HomeMy WebLinkAboutA-104A - GENERAL NOTES FOR NEW WORK & NEW WORK PLAN NOTESGENERAL NOTES FOR NEW WORK
1. ALL WORK SHALL BE DONE IN WORKMAN LIKE MANNER AND IN
CONFORMANCE WITH MANUFACTURER'S INSTALLATION AND
WARRANTY REQUIREMENTS.
2. ALL WORK TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL AUTHORITIES, RULES, REGULATIONS &
CODES.
3. ALL DIMENSIONS AND FIELD CONDITIONS SHALL BE VERIFIED. ANY
DISCREPANCIES IN DIMENSIONS, CONDITIONS; OR DOCUMENTS
SHALL BE BROUGHT IMMEDIATELY TO THE ARCHITECT'S ATTENTION.
4. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
PROTECT ALL EXISTING MATERIALS, SURFACES, & EQUIPMENT TO
REMAIN.
5. CONTRACTOR SHALL BE LIABLE FOR, AND TAKE ALL PRECAUTIONS
NECESSARY TO PROTECT ALL EQUIPMENT AND BUILDING FROM
DUST, VIBRATIONS AND WATER DAMAGE.
6. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED
TO THE ARCHITECTAND OWNER PRIOR TO PROCEEDING WITH WORK.
7. REMOVE ALL DEBRIS PROPERLY FROM SITE. ALL DEMOLISHED
MATERIAL, EXCEPT THAT LISTED OR MARKED BY ARCHITECT FOR
RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR.
LOAD DEMOLISHED MATERIAL DIRECTLY ON TRUCKS OR INTO
DUMPSTER, DISPOSE OF DEBRIS LEGALLY. DO NOT BURN ON SITE.
DO NOT ALLOW DEBRIS TO ENTER SEWERS OR ROOF DRAINS. DO
NOT LET PILED DEBRIS ENDANGER STRUCTURE, BLOCK EXITS, OR
ROADWAYS. UPON DISCOVERY OF ANY HAZARDOUS MATERIALS,
NOTIFY THE OWNER OF TYPE, LOCATION, AND EXTENT OF SAME.
S. ALL ELECTRIC AND MECHANICAL WORK SHALL BE PROVIDED BY
PERSONNEL LICENSED IN THE STATE OF INDIANA IN ACCORDANCE
WITH ALL LOCAL, STATE, AND FEDERAL CODES.
9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS,
REQUIRED BY ALL AGENCIES AND AUTHORITIES HAVING
JURISDICTION FOR THE WORK INCLUDED IN THIS CONTRACT. PERMIT
SHALL BE CONSPICUOUSLY POSTED AT JOB SITE.
10. THE CONTRACTOR IS SPECIFICALLY RESPONSIBLE FOR ALL MEANS
AND METHODS OF JOB SITE SAFETY.
11. CONTRACTOR SHALL ENSURE THAT NUMBER NOTES ARE READ IN
CONJUNCTION WITH A NUMBER NOTE EXPLANATION, I.E., EACH
SHEET SHOULD NOT BE READ IN ISOLATION BY THE CONTRACTOR'S
WORKMEN OR HIS SUBCONTRACTORS.
12. ANY CONFLICTS IN THE DRAWINGS OR SPECIFICATIONS, OR BETWEEN
DRAWINGS AND SPECIFICATIONS, SHALL BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE ARCHITECT. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION OF
CONFLICTS IS RECEIVED FROM THE ARCHITECT.
13. ALL EXISTING RATED WALLS, FLOORS, CEILINGS, OR SHAFTS MUST BE
MAINTAINED THROUGHOUT NEW CONSTRUCTION, AND ANY
PENETRATIONS OR INTERRUPTIONS MADE TO THESE RATED
SYSTEMS MUST BE REPAIRED TO MAINTAIN RATING.
14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL
TRADES, FOR COORDINATION OF ALL TESTING AND INSPECTIONS
NECESSARY, AND FOR DELIVERY & STORAGE OF ALL MATERIALS
NECESSARY TO COMPLETE THE PROJECT.
15. THE CONTRACTOR SHALL CLEAN SITE AFTER CONSTRUCTION IN A
MANNER CONSISTENT WITH THE CONDITIONS THAT EXISTED PRIOR
TO CONSTRUCTION.
16. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE CONDITIONS OF
EXISTING MATERIALS THAT ARE TO BE REMOVED OR DEMOLISHED.
NEW WORK PLAN NOTES
6: FABRICATIONS
6.03 ATRIUM PUBLIC BATHROOMS: FABRICATE & WSTALL NEW
BATHROOM VANITY COUNTER. COMPONENTS SHALL INCLUDE
THE FOLLOWING: 3/4" SQUARE EDGED STONE COUNTER AND
STONE TURN-DOWN FACE AND BACKSPLASH ON THREE SIDES,
AND WOOD VENEER APRON / PIPE COVER. PROVIDE STEEL
ANGLE FRAME AT LEADING EDGE FOR COUNTER SUPPORT.
ANCHOR VANITY STRUCTURE DIRECTLY TO WALL STRUCTURE.
SEE MILLWORK DRAWINGS FOR DETAILS SIZES & DIMENSIONS.
PROVIDE IN-WALL SOLID BLOCKING AT ALL ANCHOR POINTS.
INSTALL ALL SPECIFIED PLUMBING FIXTURES AND
COORDINATE AND INSTALL ALL REQUIRED PLUMBING
CONNECTIONS, VAWES, P-TRAP, STACK VENT CONNECTIONS,
ETC.. CAULK ALL JOINTS BETWEEN COUNTER &
BACKSPLASHES,AND BETWEEN BACKSPLASHES AND WALL.
7: THERMAL & MOISTURE PROTECTION
7.01 TYPICAL AT ALL WALL COVERING INSTALLATIONS: PROVIDE &
INSTALL CONTINUOUS JOINT SEALANT AT THE INTERSECTION
OF NEW VINYL WALLCOVERING AND ALL OTHER MATERIALS /
SURFACES, INCLUDING BUT NOT LIMITED TO: CEILINGS,
BULKHEADS, DOOR FRAMES, ELEVATOR FRAMES, FIRE
EXTINGUISHER CABIN ETS, SURFACE MOUNTED & RECESSED
HEATING UNITS, MASONRY WALLS, THERMO-PLASTIC WALL
COVERING. TYPICAL: USE ONE-PART NON-SAG ACRYLIC LATEX
TYPE SEALANT COMPLYING WITH ASTM C834, COLOR TO
MATCH WALL SURFACE, BY "TREMCO / 216-292-5000" OR
EQUAL. AT TOP OF VENDING ROOM TILE BASE I
WALLCOVERING USE MILDEW RESISTANT, ONE PART,
SILICONE SEALANT'786 - DOW CORNING CORP / 517-496-4000"
OR EQUAL. FOLLOW ALL MANUFACTURERS
RECOMMENDATIONS.
7.02 TYPICAL AT ALL PLUMBING FIXTURES 8 EDGES OF VANITY
TOPS INCLUDING BUT NOT LIMITED TO TOILETS, SINKS,
URINALS, FLOOR DRAINS & FAUCET SETS: PROVIDE & INSTALL
CONTINUOUS SANITARY SEALANT AT THE INTERSECTION OF
FIXTURE & FLOOR TILE, FIXTURE AND STONE COUNTERS,
FIXTURE & WALL TILE, & ALL OTHER INTERSECTIONS. USE
MILDEW RESISTANT, ONE PART, SILICONE RUBBER, IN CLEAR.
USE ONE OF THE FOLLOWING: "786" BY DOW CORNING CORP.,
500-662-0661, "1700" BY GENERAL ELECTRIC CO., 800-225-8886,
OR "898" BY PECORA CORP., 800-923-6688.
S: DOORS 8 HARDWARE & WINDOWS & GLASS
8.08 (LOBBY BATHROOMS) CONTRACTOR SHALL PROVIDE 8
INSTALL NEW PAINT GRADE VENEER FRAME SWING DOORS
WITH INSET PANEL ON BOTH SIDES AND INSET 1/8" ACRYLIC
MIRROR ON THE OUTSIDE BY "TOTAL PLASTICS" (SLATE) AND
NEW 2" H.M. FRAME TO COORDINATE WITH NEW DOORS AND
HARDWARE INCLUDING PRIVACY LEVER LOCK SET. DOORS
SHALL BE PREPPED FOR HARDWARE AND STAINED & SEALED,
H.M. FRAME SHALL RECEIVE THREE COAT PAINTED FINISH.
