Loading...
HomeMy WebLinkAboutAkbar ROW permitCITY OF CARMEL RIGHT OF WAY PERMIT PERMIT #: RW-2024-00790 PROJECT NAME: Akbar Residence PROJECT LOCATION: 14298 OVERBROOK DR, CARMEL, 46074 PROJECT DESCRIPTION: New home Applicant: Steven Moed PO Box 4102 Carmel, IN 46082 simhomes@yahoo.com Project Contact: Steven Moed PO Box 4102 Carmel, IN 46082 3172815224 simhomes@yahoo.com 8/18/2020 The City of Carmel has approved a Right af Way permit for the project and applicant shown above. Any changes to the scope of work after permit issuance impacting city rights-of-way or dedicated easements may require additional approvals and must be coordinated with the Engineering Department prior to performing the work. This indudes, but is not limited to, pavement cuts , lane/street closures, path/sidewalk ciosures, easement encroachments, and new utility poles or aeriai service lines. CONDITIONS OF RIGHT-OF-WAY PERMIT 2. 3. 4. 5. 6. 7. 8. 9. The applicant/contractor is required to post and maintain a valid License and Permit bond with the City of Carmel for the duration of the project. indiana's "Call Before You Dig" law (IC 8-1-26) requires everyone that digs to contact Indiana 811 at least two (2} full working days before starting their project in order to have existing underground facilities properly identified and located. The City Engineer's office {317-571-2441) is to be notified before the start of a Right of Way pavement repair so that a City Inspector can observe the placement of patch materials. A minimum of two (2) hours of notice is required. Failure to notify may result in removing and repiacing the repair. Asphait pavements that are required to be removed shali be saw cut, and then carefuliy removed to minimize pavement damage. The cut must be repaired with flowable fill with 12" of concrete and 1 1!2" of surface asphalt. All seams shal! be tack coated and shall be ironed as necessary to provide a perfect joining of the patch with the surrounding pavement . No cold mix asphalt is to be used except as temporary patches. Concreie pavement shall be saw cut and then carefully removed to minimize pavement damage. The new concrete patch shall be placed using at least 4000psi concrete for driveway aprons and sidewalks, and Class A concrete for road cuts. The edges of the adjoining pavement shall be coated with an epoxy adhesive intended for concrete patching. The patched area shall be properly barricaded for at teast seven (7) days and the patch shall be treated with two (2) coats of a curing compound or a curing membrane. All excavations in grassed areas shall be capped with a minimum of 6" af topsoil and seeded with high quality bluegrass seed equal to other existing grass. All excavations within 5' of the edge of pavement shall be filled with a granular fill material and topped with at least 6" of topsoil. All ditches disturbed by excavation shall be properly restored and sodded. Upon completion of all repairs, the Applicant shall request inspection from the City Engineer's office. Upon inspection if all repairs are satisfactary the Inspector shall release the permit. The City of Carmef will hold the Applicant directly responsible for all work performed under this permit . If the City Engineer andlor his Inspector determine that the workmanship is incomplete or unacceptable, the City reserves the right to withhold release of the permit for up to one year. Riqht of Wav Inspectar Contact Aaron Hoover Office:317-571-2677 Cel1:317-714-8908 ahoover@carmel. in. gov