Loading...
HomeMy WebLinkAboutALB29 First Floor System Start Spacing 19.2" O.C.Framing Connector Summary PlotIDQty Manuf Product Design Method Face Nails Top Nails Member Nails SkewBacker Blks Filler Web Stiff H1 1 Simpson HUC410 Designed 14- 10d - 6- 10d - 2 No Yes H2 1 Simpson HUC410 Designed 14- 10d - 6- 10d - No No No H3 1 Simpson ITS2.06/11.88 Designed 2- 10dx1.54- 10dx1.52- Strong-Grip - 2 No No H4 1 Simpson IUS2.06/11.88 Designed 10- 10d - 2- Strong-Grip - 2 No No H5 6 Simpson IUS2.06/11.88 Designed 10- 10d - 2- Strong-Grip - No No No H6 1 Simpson MIT2.1/11.88 Designed 4- 10d 4- 10d 2- 10dx1.5 - No No No H7 3 Simpson IUS3.56/11.88 Designed 12- 10dx1.5- 2- Strong-Grip - No No No H8 1 User IUS2.06/11.88 User Defined 12-10d 2-Strong-Grip - Not Required No Not Required Products PlotIDLength Product Plies Net Qty F40' 40' 0" 11 7/8" TJI 210 joist 1 5 F28'-2 28' 0" 11 7/8" TJI 210 joist 2 6 F22' 22' 0" 11 7/8" TJI 210 joist 1 6 F18' 18' 0" 11 7/8" TJI 210 joist 1 2 F14' 14' 0" 11 7/8" TJI 210 joist 1 9 F12' 12' 0" 11 7/8" TJI 210 joist 1 3 F4' 4' 0" 11 7/8" TJI 210 joist 1 1 FBk1 2' 0" 11 7/8" TJI 210 joist 1 24 R28' 28' 0" 11 7/8" TJI 360 joist 1 2 X48' 48' 0" 11 7/8" TJI 560 joist 1 1 X46' 46' 0" 11 7/8" TJI 560 joist 1 4 X40' 40' 0" 11 7/8" TJI 560 joist 1 1 X20' 20' 0" 11 7/8" TJI 560 joist 1 7 XBk1 2' 0" 11 7/8" TJI 560 joist 1 3 M1-2 12' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL (WSO)2 2 TS1-2 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS2-2 10' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS3 6' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1 RM1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 13 LEVEL NOTES Current Date: 8/18/2020 File Name: 2020-0890glb - drees indy - alb-29.jvl Level Name: 1st-Floor Framing Building Code - Design Methodology: IBC 2018 Members with Design Overridden: TJ-Pro Rating (Weighted Average): 50 Minimum Level TJ - Pro Rating & Joist: TJ-Pro rating = 41, joist = X20'(i20640) Maximum Level TJ - Pro Rating & Joist: TJ-Pro rating = 60, joist = F14'(i20546) FLOOR Floor Container: FC6 Use/Occupancy: ResidentialLivingAreas Floor Area Loading is: 40.0 lb/ft² Live Load & 10.0 lb/ft² Dead Load Operator Added Additional Loads Maximum Allowed Deflection: L/480 Live Load & L/240 Total Load TJ-Pro Rating Information: Weighted Average: 50 Directly Applied Ceiling: None Decking Attachment: Glue and Nail Decking Material: 23/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF Perpendicular Partition: No Strapping at max 8' o.c.: None Blocking at max 8' o.c.: No Poured Flooring: No B1 B1 B1 B1 B1 B1 A3 A3 A3 A3 A3 A3 A3 A3 H2 B1 B1 B1 CS CS CS CS B1 B1 B1 PL: 17.7K B1 B1 B1 A3 A3 CS BBO5 11' 8"BBO10BBO9BBO9M1-2TS1-2 TS2-2 1' 4" 20' 3" X46' X48' X40' X20' F12' RM1 RM1 RM1 RM1 RM1 RM1 RM1RM1 RM1RM1RM1RM1RM1RM1FBk1FBk1FBk1 F4' RM1 RM1RM1 FBk1FBk1 7' 11 1/2"11' 0 1/2"4' 0 1/2" F28'-2 FBk1F28'-2 FBk1F28'-2 FBk1 XBk1 FBk1 FBk1 FBk1 X20' X20' 11' 11 1/2"13' 8" 13' 7 1/2" 3' 0"12' 8 1/2"6' 0"8' 2"1' 0"4' 3"1' 0"22' 10"6' 11 1/2"2' 0"13' 7" X20'XBk1 Toilet FBk1FBk1ShowerFBk1 FBk1 9"1' 7 3/16"1' 7 3/16"10 3/16"Toilet H5 H5 H3 H5 H4 H5 H2 H6H8 12' 11"TS3 RM1RM1 H7 H7 H7 16' 0"11' 4 1/2"33' 3 1/2"39' 3"18' 0" H1 7" Holes H5 H5 R28'X46'X20'F18' F12'F22' F14'F14'F14'F40' Mechanical Chase Kitchen Island Hatch Legend TJI 210 TJI 360 TJI 560 Joists by Series Architectural Drawings Prepared By: Structural Drawings Prepared By:Drees Homes- IndianapolisLayton Elevation B : ALB-29Drees HomesALB-29RevaBy DateGL 8/18/20CommentsAdded HVAC HolesDrawn By:GLChecked By: Release Date:8/18/2020Job # 2020-0890GLa Sheet 1 of 2 A complete Javelin ® framing plan requires the Trus Joist Installation Guide See the Trus Joist Installation Guide for Product Trademark Information SYMBOL LEGEND Bearing Length Requirements Point Load (Operator Added) Line Load (Operator Added) Area Load (Operator Added) Beam by Others Detail Callout Label (See Framer's Pocket Guide) Non-Load Bearing Wall Joist Under Wall Above BBO A10'UWALack of proper bracing during construction can result in serious accidents. Observe the following guidelines: WARNING NOTES: WARNING Joists are unstable until braced laterally Bracing Includes: Blocking Hangers Sheathing Rim Board Strut Lines Rim Joist DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. DO NOT walk on joists that are lying flat. DO NOT walk on joists until braced. INJURY MAY RESULT. Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks of Weyerhaeuser NR. ©2014 Weyerhaeuser NR Company. All rights reserved. 1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI ® joists must be completely installed and properly nailed. 2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay. 3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist. Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker or one layer of unnailed sheathing. 5. Ends of cantilevers require safety bracing on both the top and bottom flanges. 6. The flanges must remain straight within 1/2" from true alignment. 4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system. First Floor System Scale: 1/4" = 1'0"These placement plans have been developed for the specificationof products based on project information provided. This service is solelyintended for product application assurance; and, is not intended tocircumvent the need for a design professional as determined by thebuilding code. The designer of record and/or builder/framer is responsibleto assure these drawings are compatible with the overall project.09/10/20