Loading...
HomeMy WebLinkAboutGN010.1EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING 40422768 266852682468 386826682668 2254 UP FLOOR FLOORCD CW R4 R4 R4 R4 3 3 3 3 E1E1E2E2 E3E3 E4E4 5'-4"3'-10"1'-8 1/2" 1'-8 1/2"10'-1 1/4" TILE EXISTING TILE NO WORK THIS ROOM EXISTING TILE GARAGE KITCHEN MUDROOM TILE LAUNDRY ROOM PROPOSED PLAN NOTES 1 FRAME WALL NICHE FOR RECESSED FOLD DOWN DRYING RACK 1 REFRAME BULKHEAD PER NEW CABINET ELEVATIONS 2 FRAME NEW 2X4 WALL AND DOORWAY 1 FRAME NEW 2X4 IN FILL WALLS 3 PROVIDE BLOCKING AS NECESSARY FOR CABINET INSTALLATION 1 RE-INSULATE EXTERIOR WALL AS NECESSARY FOR MECHANICAL RELOCATIONS 1 DRYWALL- PATCH AND RE-TEXTURE CEILING IN LAUNDRY ROOM (MATCH EXISTING TEXTURE). PATCH AND INSTALL DRYWALL ON WALLS TO LEVEL 4 SMOOTH FINISH AS NECESSARY. INSTALL DRYWALL ON NEW BULKHEAD OVER WASHER AND DRYER. 1 DRYWALL- PATCH AND RE-TEXTURE CEILING IN MUD ROOM (MATCH EXISTING TEXTURE). PATCH AND INSTALL DRYWALL ON WALLS TO LEVEL 4 SMOOTH FINISH AS NECESSARY. 1 DRYWALL- PATCH AND RE-TEXTURE CEILING IN HALLWAY (MATCH EXISTING TEXTURE). PATCH AND INSTALL DRYWALL ON WALLS TO LEVEL 4 SMOOTH FINISH AS NECESSARY. 1 TILE- PREP AND INSTALL NEW TILE FLOOR IN LAUNDRY ROOM 1 TILE- PREP AND INSTALL NEW TILE FLOOR IN MUDROOM 1 TILE- CUT EXISTING HALLWAY FLOOR TILE AT DOORWAY. 2 CABINETRY & COUNTERTOP - INSTALL NEW CABINETS AND COUNTERTOP AS SHOWN ON ELEVATIONS 2 CABINETRY - INSTALL NEW CABINETS AS SHOWN ON ELEVATIONS F1F1 F2F2 F3F3 F4F4 F5F5 I6I6 D7D7 D8D8 D9D9 TILE10TILE10 TILE11TILE11 TILE12TILE12 C13C13 C14C14 F1F1 F2F2 F3F3 F4F4 F5F5 I6I6 D7D7 D8D8 D9D9 TILE10TILE10 TILE11TILE11 TILE12TILE12 C13C13 C14C14 F1F1 F2F2 F3F3 F3F3 F4F4 I6I6 F5F5 F5F5 F5F5 D7D7 D8D8 HALLWAY D9D9 TILE10TILE10 TILE11TILE11 TILE12TILE12 C13C13 C13C13 C14C14 C14C14 Boris ResidenceLaundry Remodel2972 Palace CtCarmel, IN 46032Date:Revision: 2 SHEET OF 16 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts and ideas, forming a part of the plans, and the selection and arrangement thereof Copright 2018 by Custom Living, Inc., Indianapolis IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans, or their content, without the prior written permission of Custom Living. Inc is strictly prohibited. PROPOSED FLOOR PLAN- 1st FLOOR CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462208/25/20 DATE:DESIGNER: MARLA JOHNSONE: marla@customlivingusa.comC: 317.603.5551GENERAL PROPOSED PLAN NOTES Framing contractors are responsible for all labor, for the scope of work specifed on the drawings provided by Custom Living. Owner understands that Custom Living has only provided a labor and material allowance for the scope of Rough Carpentry work specified on the drawings. Any additional work added or uncovered during this scope will be a Change Order during construction Owner understands that the Drywall Allowance is based on an estimated board count and square footage take-off. A final walk through with drywall contractor after framing and mechanical rough-ins will be necessary to finalize drywall install and finish budgets. Final drywall touchups will follow countertop installation. ** PRINTS TO SCALE IF PRINTED ON 24" X 36" ** SCALE: 3/4" = 1' 09/01/20