9: FINISHES & WALL FRAMING
9.01 PROVIDE & INSTALL NEW GYP. BRD. FINISH WALLS TO THE
EXTENT INDICATED ON DRAWINGS (TYPICALLY "SHADED"
UNLESS OTHERWISE NOTED). SEE WALL SCHEDULE FOR
FRAMING TYPE, SIZE & GAGE. FRAMING SHALL INCLUDE TOP
AND BOTTOM TRACKS WHICH SHALL BE BOLTED TO
STRUCTURE @ CEILING & FLOOR. PROVIDE AND INSTALL
CONTINUOUS DOUBLE STUDS AT DOOR JAMBS. REMOVE
AREA OF CARPETING BELOW NEW FLOOR TRACK PRIOR TO
INSTALLATION OF FLOOR TRACK. TAPE AND SPACKLE WALL
cnnnnrH FnR aFrFivr nF NEW VINYL WALL COVERING.
RELEASEO FOR CONSTRUCTION . CORNER BEADS AT ALL EXTERIOR
'E ALL JOINTS BETWEEN GYP. BRD.
Suhjec��ocompliancewithallregula�ions GYP. BRD.SURFACESTPPROVIDE
o4S�a�eantlLocalCodes FREESUBSTRATE(SEEFINISHINDEX
Cityof Carmel ,REAS TO MCLUDE ALL GYP. BRD.
`�yc,��,'.�", �,�:;val�l„1��_
DATE: 06�30�20
WALLS, CEILINGS AND BULKHEADS. COMPLY WITH ASTM C587.
USE "DIAMOND FINISH PLASTER" BY US GYPSUM CO.
(312321-4000) OR EQUAL.
9.07 CONTRACTOR TO INSTALL ALL NEW OWNER PROVIDED
CARPETING AND CARPET PAD (AS DESIGNED / SELECTED BY
CAUHAUS INC., PER SEAMING DIAGRAMS BY MANUFACTURER).
CONTRACTOR / INSTALLER SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY
"MARRIOTT INC." FOR INSTALLATION OF CARPETING /PADDING
SYSTEMS. AT CARPET INSTALLATIONS OVER AREAS OF
SEVERELY DAMAGED OR UN-EVEN FLOORING CONTRACTOR
SHALL PROVIDE AND WSTALL SKIM COAT OF "LATICRETE 816 -
RAPID UNDERLAYMENT" OVER 100°/ OF DAMAGED OR
UN-EVEN FLOOR SURFACE. INSTALL UNDERLAYMENT PER ALL
REQUIRED SPECIFICATIONS OF "LATICRETE SYSTEMS". NEW
CARPETING SHALL BE CONTINUOUS UNDER OVERHANGS &
OPEN COUNTERS & CASEWORK. CARPETING SHALL NOT RUN
UNDERNEATH BUILT-IN BANQUETTE SEATING.
9.08 PROVIDE AND INSTALL NEW PORCELAIN FLOOR TILE, SEE DRAWINGS
FOR LAY-OUT, SIZES AND EXTENT. RUN FLOORING TILES
UNDERNEATH OVERHANGS, OPEN COUNTERS, CASEWORK &
BANQUETTES. PROVIDE & APPLY "MAPEI -MAPELASTIC 315
CRACK ISOLATION MEMBRANE ON SUBSTRATES UNDERNEATH
ALL NEW TILE WORK. SET TILES TO SUBSTRATE WITH "MAPEI -
THWSETMORTAR. GROUTJOINTSFULLWITH "STARQUARTZ-
QUARTZ LOCK" GROUT, NON-STAINING, ANTI-BACTERIAL
GROUT (OR EQ.). MAXIMUM JOINT SIZE TO BE 3/i6". CLEAN
ALL HAZE AND GROUT FROM TILE SURFACE WITH APPROVED
CLEANER. SEE FINISH SCHEDULE FOR TILE TYPE, COLOR AND
FINISH. CONTRACTOR SHALL SUBMIT GROUT COLOR
SAMPLES FOR SELECTION /APPROVAL PRIOR TO
INSTALLATION. MAINTAIN 8, RE-INSTALL EXISTING FLOOR
JUNCTION BOXES, COVERS. COORDINATE INSTALLATION WITH
ADJACENT FLOORING TO PROVIDE CONTINUOUS, FLUSH
FLOOR SURFACE. SEE FINISH SCHEDULE FOR SPECIFIC
MATERIAL SELECTIONS.
