49,725.53 Asphalt Path Improvements Required 1.5" HMA Surface 101 4421 491.11 40.52 1 $102.90 $4,169.17 2.5" HMA Intermediate 101 4421 491.1 67.53 $81.65 $5,513.64 6" - #53 Comp. Agg. 101 4421 1 188.30 $26.39 $4,969.24 $14,652.05 Additional Improvements Required 2' Conc. Chairback Curb 442 $13.45 $5,944.90 Sodding 6 442 294.7 $4.75 $1,399.67 6" Subsurface Drain - Curb 442 $10.55 $4,663.10 Pavement Striping 1 $3,000.00 $3,000.00 TOTAL Monon Crossing ROW Improvements Required $79,385.24 Rohrer Road Improvements Provided SY 1.5" HMA Surface 375.0 30.94 $114.10 $3,529.97 2.5" HMA Intermediate 375.0 51.56 $88.45 $4,560.70 3.5" HMA Base 375.0 72.19 $80.80 $5,832.75 2.5" HMA Intermediate 375.0 51.56 $112.80 $5,816.25 3" HMA Basel 1 1 375.01 61.88 1 $115.00 $7,115.63 Subgrade Treatmenti 1 375.01 1 $3.60 $1,350.00 $28,205.30 Asphalt Path Provided 1.5" HMA Surface 10 442 491.1 40.52 $102.90 $4,169.17 2.5" HMA Intermediate 10 442 491.1 67.53 $81.65 $5,513.64 6" - #53 Comp. Agg. 10 442 188.30 $26.39 $4,969.24 $14,652.05 Additional Provided Pavement Striping 1I 1 1 1$3,000.001 $3,000.00 TOTAL Monon Crossing ROW Improvements Provided 1 $45,857.34 GRAND TOTAL Monon Crossing Payment in Lieu of Improvement $33,527.90 This Engineer's Estimate is an opinion of probable construction cost made on the basis of Engineer's experience and represent Engineer's judgement as a qualified professional generally familiar with the industry. However, since Engineer has no control over the cost of materials, equipement, labor or market conditions, Engineer cannot guarantee that actual construction cost will not vary from this Engineer's Estimate. A/,i.ey Kristopher K. Eichhorn, PE PS 3/31 /2020 HWC Engineering TE,Q!�y�i=% No. ' w EZ= 11400758 STATE OF ;