Residenfia! SANITARY SEWER P6RMIT 999913717
Permit Type Final 5ubdivision Tallyn's Ridge
Pro}ect WO 1256485796 Section Number
Project Name Tallyn's Ridge Sec 1 Lot Number 5
Praject Developer Platinum Properties Address Number �43g7
Lift 5tation 23 126th Street Station Atidreas 2
Treatment Plant MIX Street Tallyn Way
Parcel Acreage Q.35 City Carrnel
EDU in Gallons 310 Zip Code A6�74
County Hamilton
Local Sewer Charge - District ContrihuUon Q00 guilder
Plan Review and Inspection 0.00 Fischer Homes
Application Fee 150.0o Phone Number 317-348-4'I35
EDU Fee 1984.00 pwner
fnterceptor Fee � �� phone Number
Other Fees 0.00
Fees Due 2134.OQ Occupant
[nvoice Number Phone Number
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All instalEations sha11 be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to lwelve inches above the pkpe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
fiability for drains which are helow the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will 6e
responsibie for damages to TriCo's sewer system, This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject o4 this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 644-920D 24 hours in
advance. All new construction wiil be placed on biliing two months after connection has been made or when water is
connected, whichever comes frst.
The building has; Main Ib: TAR606-iAR803
Grease 7rap 5[ab Foundation
Grease Interceptor Crawl 5pace Manhole IDs USMH ra.R-eo3 TAR-eos 65MH
Grit Interceptor Basement YES Lid Elev�tion 920.78 ✓ 920.5�
Grinder Station FirsE Floor Elevadon .%
925.53 � 92�-53 `� /
Water 5enrice Carmel lltilities Basement Elevatlon 915.40 915.40 �
Calculanan is based on 6oth Manhole Lid Efevatlons and fhe elevation o/ the First Floor 4.74 4.87 Ft.
Per Ordinante 9-�3-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump Only
TriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior tn occupancy 1
sale of a properrty. Please review attached I/i Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the DeveloperlOwner.
The proper dass of cleanout must be instal�ed every 10D feet of lateral pipe measured from sewer main to structure.
The terms of the conditional pertnit, if any, are Iisted below.
Plans have been submitted. ��p*+pt s�WER
All fees have been paid. o ���
No certificafe of insurance required. ��
No additfonal permits required.
No manhole core permit required. �
The facility is not classified as a FOG facility. ±, :
(Notes)
By signing below, I attesl lh I�9v1 he.pislnc e ificatlons and agree to accept responslbility for all work done under this permit.
Builder / Owner Signature Phone Number �'�� —���_
Printed Na
Approved By
RyanHa `DisMctEngrnaer 08�26�2020
Permit Ys valid for NE- EAR from che date issued. Permit valid only with TnCo seal in red ink.