9.09 CONTRACTOR SHALL PROVIDE AND INSTALL NEW WALL TILE.
THINSET TILES TO SUBSTRATE, GROUT AND COMPACT ALL
JOINTS FULL WITH SANDED EPDXY GROUT. MAXIMUN JOINT
SIZE TO BE 1/8". SUBMIT GROUT COLOR SAMPLES FOR
APPROVAL BY DESIGNER (MAPEI OR EQ.). CLEAN ALL HAZE
AND GROUT FROM TILE SURFACE WITH APPROVED CLEANER.
9.10 CONTRACTOR SHALL INSTALL NEW OWNER PROVIDED
"OVERLAY" CARPETING AND CARPET PAD (AS DESIGNED BY
CAUHAUS INC., PER SEAMING DIAGRAMS BY MANUFACTURER.
CONTRACTORIINSTALLER SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY
"MARRIOTT INC." FOR INSTALLATION OF CARPETING / PADDING
SYSTEMS.
9.11 CONTRACTOR SHALL SUPPLY AND INSTALL NEW WOOD WALL
BASE TO MATCH EXISTWG WOOD WALL BASE IN HEIGHT,
THICKESS, AND PROFILE , WHERE INDICATED ON I.D.
DRAWINGS. CONTRACTOR SHALL REMOVE SMALL ADJACENT
WALL BASE PIECES, WHERE NECESSARY, TO PROVIDE
SEAMLESS, CONTINUOUS WALL BASE PIECES. INSTALLATION
TO BE WITH RECESSED FINISH NAILS.
9.12 CONTRACTOR SHALL PROVIDE AND INSTALL NEW FACTORY
FINISHED PORCELAIN TILE WALL BASE, THINSET TILES TO
SUBSTRATE, GROUT AND COMPACT ALL JOINTS FULL. SET
TILES TO SUBSTRATE WITH "MAPEI - THINSET MORTAR. GROUT
JOINTS FULL WITH "STAR QUARTZ - QUARTZ LOCK" GROUT,
NON STAINING ANTI BACTERIAL GROUT (OR EQ.). MAXIMUM
JOINT SIZE TO BE 3/16". OFFSET BASE TILE JOINT LINES TO
MIDPOINTS OF FLOOR TILES AS POSSIBLE.
9.14 CONTRACTOR SHALL PROVIDE AND INSTALL ALL TYPICAL &
ACCENT VINYL WALLCOVERING ON ALL EXISTING & NEW GYP.
BRD. WALLS (UNLESS OTHER FINISH IS SPECIRED). PREP 100%
OF WALL SUBSTRATES TO PROVIDE SMOOTH, CONTINUOUS,
ADHESIVE AND DIRT FREE SURFACE TO RECEIVE NEW WALL
COVERING. CONTRACTOR/INSTALLER SHALL ASSURE THAT
THERE ARE NO VERTICAL SEAMS WITHIN 6" OF ANY CORNERS
AND NO HORIZONTAL SEAMING. SEE FINISH SCHEDULE FOR
WALL COVER TYPES, LOCATIONS, WIDTHS, REPEATS AND
ROLL SIZES. CONTRACTOR/INSTALLER SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY
"MARRIOTT INC." FOR INSTALLATION OF VINYL WALLCOVERING
SYSTEMS.
