HomeMy WebLinkAboutA-106A - GENERAL NOTES FOR NEW WORK & NEW WORK PLAN NOTESGENERAL NOTES FOR NEW WORK 1. ALL WORK SHALL BE DONE IN WORKMAN LIKE MANNER AND IN CONFORMANCE WITH MANUFACTURER'S INSTALLATION AND WARRANTY REQUIREMENTS. 2. ALL WORK TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL AUTHORITIES, RULES, REGULATIONS & CODES. 3. ALL DIMENSIONS AND FIELD CONDITIONS SHALL BE VERIFIED. ANY DISCREPANCIES IN DIMENSIONS, CONDITIONS, OR DOCUMENTS SHALL BE BROUGHT IMMEDIATELY TO THE ARCHITECT'S ATTENTION. 4. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ALL EXISTING MATERIALS, SURFACES, & EQUIPMENT TO REMAIN. 5. CONTRACTOR SHALL BE LIABLE FOR, AND TAKE ALL PRECAUTIONS NECESSARY TO PROTECT ALL EQUIPMENT AND BUILDING FROM DUST, VIBRATIONS AND WATER DAMAGE. 6. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT AND OWNER PRIOR TO PROCEEDING WITH WORK. 7. REMOVE ALL DEBRIS PROPERLY FROM SITE. ALL DEMOLISHED MATERIAL, EXCEPT THAT LISTED OR MARKED BY ARCHITECT FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR. LOAD DEMOLISHED MATERIAL DIRECTLY ON TRUCKS OR INTO DUMPSTER, DISPOSE OF DEBRIS LEGALLY. DO NOT BURN ON SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS OR ROOF DRAINS. DO NOT LET PILED DEBRIS ENDANGER STRUCTURE, BLOCK EXITS, OR ROADWAYS. UPON DISCOVERY OF ANY HAZARDOUS MATERIALS, NOTIFY THE OWNER OF TYPE, LOCATION, AND EXTENT OF SAME. 8. ALL ELECTRIC AND MECHANICAL WORK SHALL BE PROVIDED BY PERSONNEL LICENSED IN THE STATE OF INDIANA IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL CODES. 9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, REQUIRED BY ALL AGENCIES AND AUTHORITIES HAVING JURISDICTION FOR THE WORK INCLUDED IN THIS CONTRACT. PERMIT SHALL BE CONSPICUOUSLY POSTED AT JOB SITE. 10. THE CONTRACTOR IS SPECIFICALLY RESPONSIBLE FOR ALL MEANS AND METHODS OF JOB SITE SAFETY. 11. CONTRACTOR SHALL ENSURE THAT NUMBER NOTES ARE READ IN CONJUNCTION WITH A NUMBER NOTE EXPLANATION, I.E., EACH SHEET SHOULD NOT BE READ IN ISOLATION BY THE CONTRACTOR'S WORKMEN OR HIS SUBCONTRACTORS. 12. ANY CONFLICTS IN THE DRAWINGS OR SPECIFICATIONS, OR BETWEEN DRAWINGS AND SPECIFICATIONS, SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION OF CONFLICTS IS RECEIVED FROM THE ARCHITECT. 13. ALL EXISTING RATED WALLS, FLOORS, CEILINGS, OR SHAFTS MUST BE MAINTAW ED THROUGHOUT NEW CONSTRUCTION, AND ANY PENETRATIONS OR INTERRUPTIONS MADE TO THESE RATED SYSTEMS MUST BE REPAIRED TO MAINTAIN RATING. 14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL TRADES, FOR COORDINATION OF ALL TESTING AND INSPECTIONS NECESSARY, AND FOR DELIVERY & STORAGE OF ALL MATERIALS NECESSARY TO COMPLETE THE PROJECT. 