HomeMy WebLinkAboutA-104A - GENERAL NOTES FOR NEW WORK & NEW WORK PLAN NOTESGENERAL NOTES FOR NEW WORK 1. ALL WORK SHALL BE DONE IN WORKMAN LIKE MANNER AND IN CONFORMANCE WITH MANUFACTURER'S INSTALLATION AND WARRANTY REQUIREMENTS. 2. ALL WORK TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL AUTHORITIES, RULES, REGULATIONS & CODES. 3. ALL DIMENSIONS AND FIELD CONDITIONS SHALL BE VERIFIED. ANY DISCREPANCIES IN DIMENSIONS, CONDITIONS; OR DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE ARCHITECT'S ATTENTION. 4. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ALL EXISTING MATERIALS, SURFACES, & EQUIPMENT TO REMAIN. 5. CONTRACTOR SHALL BE LIABLE FOR, AND TAKE ALL PRECAUTIONS NECESSARY TO PROTECT ALL EQUIPMENT AND BUILDING FROM DUST, VIBRATIONS AND WATER DAMAGE. 6. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECTAND OWNER PRIOR TO PROCEEDING WITH WORK. 7. REMOVE ALL DEBRIS PROPERLY FROM SITE. ALL DEMOLISHED MATERIAL, EXCEPT THAT LISTED OR MARKED BY ARCHITECT FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR. LOAD DEMOLISHED MATERIAL DIRECTLY ON TRUCKS OR INTO DUMPSTER, DISPOSE OF DEBRIS LEGALLY. DO NOT BURN ON SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS OR ROOF DRAINS. DO NOT LET PILED DEBRIS ENDANGER STRUCTURE, BLOCK EXITS, OR ROADWAYS. UPON DISCOVERY OF ANY HAZARDOUS MATERIALS, NOTIFY THE OWNER OF TYPE, LOCATION, AND EXTENT OF SAME. S. ALL ELECTRIC AND MECHANICAL WORK SHALL BE PROVIDED BY PERSONNEL LICENSED IN THE STATE OF INDIANA IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL CODES. 9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, REQUIRED BY ALL AGENCIES AND AUTHORITIES HAVING JURISDICTION FOR THE WORK INCLUDED IN THIS CONTRACT. PERMIT SHALL BE CONSPICUOUSLY POSTED AT JOB SITE. 10. THE CONTRACTOR IS SPECIFICALLY RESPONSIBLE FOR ALL MEANS AND METHODS OF JOB SITE SAFETY. 11. CONTRACTOR SHALL ENSURE THAT NUMBER NOTES ARE READ IN CONJUNCTION WITH A NUMBER NOTE EXPLANATION, I.E., EACH SHEET SHOULD NOT BE READ IN ISOLATION BY THE CONTRACTOR'S WORKMEN OR HIS SUBCONTRACTORS. 12. ANY CONFLICTS IN THE DRAWINGS OR SPECIFICATIONS, OR BETWEEN DRAWINGS AND SPECIFICATIONS, SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION OF CONFLICTS IS RECEIVED FROM THE ARCHITECT. 13. ALL EXISTING RATED WALLS, FLOORS, CEILINGS, OR SHAFTS MUST BE MAINTAINED THROUGHOUT NEW CONSTRUCTION, AND ANY PENETRATIONS OR INTERRUPTIONS MADE TO THESE RATED SYSTEMS MUST BE REPAIRED TO MAINTAIN RATING. 