9: PAINTING AND STAINING FINISHES
9.50 CLEAN AND TOUCH UP STAIN ALL WOOD FINISH DOORS,
EXISITNG WOOD MILLWORK, WOOD PIERS, WOOD BASE AND
WOOD TRIM SURFACES TO PROVIDE NICK & SCRATCH FREE,
CONSISTENT STAIN COLOR AND TONE SURFACES,
TREATMENT NOT TO EXCEED 50°/ OF ALL SURFACES. TREAT
ALL SURFACES WITH LIGHT MINERAL SPIRIT SOLVENT TO
REMOVE DIRT, DUST AND GREASE. ALLOW DOORS TO DRY,
AND LIGHTLY SAND WITH "FINAL STRIPPING PADS", CLEAN
RESIDUE WITH "TACK CLOTH". TOUCH UP DOOR SURFACES
AND EDGES WITH MATCHING STAIN COLOR. FILL NICKS AND
DENTS WITH MATCHING WOOD PUTTY, SMOOTHED AND
SANDED TO BE FLUSH. APPLY A COAT OF CLEAR SATIN
MINWAX "POLYACRYLIC PROTECTIVE FINISH" USE A FOAM
APPLICATOR TYPE BRUSH, ALLOW 8 HOURS TO DRY. DOOR
LEVER HARDWARE TO REMAIN IN PLACE DURING REFINISHING,
PROTECT DOOR HARDWARE FROM RECEIVING STAIN OR
FINISH.
9.52 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO
FINISH COATS) TO ALL GYP. BRD. / PLASTER FINISH CEILINGS
(SEE FINISH SCHEDULE FOR COLORS AND SHEEN).
CONTRACTOR / WSTALLER SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY
"MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS.
9.54 PROVIDE AND APPLY NEW PAINTING SYSTEM (PRIMER & TWO
FINISH COATS) TO H.M. DOORS, AND / OR H.M. DOOR FRAMES,
ALL EXPOSED SURFACES (SEE FINISH SCHEDULE FOR
COLORS AND SHEEN). PROVIDE SMOOTH, GREASE AND DUST
FREE SURFACE TO RECEIVE PAINT SYSTEM. CONTRACTOR /
INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR
INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR
APPLICATION OF PAINTING SYSTEMS.
9.58 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO
FINISH COATS) TO ALL ALREADY PAINTED GYP. BRD. I PLASTER
FINISH WALLS, SOFFITS, & BULKHEADS (SEE FINISH SCHEDULE
FOR COLORS AND SHEEN). CONTRACTOR I INSTALLER SHALL
ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS
PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING
SYSTEMS.
9.59 CONTRACTOR SHALL APPLY NEW "SPECIALITY" PAINTING BY
SCREEN GOO "PROJECTION SCREEN COATINGS- REFERENCE
WHITE REFLECTIVE COATING" WHERE INICATED ON
I.D. DRAWINGS. CONTRACTOR SHALL ADHERE TO ALL
SPECIFICATIONS FOR WSTALLATION AS PROVIDED BY PAINT
MANUFACTURER FOR APPLICATION OF PAINTING SYSTEMS
AND SHALL USE AUTHORIZED INSTALLER AS APPROVED BY
PAINT MANUFACTURER.
9.60 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO
FINISH COATS) TO ALL EXISTING LOW WALLS AT RESTAURANT
BANQUETTES (SEE FINISH SCHEDULE FOR COLORS AND
SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY
"MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS.
10: SPECIALITIES
10.06 PROVIDE & INSTALL NEW CONT. ST. STL TILE EDGWG "E80" BY
"SCHWTER" (1-800-472-4588 / 1-800-477-9783 FAX) IN 304 ST.
STL., FOR THE FULL HEIGHT / LENGTH OF THE EXPOSED EDGE
OF WALL TILING. SET TRIM LEG IN TILE MORTAR BED.
CONTRACTOR TO COORDINATE AND CONFIRM THAT EDGING
STRIP IS COMPATIBLE WITH WALL TILE SYSTEM DEPTH. SEE
DETAIL H1 / ID-10.01.
10.07 PROVIDE & INSTALL NEW CONT. ST. STL. TILE EDGWG "Q 100
EB" BY "SCHLUTER" (1-800-472-4588 / 1-800-477-9783 FAX) IN 304
ST. STL., FOR THE FULL HEIGHT / LENGTH OF THE EXPOSED
EDGE OF WALL TILING. SET TRIM LEG IN TILE MORTAR BED.
CONTRACTOR TO COORDINATE AND CONFIRM THAT EDGING
STRIP IS COMPATIBLE WITH WALL TILE SYSTEM DEPTH. SEE
DETAIL H3 / ID-10.01.
10.09 (PUBLIC RESTROOMS): CONTRACTOR SHALL RE-INSTALL
EXISTING BRIGHTWORK IN SIMILAR AS EXISTING LOCATIONS.