15. THE CONTRACTOR SHALL CLEAN SITE AFTER CONSTRUCTION IN A MANNER CONSISTENT WITH THE CONDITIONS THAT EXISTED PRIOR TO CONSTRUCTION. 16. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE CONDITIONS OF EXISTING MATERIALS THAT ARE TO BE REMOVED OR DEMOLISHED. NEW WORK PLAN NOTES INDICATED ON DRAWINGS (TYPICALLY "SHADED" UNLESS OTHERWISE NOTED). SEE WALL SCHEDULE FOR FRAMING TYPE, SIZE & GAGE. AT FULL HEIGHT WALLS, FRAMING SHALL INCLUDE TOP AND BOTTOM TRACKS WHICH SHALL BE BOLTED TO STRUCTURE @ CEILING & FLOOR. AT PARTIAL HEIGHT WALL DIEWALLS, FRAMING SHALL BE ATTACHED TO STRUCTURE AT FLOOR AND UNDERSIDE OF COUNTERTOP ABOVE. PROVIDE AND INSTALL CONTINUOUS DOUBLE STUDS AT DOOR JAMBS. REMOVE AREA OF CARPETING BELOW NEW FLOOR TRACK PRIOR TO INSTALLATION OF FLOOR TRACK. TAPE AND SPACKLE WALL SMOOTH FOR RECEIPT OF NEW VINYL WALL COVERING. PROVIDE & INSTALL CONT. CORNER BEADS AT ALL EXTERIOR GYP. BRD. CORNERS, TAPE ALL JOINTS BETWEEN GYP. BRD. PANELS, SKIM COAT ALL GYP. BRD. SURFACES TP PROVIDE FLUSH, SMOOTH, CRACK FREE SUBSTRATE (SEE FINISH INDEX FOR FINISH MATERIAL). AREAS TO WCLUDE ALL GYP. BRD. WALLS, CEILINGS AND BULKHEADS. COMPLY WITH ASTM C587. USE "DIAMOND FINISH PLASTER" BY US GYPSUM CO. (312321-4000) OR EQUAL. 9.02 PROVIDE NECESSARY MATERIALS AND CONSTRUCT NEW 5l8" GYPSUM WALLBOARD BULKHEAD. USE 3 5/8" MTL. STUD FRAMING SYSTEM, MIN. 24 GA., FRAMING TO BE 16" O.C. MAX. EXTEND FR4MING ABOVE CEILING & ANCHOR TO STRUCTURE ABOVE WITH CLIP ANGLES SET INTO SLAB WITH POWDER DRIVEN FASTENERS. TAPE AND SPACKLE BULKHEAD SMOOTH TO RECEIVE NEW THREE COAT PAINT SYSTEM. PROVIDE & INSTALL CONT. CORNER BEADS AT ALL EXTERIOR GYP. BRD. CORNERS, TAPE ALL JOINTS BETWEEN GYP. BRD. PANELS, SKIM COAT ALL GYP. BRD. SURFACES TP PROVIDE FLUSH, SMOOTH, CRACK FREE SUBSTRATE (SEE FINISH INDEX FOR FINISH MATERIAL). AREAS TO INCLUDE ALL GYP. BRD. WALLS, CEILINGS AND BULKHEADS. COMPLY WITH ASTM C587. USE "DIAMOND FINISH PLASTER" BY US GYPSUM CO. (312-321-4000) OR EQUAL. 9.07 CONTRACTOR TO INSTALL ALL NEW OWNER PROVIDED CARPETING AND CARPET PAD (AS DESIGNED / SELECTED BY CAUHAUS INC., PER SEAMING DIAGRAMS BY MANUFACTURER). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR INSTALLATION OF CARPETING /PADDING SYSTEMS. AT CARPET INSTALLATIONS OVER AREAS OF SEVERELY DAMAGED OR UN-EVEN FLOORING CONTRACTOR SHALL PROVIDE AND INSTALL SKIM COAT OF "LATICRETE 816 - RAPID UNDERLAYMENT" OVER 100 % OF DAMAGED OR UN-EVEN FLOOR SURFACE. INSTALL UNDERLAYMENT PER ALL REQUIRED SPECIFICATIONS OF "LATICRETE SYSTEMS". NEW CARPETING SHALL BE CONTINUOUS UNDER OVERHANGS & OPEN COUNTERS & CASEWORK. CARPETMG SHALL NOT RUN UNDERNEATH BUILT-IN BANQUETTE SEATING. � 4: STONE 4.01 CONTRACTOR SHALL PROVIDE & INSTALL NEW STONE COUNTER TOPS & BACKSPLASH WHERE INDICATED IN FABRICATION OR OTHER DRAWINGS. FULLY ADHERE TOPS TO STABLE SUBSTRATES, FULLY ADHERE BACKSPLASH TO GYP. BRD. SUBSTRATES. TYPICAL EDGE g.