14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL TRADES, FOR COORDINATION OF ALL TESTING AND INSPECTIONS NECESSARY, AND FOR DELIVERY & STORAGE OF ALL MATERIALS NECESSARY TO COMPLETE THE PROJECT. 15. THE CONTRACTOR SHALL CLEAN SITE AFTER CONSTRUCTION IN A MANNER CONSISTENT WITH THE CONDITIONS THAT EXISTED PRIOR TO CONSTRUCTION. 16. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE CONDITIONS OF EXISTING MATERIALS THAT ARE TO BE REMOVED OR DEMOLISHED. NEW WORK PLAN NOTES 6: FABRICATIONS 6.03 ATRIUM PUBLIC BATHROOMS: FABRICATE & WSTALL NEW BATHROOM VANITY COUNTER. COMPONENTS SHALL INCLUDE THE FOLLOWING: 3/4" SQUARE EDGED STONE COUNTER AND STONE TURN-DOWN FACE AND BACKSPLASH ON THREE SIDES, AND WOOD VENEER APRON / PIPE COVER. PROVIDE STEEL ANGLE FRAME AT LEADING EDGE FOR COUNTER SUPPORT. ANCHOR VANITY STRUCTURE DIRECTLY TO WALL STRUCTURE. SEE MILLWORK DRAWINGS FOR DETAILS SIZES & DIMENSIONS. PROVIDE IN-WALL SOLID BLOCKING AT ALL ANCHOR POINTS. INSTALL ALL SPECIFIED PLUMBING FIXTURES AND COORDINATE AND INSTALL ALL REQUIRED PLUMBING CONNECTIONS, VAWES, P-TRAP, STACK VENT CONNECTIONS, ETC.. CAULK ALL JOINTS BETWEEN COUNTER & BACKSPLASHES,AND BETWEEN BACKSPLASHES AND WALL. 7: THERMAL & MOISTURE PROTECTION 7.01 TYPICAL AT ALL WALL COVERING INSTALLATIONS: PROVIDE & INSTALL CONTINUOUS JOINT SEALANT AT THE INTERSECTION OF NEW VINYL WALLCOVERING AND ALL OTHER MATERIALS / SURFACES, INCLUDING BUT NOT LIMITED TO: CEILINGS, BULKHEADS, DOOR FRAMES, ELEVATOR FRAMES, FIRE EXTINGUISHER CABIN ETS, SURFACE MOUNTED & RECESSED HEATING UNITS, MASONRY WALLS, THERMO-PLASTIC WALL COVERING. TYPICAL: USE ONE-PART NON-SAG ACRYLIC LATEX TYPE SEALANT COMPLYING WITH ASTM C834, COLOR TO MATCH WALL SURFACE, BY "TREMCO / 216-292-5000" OR EQUAL. AT TOP OF VENDING ROOM TILE BASE I WALLCOVERING USE MILDEW RESISTANT, ONE PART, SILICONE SEALANT'786 - DOW CORNING CORP / 517-496-4000" OR EQUAL. FOLLOW ALL MANUFACTURERS RECOMMENDATIONS. 7.02 TYPICAL AT ALL PLUMBING FIXTURES 8 EDGES OF VANITY TOPS INCLUDING BUT NOT LIMITED TO TOILETS, SINKS, URINALS, FLOOR DRAINS & FAUCET SETS: PROVIDE & INSTALL CONTINUOUS SANITARY SEALANT AT THE INTERSECTION OF FIXTURE & FLOOR TILE, FIXTURE AND STONE COUNTERS, FIXTURE & WALL TILE, & ALL OTHER INTERSECTIONS. USE MILDEW RESISTANT, ONE PART, SILICONE RUBBER, IN CLEAR. USE ONE OF THE FOLLOWING: "786" BY DOW CORNING CORP., 500-662-0661, "1700" BY GENERAL ELECTRIC CO., 800-225-8886, OR "898" BY PECORA CORP., 800-923-6688. S: DOORS 8 HARDWARE & WINDOWS & GLASS 8.08 (LOBBY BATHROOMS) CONTRACTOR