CONTRACTOR SHALL ENSURE ADEQUATE IN-WALL BLOCKING
IS PROVIDED AT ALL GRAB BARS.
10.10 PROVIDE AND INSTALL NEW BATHROOM STALL DIVIDER
PARTITIONS IN THEIR ENTIRETY. PARTITIONS TO INCLUDE
PARTITION HARDWARE AND ANCHORS. FOLLOW ALL OF THE
MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS
FORINSTALLATION.CONTRACTOR/INSTALLERSHALLUSE
COMPATIBLE ANCHORS AND CONNECTORS SO AS NOT TO
ALLOW FOR GALVANIC ACTION AND I OR RUST TO OCCUR
BETWEEN MATERIALS.
10.11 CONTRACTOR SHALL PROVIDE AND INSTALL ALL NEW
RECESSED PAPER TOWEL DISPENSER / RECESSED TRASH
CAN BY "BOBRICK - 636903". FIXTURE SHALL BE OWNER
SPECIFIED / PROVIDED IN LOCATION INDICATED ON
DRAWINGS. CONTRACTOR TO INSTALL PER MANUFACTURERS
SPECIFICATIONS. CONTRACTOR SHALL VERIFY AND ENSURE
THAT ADEQUATE BLOCKING AND SUPPORT BE PROVIDED PER
DETAIL "D I D-10.01".
10.13 CONTRACTOR SHALL PROVIDE AND INSTALL NEW OWNER
SPECIFIED / PROVIDED BATHROOM TOILET PAPER
DISPENSERS BY "BOBRICK -"B-6999" IN LOCATION INDICATED
ON DRAWINGS. CONTRACTOR TO INSTALL PER
MANUFACTURERS SPECIFICATIONS. CONTRACTOR SHALL
VERIFY AND ENSURE THAT ADEQUATE BLOCKING AND
SUPPORT BE PROVIDED PER DETAIL "D I ID-10.01".
10.15 CONTRACTOR SHALL PROVIDE & INSTALL NEW FLOOR
MOUNTED DOOR STOP BY HAFELE -"937.51.720 DOOR STOP,
FLOOR MOUNTED, 35 MM, STAINLESS STEEL, RUBBER
BUFFER", WHERE INDICATED ON I.D. DRAWINGS.
11: EQUIPMENT
11.05 CONTRACTOR SHALL ASSIST PROPERTY IN RE-LOCATING
EXISTING (EQUIPMENT) TO STORAGE LOCATION DESIGNATED
BY PROPERTY DURING CONSTRUCTION, AND SHALL ASSIST
PROPERTY IN MOVING (EQUIPMENT) TO FINAL LOCAL UPON
COMPLETION OF RENOVATION WORK.
12: FURNISHINGS & FF&E
12.01 CONTRACTOR SHALL ASSIST PROPERTY IN INSTALLATION OF
ALL OWNER PROVIDED FF&E ITEMS.
12.02 CONTRACTOR SHALL INSTALL ALL OWNER PROVIDED WALL
MOUNTED FRAMED MIRRORS & ARTWORK WITH HARDWARE &
SECURITY ANCHORS PROVIDED BY ARTWORK /MIRROR
SUPPLIER. LOCATIONS TO BE AS PER DRAWINGS, TO BE
VERIFIED IN FIELD WITH DIRECTION BY DESIGNER.
CONTRACTOR SHALL VERIFY AND INSURE THAT ADEQUATE
BLOCKING AND SUPPORT BE PROVIDED FOR ALL ITEMS BEING
HUNG FROM WALLS. AT ADA LOCATION, VANITY MIRROR MUST
BE MOUNTED SO THAT REFLECTIVE SURFACE IS 3'-4"A.F.F.
MAX.
15: MECHANICAL / PLUMBING
15D2 (BATHROOMS): CONTRACTOR SHALL COVER & PROTECT
EXISTING FLOOR DRAINS FROM DAMAGE, DUST AND DEBRIS
FOR THE DURATION OF THE RENOVATION /CONSTRUCTION
WORK.