� � DETAIL IS SQUARE WITH EASED EDGES. PROVIDE & INSTALL CONTINUOUS CLEAR SILICONE BEAD AT ALL STONE INTERSECTIONS, AND BETWEEN STONE AND V.W.0 OR OTHER WALL FINISH. 7: THERMAL & MOISTURE PROTECTION 7.01 TYPICAL AT ALL WALL COVERING INSTALLATIONS: PROVIDE & INSTALL CONTINUOUS JOINT SEALANT AT THE INTERSECTION OF NEW VINYL WALLCOVERING AND ALL OTHER MATERIALS / SURFACES, MCLUDMG BUT NOT LIMITED TO: CEILMGS, BULKHEADS, DOOR FRAMES, ELEVATOR FRAMES, FIRE EXTINGUISHER CABIN ETS, SURFACE MOUNTED & RECESSED HEATING UNITS, MASONRY WALLS, THERMO-PLASTIC WALL COVERING. TYPICAL: USE ONE-PART NON-SAG ACRYLIC LATEX TYPE SEALANT COMPLYING WITH ASTM C834, COLOR TO MATCH WALL SURFACE, BY "TREMCO / 216-292-5000" OR EQUAL. AT TOP OF VENDING ROOM TILE BASE / WALLCOVERING USE MILDEW RESISTANT, ONE PART, SILICONE SEALANT "786 - DOW CORNING CORP / 517-496-4000" OR EQUAL FOLLOW ALL MANUFACTURERS RECOMMENDATIONS. 8: DOORS & HARDWARE & WINDOWS & GLASS 8.03 PROVIDE & INSTALL NEW 1 3/4" X 3'-0" X 7'-0" SOLID WOOD CORE DOUBLE SWING PRE-FINISHED TRAFFIC DOOR WITH HIGH PRESSURE LAMINATE ON BOTH SIDES, BY "CHASE" DOORS (CONTACT: MIKE HAIDINGER / CHASE DOORS / 800-543-4455 X-2917 / 800-245-7045 FAX.). CONTRACTOR SHALL VERFIY SIZE & FIT OF PROPOSED DOOR IN FIELD PRIOR TO PURCHASE, TO ASSURE PROPER FIT AND INSTALLATION. PROVIDE & INSTALL "KITCHEN CLASSIC - RETRO DINER SERIES -MODEL NUMBER "KC 5026" W/ CONCEALED PIVOTS, BY "CHASE DOORS" IN "NEVAMAR/ MATTE BLACK" LAMINATE FORMICA ON BOTH SIDES, WITH 12" ROUND SHATTER RESISTANT CLEAR ACRYLIC VISION PANEL SET IN BLACK RUBBER MOLDING (60" A.F.F. TO CENTER), WITH 8" SATIN ST. STL. KICK PLATE (BOTH SIDES). ALL EDGES SHALL BE COVERED WITH ST. STL. EDGE TRIM (T.M.KICK PL.). PROVIDE AND INSTALL ALL ASSOCIATED HARDWARE, ACCESSORIES AND ANCHORS AS PROVIDED & REQUIRED BY "CHASE DOORS". PROVIDE PRODUCT DATA OF EACH DOOR TYPE & SHOP DRAWINGS SHOWING FABRICATION AND INSTALLATION DETAILS FOR REVIEW BY ARCHITECT (PRIOR TO PURCHASE). INSTALL PER MANUFACTURERS REQUIRED MEANS & METHODS FOR INSTALLATION. 8.07 CONTRACTOR SHALL PROVIDE & INSTALL GLASS DOOR AND / OR WINDOW FILM ON WINDOWS INDICATED ON I.D. DRAWINGS. WINDOW FILM T.B.D. 8.08A CONTRACTOR SHALL PROVIDE & INSTALL NEW STAIN GRADE DOORS NEW 2" H.M. FRAME TO COORDINATE WITH NEW DOORS AND HARDWARE. DOORS SHALL BE PREPPED FOR HARDWARE AND STAINED & SEALED, H.M. FRAME SHALL RECEIVE THREE COAT PAINTED FINISH. 