HomeMy WebLinkAboutGN010.1EXISTING 2X4 FRAMING
DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
40422768
266852682468
386826682668
2254
UP
FLOOR FLOORCD
CW
R4
R4
R4
R4
3
3
3
3
E1E1E2E2
E3E3 E4E4 5'-4"3'-10"1'-8 1/2" 1'-8 1/2"10'-1 1/4"
TILE
EXISTING
TILE
NO WORK
THIS ROOM
EXISTING
TILE
GARAGE
KITCHEN
MUDROOM
TILE
LAUNDRY ROOM
PROPOSED PLAN NOTES
1 FRAME WALL NICHE FOR RECESSED FOLD DOWN DRYING RACK
1 REFRAME BULKHEAD PER NEW CABINET ELEVATIONS
2 FRAME NEW 2X4 WALL AND DOORWAY
1 FRAME NEW 2X4 IN FILL WALLS
3 PROVIDE BLOCKING AS NECESSARY FOR CABINET INSTALLATION
1 RE-INSULATE EXTERIOR WALL AS NECESSARY FOR MECHANICAL
RELOCATIONS
1
DRYWALL- PATCH AND RE-TEXTURE CEILING IN LAUNDRY ROOM (MATCH
EXISTING TEXTURE). PATCH AND INSTALL DRYWALL ON WALLS TO LEVEL
4 SMOOTH FINISH AS NECESSARY. INSTALL DRYWALL ON NEW
BULKHEAD OVER WASHER AND DRYER.
1
DRYWALL- PATCH AND RE-TEXTURE CEILING IN MUD ROOM (MATCH
EXISTING TEXTURE). PATCH AND INSTALL DRYWALL ON WALLS TO LEVEL
4 SMOOTH FINISH AS NECESSARY.
1
DRYWALL- PATCH AND RE-TEXTURE CEILING IN HALLWAY (MATCH
EXISTING TEXTURE). PATCH AND INSTALL DRYWALL ON WALLS TO LEVEL
4 SMOOTH FINISH AS NECESSARY.
1 TILE- PREP AND INSTALL NEW TILE FLOOR IN LAUNDRY ROOM
1 TILE- PREP AND INSTALL NEW TILE FLOOR IN MUDROOM
1 TILE- CUT EXISTING HALLWAY FLOOR TILE AT DOORWAY.
2 CABINETRY & COUNTERTOP - INSTALL NEW CABINETS AND COUNTERTOP
AS SHOWN ON ELEVATIONS
2 CABINETRY - INSTALL NEW CABINETS AS SHOWN ON ELEVATIONS
F1F1
F2F2
F3F3
F4F4
F5F5
I6I6
D7D7
D8D8
D9D9
TILE10TILE10
TILE11TILE11
TILE12TILE12
C13C13
C14C14
F1F1
F2F2
F3F3
F4F4
F5F5
I6I6
D7D7
D8D8
D9D9
TILE10TILE10
TILE11TILE11
TILE12TILE12
C13C13
C14C14
F1F1
F2F2
F3F3
F3F3
F4F4
I6I6
F5F5
F5F5
F5F5
D7D7
D8D8
HALLWAY
D9D9
TILE10TILE10
TILE11TILE11
TILE12TILE12
C13C13
C13C13
C14C14 C14C14 Boris ResidenceLaundry Remodel2972 Palace CtCarmel, IN 46032Date:Revision:
2
SHEET OF 16
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concepts and ideas,
forming a part of the plans, and the selection and arrangement
thereof Copright 2018 by Custom Living, Inc., Indianapolis IN.
ALL RIGHTS RESERVED. The plans shall remain the property
of Custom Living Inc. Any use of the plans, or their content,
without the prior written permission of Custom Living. Inc is
strictly prohibited.
PROPOSED FLOOR PLAN- 1st FLOOR CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/25/20
DATE:DESIGNER: MARLA JOHNSONE: marla@customlivingusa.comC: 317.603.5551GENERAL PROPOSED PLAN NOTES
Framing contractors are responsible for all labor, for
the scope of work specifed on the drawings provided
by Custom Living.
Owner understands that Custom Living has only
provided a labor and material allowance for the scope
of Rough Carpentry work specified on the drawings.
Any additional work added or uncovered during this
scope will be a Change Order during construction
Owner understands that the Drywall Allowance is
based on an estimated board count and square
footage take-off. A final walk through with drywall
contractor after framing and mechanical rough-ins will
be necessary to finalize drywall install and finish
budgets.
Final drywall touchups will follow countertop
installation.
** PRINTS TO SCALE IF PRINTED ON 24" X 36" **
SCALE: 3/4" = 1'
09/01/20