15.04 (BATHROOMS): CONTRACTOR SHALL PROVIDE AND INSTALL
NEW DECK MOUNTED AUTOMATIC FAUCETS W LOCATIONS
INDICATED. FAUCETS TO BE "SLOAN-EFX-200-500-000 BASYS
SERIES SENSOR FAUCET" (FOLLOW ALL MECHANICAL/
ELECTRICAL BUILDING AND LOCAL JURISDICTION CODES).
15.05 (BATHROOMS): CONTRACTOR SHALL PROVIDE AND INSTALL
NEW DECK MOUNTED AUTOMATIC SOAP DISPENSERS IN
LOCATIONS INDICATED. DISPENSERS TO BE "SLOAN-OPTIMA
SOAP DISPENSER ESD-400-CP" (FOLLOW ALL MECHANICAL/
ELECTRICAL BUILDING AND LOCAL JURISDICTION CODES).
16: ELECTRICAL / LIGHTING
16.01 PROVIDE & INSTALL NEW OUTLETS AND COVER PLATES AT ALL
POWER , GFI, DATA, SWITCHING 8 DIMMER OUTLETS, AND
PHONE JACKS. COLOR TO BE WHITE.
16.02 PROVIDE AND INSTALL NEW EDGE LIT EXIT SIGNS AS
REQUIRED (SEE ELECTRICAL DRAWINGS).
16.03 (NOT IN USE)
16.04 (NOT IN USE)
16.06 CONTRACTOR SHALL INSTALL ALL "OWNER PROVIDED"
DECORATIVE LIGHTWG IN ACCORDANCE WITH LIGHT FIXTURE
SCHEDULE AND / OR FF&E SPECIFICATION MANUAL (SEE
ELECTRICAL DRAWINGS AS WELL). CONTRACTOR SHALL
COORDINATE INSTALLATION WITH NEW CEILINGS, DUCTWORK,
GRILLES, A/V EQUIPMENT, AND ALL OTHER CEILING ELEMENTS.
CONTRACTOR SHALL VERIFY COMPATIBILITY OF ALL FIXTURES
WITH PROPOSED CEILING TYPE (GYP. BRD., A.T.C., ETC.), AND
SHALL PROVIDE ALL NECESSARY STRUCTURAL SUPPORTS /
BLOCKING TO SUPPORT DECORATIVE FIXTURES (WEIGHTS TO
BE PROVIDED BY FABRICATORS).
16.07 CONTRACTOR SHALL RE-INSTALL ALL LIGHT FIXTURES
TEMPORARILV REMOVED OR RELOCATED IN ORDER TO
PROVIDE SPACE TO CONSTRUCT NEW WORK, IN ACCORDANCE
WITH NEW CONSTRUCTION DRAWWGS. CONTRACTOR SHALL
COORDINATE RE-INSTALLATION WITH NEW AND EXISTING
CEILINGS, DUCTWORK, GRILLES, A/V EQUIPMENT, AND ALL
OTHER EXISTING AND / OR NEW CEILING ELEMENTS.
16.11 CONTRACTOR SHALL PROVIDE & INSTALL NEW
RECHARGEABLE OUTLET/RECEPTACLE BY "T.B.D."
THESE SHALL BE BATTERY OPERATED (NO ELECTRICAL
REQUIRED).
Q
L
N
� -
d � o m n
Q _ � o
'O � o"� a
Y
(� . �, ..: -r �.
� coNsu�r�rvrs
N
T
�
V
� c
��
O =
U"
C
W c°�
� �
'� '-
O d
� C q
W C R N
wwa�
Z qc�ri
� -m
� a e
Z � E �
IL N � ."'.
�
�
�
J (n
�Q�M
OaZo
WZa�
UQ�Z
ZpK
J
�z�w
(�_��
wO�U
�Z�
w
u
Z
� Q J
cn w
��
Q o
Z
W
�
I ARCHITEQ'S SEAL
G
J g�yq'�•,�
s:cRep :Nso<
No. ' y
8Y00�82 i*
aE�EnsEOFoa�
❑ PRELIMINARY ONLY
❑ aioowc
�PEamirs
❑ CONSTROCTION
onre. ovavmzo
PROJECT NO: 5352
orenww �w
oesi�rven �w
CHECM TBD
sNEErn.�e
GENERAL NOTES FOR NEW
WORK 8 NEW WORK PLAN
NOTES
I SHEET NO[
A.104A