8.11 PROVIDE & INSTALL NEW PTD. 2" WELDED H.M. FRAME WITH DOOR STOPS(SEE WALLSCHEDULEFOR WALLTHICKNESS/ CONSTRUCTION). PRE-PRIME FRAME TO RECEIVE MIN. TWO FINISH COATS IN FIELD. PROVIDE AND INSTALL JAMB AND BASE ANCHORS, TO ANCHOR FRAME TO NEW STUD FRAMING. PROVIDE AND INSTALL MINIMUM FOUR JAMB ANCHORS PER SIDE USING #6 SELF TAPPING SCREWS, 3/8" MIN. MORTISE FRAME TO RECEIVE NEW DOOR HINGES, AND PROVIDE OPENING FOR DOOR STRIKE. CONTRACTOR SHALL PROVIDE & INSTALL BACK TO BACK DOUBLE VERTICAL MTL STUD AT ALLFRAMEJAMBS. 5.12 CONTRACTOR SHALL PROVIDE AND INSTALL NEW AUTOMATIC GLASS "-'N DOORS TO INCLUDE DOORS, MOTOR, RELEA5E0 FOR CONSTRUCTION .ESHo�o. Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes Cityof Carmel �P. BRD. FINISH WALLS TO THE EXTENT `�yc,��,'.�" �,�:;valol„1��. DATE: 06�30�20 9.13 PROVIDE AND INSTALL NEW PORCELAIN FLOOR TILE, SEE DRAWINGS FOR LAY-OUT, SIZES AND EXTENT. RUN FLOORING TILES UNDERNEATH OVERHANGS, OPEN COUNTERS, CASEWORK & BANQUETTES. PROVIDE & APPLY "MAPEI -MAPELASTIC 315 CRACK ISOLATION MEMBRANE ON SUBSTRATES UNDERNEATH ALL NEW TILE WORK. SET TILES TO SUBSTRATE WITH "MAPEI - THINSET MORTAR. GROUT JOINTS FULL WITH "STAR QUARTZ - QUARTZ LOCK" GROUT, NON-STAINING, ANTI-BACTERIAL GROUT (OR EQ.). MAXIMUM JOINT SIZE TO BE 3/16". CLEAN ALL HAZE AND GROUT FROM TILE SURFACE WITH APPROVED CLEANER. SEE FINISH SCHEDULE FOR TILE TYPE, COLOR AND FINISH. CONTRACTOR SHALL SUBMIT GROUT COLOR SAMPLES FOR SELECTION IAPPROVAL PRIOR TO INSTALLATION. MAINTAIN & RE-INSTALL EXISTING FLOOR JUNCTION BOXES, COVERS. COORDINATE INSTALLATION WITH ADJACENT FLOORING TO PROVIDE CONTINUOUS, FLUSH FLOOR SURFACE. SEE FINISH SCHEDULE FOR SPECIFIC MATERIAL SELECTIONS. CONTRACTOR SHALL SUPPLY AND INSTALL NEW WOOD WALL BASE TO MATCH EXISTING WOOD WALL BASE IN HEIGHT, THICKESS, AND PROFILE , WHERE INDICATED ON DRAWINGS. CONTRACTOR SHALL REMOVE SMALL ADJACENT WALL BASE PIECES, WHERE NECESSARY, TO PROVIDE SEAMLESS, CONTINUOUS WALL BASE PIECES. INSTALLATION TO BE WITH RECESSED FINISH NAILS. CONTRACTOR SHALL SUPPLY AND INSTALL NEW VINYL BASE WHERE INDICATED ON DRAWINGS. INSTALL PER MANUFACTURER'S INSTRUCTIONS. 9.14 CONTRACTOR SHALL PROVIDE AND INSTALL ALL TYPICAL & ACCENT VINYL WALLCOVERING ON ALL EXISTING & NEW GYP. BRD. WALLS (UNLESS OTHER FINISH IS SPECIFIED). PREP 100°/ OF WALL SUBSTRATES TO PROVIDE SMOOTH, CONTINUOUS, ADHESIVE AND DIRT FREE SURFACE TO RECEIVE NEW WALL COVERING. CONTRACTOR/INSTALLER SHALL ASSURE THAT THERE ARE NO VERTICAL SEAMS WITHIN 6" OF ANY CORNERS AND NO HORIZONTAL SEAMING. SEE FINISH SCHEDULE FOR WALL COVER TYPES, LOCATIONS, WIDTHS, REPEATS AND ROLL SIZES. CONTRACTOR/WSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR INSTALLATION OF VINYL WALLCOVERING SYSTEMS. 