SHALL PROVIDE 8 INSTALL NEW PAINT GRADE VENEER FRAME SWING DOORS WITH INSET PANEL ON BOTH SIDES AND INSET 1/8" ACRYLIC MIRROR ON THE OUTSIDE BY "TOTAL PLASTICS" (SLATE) AND NEW 2" H.M. FRAME TO COORDINATE WITH NEW DOORS AND HARDWARE INCLUDING PRIVACY LEVER LOCK SET. DOORS SHALL BE PREPPED FOR HARDWARE AND STAINED & SEALED, H.M. FRAME SHALL RECEIVE THREE COAT PAINTED FINISH. 9: FINISHES & WALL FRAMING 9.01 PROVIDE & INSTALL NEW GYP. BRD. FINISH WALLS TO THE EXTENT INDICATED ON DRAWINGS (TYPICALLY "SHADED" UNLESS OTHERWISE NOTED). SEE WALL SCHEDULE FOR FRAMING TYPE, SIZE & GAGE. FRAMING SHALL INCLUDE TOP AND BOTTOM TRACKS WHICH SHALL BE BOLTED TO STRUCTURE @ CEILING & FLOOR. PROVIDE AND INSTALL CONTINUOUS DOUBLE STUDS AT DOOR JAMBS. REMOVE AREA OF CARPETING BELOW NEW FLOOR TRACK PRIOR TO INSTALLATION OF FLOOR TRACK. TAPE AND SPACKLE WALL cnnnnrH FnR aFrFivr nF NEW VINYL WALL COVERING. RELEASEO FOR CONSTRUCTION . CORNER BEADS AT ALL EXTERIOR 'E ALL JOINTS BETWEEN GYP. BRD. Suhjec��ocompliancewithallregula�ions GYP. BRD.SURFACESTPPROVIDE o4S�a�eantlLocalCodes FREESUBSTRATE(SEEFINISHINDEX Cityof Carmel ,REAS TO MCLUDE ALL GYP. BRD. `�yc,��,'.�", �,�:;val�l„1��_ DATE: 06�30�20 WALLS, CEILINGS AND BULKHEADS. COMPLY WITH ASTM C587. USE "DIAMOND FINISH PLASTER" BY US GYPSUM CO. (312321-4000) OR EQUAL. 9.07 CONTRACTOR TO INSTALL ALL NEW OWNER PROVIDED CARPETING AND CARPET PAD (AS DESIGNED / SELECTED BY CAUHAUS INC., PER SEAMING DIAGRAMS BY MANUFACTURER). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR INSTALLATION OF CARPETING /PADDING SYSTEMS. AT CARPET INSTALLATIONS OVER AREAS OF SEVERELY DAMAGED OR UN-EVEN FLOORING CONTRACTOR SHALL PROVIDE AND WSTALL SKIM COAT OF "LATICRETE 816 - RAPID UNDERLAYMENT" OVER 100°/ OF DAMAGED OR UN-EVEN FLOOR SURFACE. INSTALL UNDERLAYMENT PER ALL REQUIRED SPECIFICATIONS OF "LATICRETE SYSTEMS". NEW CARPETING SHALL BE CONTINUOUS UNDER OVERHANGS & OPEN COUNTERS & CASEWORK. CARPETING SHALL NOT RUN UNDERNEATH BUILT-IN BANQUETTE SEATING. 9.08 PROVIDE AND INSTALL NEW PORCELAIN FLOOR TILE, SEE DRAWINGS FOR LAY-OUT, SIZES AND EXTENT. RUN FLOORING TILES UNDERNEATH OVERHANGS, OPEN COUNTERS, CASEWORK & BANQUETTES. PROVIDE & APPLY "MAPEI -MAPELASTIC 315 CRACK ISOLATION MEMBRANE ON SUBSTRATES UNDERNEATH ALL NEW TILE WORK. SET TILES TO SUBSTRATE WITH "MAPEI - THWSETMORTAR. GROUTJOINTSFULLWITH "STARQUARTZ- QUARTZ LOCK" GROUT, NON-STAINING, ANTI-BACTERIAL GROUT (OR EQ.). MAXIMUM JOINT SIZE TO BE 3/i6". CLEAN ALL HAZE AND GROUT FROM TILE SURFACE WITH APPROVED CLEANER. SEE FINISH SCHEDULE FOR TILE TYPE, COLOR AND FINISH. CONTRACTOR SHALL SUBMIT GROUT COLOR SAMPLES FOR SELECTION /APPROVAL PRIOR TO INSTALLATION. MAINTAIN 8, RE-INSTALL EXISTING FLOOR JUNCTION BOXES, COVERS. COORDINATE INSTALLATION WITH ADJACENT FLOORING TO PROVIDE CONTINUOUS, FLUSH FLOOR SURFACE. SEE FINISH SCHEDULE FOR SPECIFIC MATERIAL SELECTIONS. 9.09 CONTRACTOR SHALL PROVIDE AND INSTALL NEW WALL TILE. THINSET TILES TO SUBSTRATE, GROUT AND COMPACT ALL JOINTS FULL WITH SANDED EPDXY GROUT. MAXIMUN JOINT SIZE TO BE 1/8". SUBMIT GROUT COLOR SAMPLES FOR APPROVAL BY DESIGNER (MAPEI OR EQ.). CLEAN ALL HAZE AND GROUT FROM TILE SURFACE WITH APPROVED CLEANER. 9.10 CONTRACTOR SHALL INSTALL NEW OWNER PROVIDED "OVERLAY" CARPETING AND CARPET PAD (AS DESIGNED BY CAUHAUS INC., PER SEAMING DIAGRAMS BY MANUFACTURER. CONTRACTORIINSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR INSTALLATION OF CARPETING / PADDING SYSTEMS. 9.11 CONTRACTOR SHALL SUPPLY AND INSTALL NEW WOOD WALL BASE TO MATCH EXISTWG WOOD WALL BASE IN HEIGHT, THICKESS, AND PROFILE , WHERE INDICATED ON I.D. DRAWINGS. CONTRACTOR SHALL REMOVE SMALL ADJACENT WALL BASE PIECES, WHERE NECESSARY, TO PROVIDE SEAMLESS, CONTINUOUS WALL BASE PIECES. INSTALLATION TO BE WITH RECESSED FINISH NAILS. 9.12 CONTRACTOR SHALL PROVIDE AND INSTALL NEW FACTORY FINISHED PORCELAIN TILE WALL BASE, THINSET TILES TO SUBSTRATE, GROUT AND COMPACT ALL JOINTS FULL. SET TILES TO SUBSTRATE WITH "MAPEI - THINSET MORTAR. GROUT JOINTS FULL WITH "STAR QUARTZ - QUARTZ LOCK" GROUT, NON STAINING ANTI BACTERIAL GROUT (OR EQ.). MAXIMUM JOINT SIZE TO BE 3/16". OFFSET BASE TILE JOINT LINES TO MIDPOINTS OF FLOOR TILES AS POSSIBLE. 9.14 CONTRACTOR SHALL PROVIDE AND INSTALL ALL TYPICAL & ACCENT VINYL WALLCOVERING ON ALL EXISTING & NEW GYP. BRD. WALLS (UNLESS OTHER FINISH IS SPECIRED). PREP 100% OF WALL SUBSTRATES TO PROVIDE SMOOTH, CONTINUOUS, ADHESIVE AND DIRT FREE SURFACE TO RECEIVE NEW WALL COVERING. CONTRACTOR/INSTALLER SHALL ASSURE THAT THERE ARE NO VERTICAL SEAMS WITHIN 6" OF ANY CORNERS AND NO HORIZONTAL SEAMING. SEE FINISH SCHEDULE FOR WALL COVER TYPES, LOCATIONS, WIDTHS, REPEATS AND ROLL SIZES. CONTRACTOR/INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR INSTALLATION OF VINYL WALLCOVERING SYSTEMS. 