9.18 CONTRACTOR SHALL PROVIDE & INSTALL NEW MTL. FRAMING LINTEL OVER OPENING FOR DOOR SIZES INDICATED ON DRAWINGS. SEE WALL SCHEDULE FOR FRAMING TYPE, SIZE & GAGE. LINTEL SHALL MATCH ADJACENT WALLS IN THICKNESS, TYPE & GA.. 9.19 CONTRACTOR TO INSTALL NEW WOVEN VINYL FLOORING AND COORDINATING UNDERLAYMENT WHERE INDICATED ON DRAWINGS. INSTALL PER MANUFACTURER'S INSTRUCTIONS. 9: PAINTING AND STAINING FINISHES 9.50 CLEAN AND TOUCH UP STAIN ALL WOOD FINISH DOORS, EXISITNG WOOD MILLWORK, WOOD PIERS, WOOD BASE AND WOOD TRIM SURFACES TO PROVIDE NICK & SCRATCH FREE, CONSISTENT STAIN COLOR AND TONE SURFACES, TREATMENT NOT TO EXCEED 50°/ OF ALL SURFACES. TREAT ALL SURFACES WITH LIGHT MINERAL SPIRIT SOLVENT TO REMOVE DIRT, DUST AND GREASE. ALLOW DOORS TO DRY, AND LIGHTLY SAND WITH "FINAL STRIPPWG PADS", CLEAN RESIDUE WITH "TACK CLOTH". TOUCH UP DOOR SURFACES AND EDGES WITH MATCHING STAIN COLOR. FILL NICKS AND DENTS WITH MATCHING WOOD PUTTY, SMOOTHED AND SANDED TO BE FWSH. APPLY A COAT OF CLEAR SATIN MINWAX "POLYACRYLIC PROTECTIVE FINISH" USE A FOAM APPLICATOR TYPE BRUSH, ALLOW 8 HOURS TO DRY. DOOR LEVER HARDWARE TO REMAIN IN PLACE DURING REFINISHING, PROTECT DOOR HARDWARE FROM RECEIVING STAIN OR FINISH. 9.52 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL GYP. BRD. / PLASTER FINISH CEILINGS (SEE RNISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.53 PROVIDE AND APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL ACCESS PANELS, GRILLES, LOUVERS, RADIATORS & METAL HVAC COVERS. PROVIDE SMOOTH, GREASE AND DUST FREE SURFACE TO RECEIVE PAINT SYSTEM. (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR I INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.54 PROVIDE AND APPLY NEW PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO H.M. DOORS, AND I OR H.M. DOOR FRAMES, ALL EXPOSED SURFACES (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). PROVIDE SMOOTH, GREASE AND DUST FREE SURFACE TO RECEIVE PAINT SYSTEM. CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.55 PROVIDE AND APPLY NEW PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO WOOD DOOR FRAMES NOTED TO BE PAINTED OR ALREADY PAINTED. ALL EXPOSED SURFACES (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR WSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.58 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL ALREADY PAINTED GYP. BRD. / PLASTER FINISH WALLS, SOFFITS, & BULKHEADS (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 11: EQUIPMENT 11.03 FLAT SCREEN TELEVISION (EXISTING / RELOCATED): CONTRACTOR SHALL REINSTALL FLAT SCREEN TELEVISIONS & TELEVISION MOUNTWG DEVICES, WHERE INDICATED ON DRAWINGS, W LOCATIONS WHERE THEY HAVE BEEN TEMPORARILY REMOVED OR RELOCATED IN ORDER TO PROVIDE