9: PAINTING AND STAINING FINISHES 9.50 CLEAN AND TOUCH UP STAIN ALL WOOD FINISH DOORS, EXISITNG WOOD MILLWORK, WOOD PIERS, WOOD BASE AND WOOD TRIM SURFACES TO PROVIDE NICK & SCRATCH FREE, CONSISTENT STAIN COLOR AND TONE SURFACES, TREATMENT NOT TO EXCEED 50°/ OF ALL SURFACES. TREAT ALL SURFACES WITH LIGHT MINERAL SPIRIT SOLVENT TO REMOVE DIRT, DUST AND GREASE. ALLOW DOORS TO DRY, AND LIGHTLY SAND WITH "FINAL STRIPPING PADS", CLEAN RESIDUE WITH "TACK CLOTH". TOUCH UP DOOR SURFACES AND EDGES WITH MATCHING STAIN COLOR. FILL NICKS AND DENTS WITH MATCHING WOOD PUTTY, SMOOTHED AND SANDED TO BE FLUSH. APPLY A COAT OF CLEAR SATIN MINWAX "POLYACRYLIC PROTECTIVE FINISH" USE A FOAM APPLICATOR TYPE BRUSH, ALLOW 8 HOURS TO DRY. DOOR LEVER HARDWARE TO REMAIN IN PLACE DURING REFINISHING, PROTECT DOOR HARDWARE FROM RECEIVING STAIN OR FINISH. 9.52 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL GYP. BRD. / PLASTER FINISH CEILINGS (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR / WSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.54 PROVIDE AND APPLY NEW PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO H.M. DOORS, AND / OR H.M. DOOR FRAMES, ALL EXPOSED SURFACES (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). PROVIDE SMOOTH, GREASE AND DUST FREE SURFACE TO RECEIVE PAINT SYSTEM. CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.58 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL ALREADY PAINTED GYP. BRD. I PLASTER FINISH WALLS, SOFFITS, & BULKHEADS (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR I INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.59 CONTRACTOR SHALL APPLY NEW "SPECIALITY" PAINTING BY SCREEN GOO "PROJECTION SCREEN COATINGS- REFERENCE WHITE REFLECTIVE COATING" WHERE INICATED ON I.D. DRAWINGS. CONTRACTOR SHALL ADHERE TO ALL SPECIFICATIONS FOR WSTALLATION AS PROVIDED BY PAINT MANUFACTURER FOR APPLICATION OF PAINTING SYSTEMS AND SHALL USE AUTHORIZED INSTALLER AS APPROVED BY PAINT MANUFACTURER. 9.60 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL EXISTING LOW WALLS AT RESTAURANT BANQUETTES (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 10: SPECIALITIES 10.06 PROVIDE & INSTALL NEW CONT. ST. STL TILE EDGWG "E80" BY "SCHWTER" (1-800-472-4588 / 1-800-477-9783 FAX) IN 304 ST. STL., FOR THE FULL HEIGHT / LENGTH OF THE EXPOSED EDGE OF WALL TILING. SET TRIM LEG IN TILE MORTAR BED. CONTRACTOR TO COORDINATE AND CONFIRM THAT EDGING STRIP IS COMPATIBLE WITH WALL TILE SYSTEM DEPTH. SEE DETAIL H1 / ID-10.01. 10.07 PROVIDE & INSTALL NEW CONT. ST. STL. TILE EDGWG "Q 100 EB" BY "SCHLUTER" (1-800-472-4588 / 1-800-477-9783 FAX) IN 304 ST. STL., FOR THE FULL HEIGHT / LENGTH OF THE EXPOSED EDGE OF WALL TILING. SET TRIM LEG IN TILE MORTAR BED. CONTRACTOR TO COORDINATE AND CONFIRM THAT EDGING STRIP IS COMPATIBLE WITH WALL TILE SYSTEM DEPTH. SEE DETAIL H3 / ID-10.01. 10.09 (PUBLIC RESTROOMS): CONTRACTOR SHALL RE-INSTALL EXISTING BRIGHTWORK IN SIMILAR AS EXISTING LOCATIONS. CONTRACTOR SHALL ENSURE ADEQUATE IN-WALL BLOCKING IS PROVIDED AT ALL GRAB BARS. 10.10 PROVIDE AND INSTALL NEW BATHROOM STALL DIVIDER PARTITIONS IN THEIR ENTIRETY. PARTITIONS TO INCLUDE PARTITION HARDWARE AND ANCHORS. FOLLOW ALL OF THE MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS FORINSTALLATION.CONTRACTOR/INSTALLERSHALLUSE COMPATIBLE ANCHORS AND CONNECTORS SO AS NOT TO ALLOW FOR GALVANIC ACTION AND I OR RUST TO OCCUR BETWEEN MATERIALS. 10.11 CONTRACTOR SHALL PROVIDE AND INSTALL ALL NEW RECESSED PAPER TOWEL DISPENSER / RECESSED TRASH CAN BY "BOBRICK - 636903". FIXTURE SHALL BE OWNER SPECIFIED / PROVIDED IN LOCATION INDICATED ON DRAWINGS. CONTRACTOR TO INSTALL PER MANUFACTURERS SPECIFICATIONS. CONTRACTOR SHALL VERIFY AND ENSURE THAT ADEQUATE BLOCKING AND SUPPORT BE PROVIDED PER DETAIL "D I D-10.01". 10.13 CONTRACTOR SHALL PROVIDE AND INSTALL NEW OWNER SPECIFIED / PROVIDED BATHROOM TOILET PAPER DISPENSERS BY "BOBRICK -"B-6999" IN LOCATION INDICATED ON DRAWINGS. CONTRACTOR TO INSTALL PER MANUFACTURERS SPECIFICATIONS. CONTRACTOR SHALL VERIFY AND ENSURE THAT ADEQUATE BLOCKING AND SUPPORT BE PROVIDED PER DETAIL "D I ID-10.01". 10.15 CONTRACTOR SHALL PROVIDE & INSTALL NEW FLOOR MOUNTED DOOR STOP BY HAFELE -"937.51.720 DOOR STOP, FLOOR MOUNTED, 35 MM, STAINLESS STEEL, RUBBER BUFFER", WHERE INDICATED ON I.D. DRAWINGS. 11: EQUIPMENT 11.05 CONTRACTOR SHALL ASSIST PROPERTY IN RE-LOCATING EXISTING (EQUIPMENT) TO STORAGE LOCATION DESIGNATED BY PROPERTY DURING CONSTRUCTION, AND SHALL ASSIST PROPERTY IN MOVING (EQUIPMENT) TO FINAL LOCAL UPON COMPLETION OF RENOVATION WORK. 12: FURNISHINGS & FF&E 12.01 CONTRACTOR SHALL ASSIST PROPERTY IN INSTALLATION OF ALL OWNER PROVIDED FF&E ITEMS. 12.02 CONTRACTOR SHALL INSTALL ALL OWNER PROVIDED WALL MOUNTED FRAMED MIRRORS & ARTWORK WITH HARDWARE & SECURITY ANCHORS PROVIDED BY ARTWORK /MIRROR SUPPLIER. LOCATIONS TO BE AS PER DRAWINGS, TO BE VERIFIED IN FIELD WITH DIRECTION BY DESIGNER. CONTRACTOR SHALL VERIFY AND INSURE THAT ADEQUATE BLOCKING AND SUPPORT BE PROVIDED FOR ALL ITEMS BEING HUNG FROM WALLS. AT ADA LOCATION, VANITY MIRROR MUST BE MOUNTED SO THAT REFLECTIVE SURFACE IS 3'-4"A.F.F. MAX. 15: MECHANICAL / PLUMBING 15D2 (BATHROOMS): CONTRACTOR SHALL COVER & PROTECT EXISTING FLOOR DRAINS FROM DAMAGE, DUST AND DEBRIS FOR THE DURATION OF THE RENOVATION /CONSTRUCTION WORK. 15.04 (BATHROOMS): CONTRACTOR SHALL PROVIDE AND INSTALL NEW DECK MOUNTED AUTOMATIC FAUCETS W LOCATIONS INDICATED. FAUCETS TO BE "SLOAN-EFX-200-500-000 BASYS SERIES SENSOR FAUCET" (FOLLOW ALL MECHANICAL/ ELECTRICAL BUILDING AND LOCAL JURISDICTION CODES). 