SPACE TO CONSTRUCT NEW WORK, IN ACCORDANCE WITH NEW CONSTRUCTION DRAW WGS. CONTRACTOR SHALL PROVIDE ALL NECESSARY IN WALL BLOCKING TO SUPPORT TV & TV MOUNTING BRACKET IF EXISTING CONDITIONS DO NOT PROVIDE ADEQUATE SUPPORT. CONTRACTOR SHALL PROVIDE ALL NECESSARY ELECTRICAL CONNECTIONS REQUIRED FOR OPERATION I INSTALLATION OF EQUIPMENT. CONTRACTER SHALL COORDINATE RE-INSTALLATION WITH NEW & EXISTING WALL AND/OR CEILING FINISHES. CONTRACTOR SHALL COORDINATE WITH PROPERTY & HELP TO I NSTALL AN D CON N ECT CABLE W I RI N G SYSTEMS TO ALL TELEVISIONS. 12: FURNISHINGS & FF&E 12.01 CONTRACTOR SHALL ASSIST PROPERTY IN INSTALLATION OF ALL OWNER PROVIDED FF&E ITEMS. 12.02 CONTRACTOR SHALL INSTALL ALL OWNER PROVIDED WALL MOUNTED FRAMED MIRRORS & ARTWORK WITH HARDWARE & SECURITY ANCHORS PROVIDED BY ARTWORK /MIRROR SUPPLIER. LOCATIONS TO BE AS PER DRAWINGS, TO BE VERIFIED IN FIELD WITH DIRECTION BY DESIGNER. CONTRACTOR SHALL VERIFY AND INSURE THAT ADEQUATE BLOCKING AND SUPPORT BE PROVIDED FOR ALL ITEMS BEING HUNG FROM WALLS. 12.05 CONTRACTOR SHALL INSTALL OWNER-PROVIDED ROLLER SHADE WITH BLACKOUTAND SHEER SHADES WITH SIDE TRACKS, AND ALL ASSOCIATED HARDWARE, BY OWNER. CONTRACTOR TO CONFIRM ADEQUATE SUPPORT BLOCKING BEFORE INSTALLATION OF WINDOW SHADES.INSTALLSHADES PER MANUFACTURERSINSTALLATION INSTRUCTIONS. 15: MECHANICAL / PLUMBING 15.01 (NOT IN USE) 16: ELECTRICAL / LIGHTING 16.01 PROVIDE & INSTALL NEW OUTLETS AND COVER PLATES AT ALL POWER , GFI, DATA, SWITCHING & DIMMER OUTLETS, AND PHONE JACKS. COLOR TO BE WHITE. 16.02 `�x�x3 PROVIDE AND INSTALL NEW EDGE LIT EXIT SIGNS AS REQUIRED (SEE ELECTRICAL DRAWINGS). (NOT IN USE) 16.06 CONTRACTOR SHALL INSTALL ALL "OWNER PROVIDED" DECORATIVE LIGHTING IN ACCORDANCE WITH LIGHT FIXTURE SCHEDULE AND / OR FF&E SPECIFICATION MANUAL (SEE ELECTRICAL DRAWINGS AS WELL). CONTRACTOR SHALL COORDINATE INSTALLATION WITH NEW CEILWGS, DUCTWORK, GRILLES, AN EQUIPMENT, AND ALL OTHER CEILWG ELEMENTS. CONTRACTOR SHALL VERIFY COMPATIBILITY OF ALL FIXTURES WITH PROPOSED CEILING TYPE (GYP. BRD., A.T.C., ETC.), AND SHALL PROVIDE ALL NECESSARY STRUCTURAL SUPPORTS / BLOCKING TO SUPPORT DECORATIVE FIXTURES (WEIGHTS TO BE PROVIDED BY FABRICATORS). Q L N N - c ai� ��� Q _ � o 'O o�'�� Y yT,,.. �:. coNsu�r�rvrs N � � U � C �� O = U" � WU G-' m � c O � c m W c m `V W wb� Z q � ui 3 -m � u d � W Ni�^ � � � J (n FQ�M OaZo WZa� UQ�Z Zp�� cai�zgw (�_�� WO�U �Z� w U Z � Q J c!) w �� Q o Z w � HRCMITEQ'$ $EAL J g�yq'�•,� sicreEa ;,�J`o' ': a aE�EnsEOFoa� ❑ PRELIMINARY ONLY ❑ aioowc �vEamirs ❑ CONSTROCTION onre�.oanuzozo aao�ecrNo: sasz oanwN, �w oesicrven �w cHECK:reo sHEET,i,�e. GENERAL NOTES FOR NEW WORK 8 NEW WORK PLAN NOTES SHEET NO' A.106A