15.05 (BATHROOMS): CONTRACTOR SHALL PROVIDE AND INSTALL NEW DECK MOUNTED AUTOMATIC SOAP DISPENSERS IN LOCATIONS INDICATED. DISPENSERS TO BE "SLOAN-OPTIMA SOAP DISPENSER ESD-400-CP" (FOLLOW ALL MECHANICAL/ ELECTRICAL BUILDING AND LOCAL JURISDICTION CODES). 16: ELECTRICAL / LIGHTING 16.01 PROVIDE & INSTALL NEW OUTLETS AND COVER PLATES AT ALL POWER , GFI, DATA, SWITCHING 8 DIMMER OUTLETS, AND PHONE JACKS. COLOR TO BE WHITE. 16.02 PROVIDE AND INSTALL NEW EDGE LIT EXIT SIGNS AS REQUIRED (SEE ELECTRICAL DRAWINGS). 16.03 (NOT IN USE) 16.04 (NOT IN USE) 16.06 CONTRACTOR SHALL INSTALL ALL "OWNER PROVIDED" DECORATIVE LIGHTWG IN ACCORDANCE WITH LIGHT FIXTURE SCHEDULE AND / OR FF&E SPECIFICATION MANUAL (SEE ELECTRICAL DRAWINGS AS WELL). CONTRACTOR SHALL COORDINATE INSTALLATION WITH NEW CEILINGS, DUCTWORK, GRILLES, A/V EQUIPMENT, AND ALL OTHER CEILING ELEMENTS. CONTRACTOR SHALL VERIFY COMPATIBILITY OF ALL FIXTURES WITH PROPOSED CEILING TYPE (GYP. BRD., A.T.C., ETC.), AND SHALL PROVIDE ALL NECESSARY STRUCTURAL SUPPORTS / BLOCKING TO SUPPORT DECORATIVE FIXTURES (WEIGHTS TO BE PROVIDED BY FABRICATORS). 16.07 CONTRACTOR SHALL RE-INSTALL ALL LIGHT FIXTURES TEMPORARILV REMOVED OR RELOCATED IN ORDER TO PROVIDE SPACE TO CONSTRUCT NEW WORK, IN ACCORDANCE WITH NEW CONSTRUCTION DRAWWGS. CONTRACTOR SHALL COORDINATE RE-INSTALLATION WITH NEW AND EXISTING CEILINGS, DUCTWORK, GRILLES, A/V EQUIPMENT, AND ALL OTHER EXISTING AND / OR NEW CEILING ELEMENTS. 16.11 CONTRACTOR SHALL PROVIDE & INSTALL NEW RECHARGEABLE OUTLET/RECEPTACLE BY "T.B.D." THESE SHALL BE BATTERY OPERATED (NO ELECTRICAL REQUIRED). Q L N � - d � o m n Q _ � o 'O � o"� a Y (� . �, ..: -r �. � coNsu�r�rvrs N T � V � c �� O = U" C W c°� � � '� '- O d � C q W C R N wwa� Z qc�ri � -m � a e Z � E � IL N � ."'. � � � J (n �Q�M OaZo WZa� UQ�Z ZpK J �z�w (�_�� wO�U �Z� w u Z � Q J cn w �� Q o Z W � I ARCHITEQ'S SEAL G J g�yq'�•,� s:cRep :Nso< No. ' y 8Y00�82 i* aE�EnsEOFoa� ❑ PRELIMINARY ONLY ❑ aioowc �PEamirs ❑ CONSTROCTION onre. ovavmzo PROJECT NO: 5352 orenww �w oesi�rven �w CHECM TBD sNEErn.�e GENERAL NOTES FOR NEW WORK 8 NEW WORK PLAN NOTES I SHEET NO[ A.104A