HomeMy WebLinkAboutA-204 - NEW CONST ENLARGED LOBBY LEVEL RCP LOBBY & RESTROOMS�
�
0 0
� II 4 II II II �
I ° I �
- o � o
C RRID R W 16 �S �
� 0 14 0 � � RESTROOM �
O 9.17
�
� � BUSINESS
0 0 �
. . ;� o �l � o o CEN
8'-SU "AF.F.
❑ � �� � -�'� ��� � .�'
� . .. : � o� o o �
� � . � - . .. . PT 04 .
. � � � . . . . . . TYP. .
Q PT-0
9.51
� CrYP,)
�.n ❑O �� O % o
i i.o� � I
� P-OS 20'-91 2" A.F.F Q Q .
� O c ror �s O
T 65 �
0 PT-0
�
� 16:�6 Q . .. 16.06 Q .
� PT 07 �
LOBB
_ O pp O
� PT-07
� � 9 05 . pT_ � � �
�.. O � � . � ... . �� P -04
� O � O
O � O �
� � Q er-a o 0
PT-04 �
PT-0S
� �. TYP. � �� PT 04
�
_ O O
O
PT 04
�� PTYP. �� � � �� , �. TYP. .. � . O .. .
-___ __-.,. . . . .. �� PT-02. .. .
-� � '�-r � ❑ .. . � ❑
� RF fSTRk� ION
��
o I I o
o O
0
0
0
LJ �
��� �16.05�-i
I fi.05�
F o
: �
0
0
� I II II I o II
NEW CONSTRUCTION ENLARGED LOBBY LEVEL REFLECTED CEILING PLAN- LOBBY
�`�� SCALE:1/4" = 1'-0"
GENERAL NOTES FOR NEW WORK
1. ALL WORK SHALL BE DONE IN WORKMAN LIKE MANNER AND IN
CONFORMANCE WITH MANUFACTURER'S INSTALLATION AND
WARRANTY REQUIREMENTS.
2. ALL WORK TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL AUTHORITIES, RULES, REGULATIONS &
CODES.
3. ALL DIMENSIONS AND RELD CONDITIONS SHALL BE VERIFIED. ANY
DISCREPANCIES IN DIMENSIONS, CONDITIONS, OR DOCUMENTS
SHALL BE BROUGHT IMMEDIATELY TO THE ARCHITECT'S ATTENTION.
4. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
PROTECT ALL EXISTING MATERIALS, SURFACES, & EQUIPMENT TO
REMAIN.
5. CONTRACTOR SHALL BE LIABLE FOR, AND TAKE ALL PRECAUTIONS
NECESSARYTO PROTECTALL EQUIPMENTAND BUILDING FROM
DUST, VIBRATIONS AND WATER DAMAGE.
6. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED
TO THE ARCHITECTAND OWNER PRIOR TO PROCEEDING WITH WORK.
7. REMOVE ALL DEBRIS PROPERLY FROM SITE. ALL DEMOLISHED
�AATFRIAI Fxr.Fcr rNnr i i.¢rFn nR MARKED BY ARCHITECT FOR
RELEA5E0 FOR CONSTRUCTION 20PERTY OF THE CONTRACTOR.
CTLY ON TRUCKS OR INTO
Rs���q Suhjec��ocompliancewithallregula�ions �;GALLY. DO NOT BURN ON SITE.
o4S�a�eantlLocalCodes gEWERSORROOFDRAINS. DO
'„ „� CityofCarmel STRUCTURE, BLOCK EXITS, OR
� " .y ,
Q y,:,�r; ,�;vawa!
0.R�
DATE: 06�30�20
O�
O
O
O O �
�
n �
0
O
O
O
STAIR - •
o O1
O
�
�
0
❑ Q
PT 08
0
_ VEST�IBULE�.
O
0 0�
0
0
�
AD 91N.
0
ROADWAYS. UPON DISCOVERY OF ANY HAZARDOUS MATERIALS,
NOTIFY THE OWNER OF TYPE, LOCATION, AND EXTENT OF SAME.
8. ALL ELECTRIC AND MECHANICAL WORK SHALL BE PROVIDED BY
PERSONNEL LICENSED IN THE STATE OF INDIANA IN ACCORDANCE
WITH ALL LOCAL, STATE, AND FEDERAL CODES.
9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS,
REQUIRED BY ALL AGENCIES AND AUTHORITIES HAVING
JURISDICTION FOR THE WORK INCLUDED IN THIS CONTRACT. PERMIT
SHALL BE CONSPICUOUSLY POSTED AT JOB SITE.
10. THE CONTRACTOR IS SPECIFICALLY RESPONSIBLE FOR ALL MEANS
AND METHODS OF JOB SITE SAFETY.
11. CONTRACTOR SHALL ENSURE THAT NUMBER NOTES ARE READ IN
CONJUNCTION WITH A NUMBER NOTE EXPLANATION, I.E., EACH
SHEET SHOULD NOT BE READ IN ISOLATION BY THE CONTRACTOR'S
WORKMEN OR HIS SUBCONTRACTORS.
12. ANY CONFLICTS IN THE DRAWINGS OR SPECIFICATIONS, OR BETWEEN
DRAWINGS AND SPECIFICATIONS, SHALL BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE ARCHITECT. THE CONTRACTOR
SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION OF
CONFLICTS IS RECEIVED FROM THE ARCHITECT.
13. ALL EXISTING RATED WALLS, FLOORS, CEILINGS, OR SHAFTS MUST BE
MAINTAINED THROUGHOUT NEW CONSTRUCTION, AND ANY
PENETRATIONS OR INTERRUPTIONS MADE TO THESE RATED
SYSTEMS MUST BE REPAIRED TO MAINTAIN RATING.
14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL
TRADES, FOR COORDINATION OF ALL TESTING AND INSPECTIONS
C��
C��
O
�
O
O
O
� Q
NECESSARY, AND FOR DELIVERY & STORAGE OF ALL MATERIALS
NECESSARY TO COMPLETE THE PROJECT.
15. THE CONTRACTOR SHALL CLEAN SITE AFTER CONSTRUCTION IN A
MANNER CONSISTENT WITH THE CONDITIONS THAT EXISTED PRIOR
TO CONSTRUCTION.
16. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE CONDITIONS OF
EXISTING MATERIALS THAT ARE TO BE REMOVED OR DEMOLISHED.
NEW WORK PLAN NOTES
9: PAINTING AND STAINING FINISHES
9.02 PROVIDE NECESSARY MATERIALS AND CONSTRUCT NEW SIS"
GYPSUM WALLBOARD BULKHEAD. USE 3 SIS" MTL. STUD
FRAMING SYSTEM, MIN. 24 GA., FRAMING TO BE 16" O.C. MAX.
EXTEND FRAMMG ABOVE CEILWG & ANCHOR TO STRUCTURE
ABOVE WITH CLIP ANGLES SET INTO SLAB WITH POWDER
DRIVEN FASTENERS. TAPE AND SPACKLE BULKHEAD SMOOTH
TO RECEIVE NEW THREE COAT PAINT SYSTEM. PROVIDE &
INSTALL CONT. CORNER BEADS AT ALL EXTERIOR GYP. BRD.
CORNERS, TAPE ALL JOINTS BETWEEN GYP. BRD. PANELS,
SKIM COAT ALL GYP. BRD. SURFACES TP PROVIDE FLUSH,
SMOOTH, CRACK FREE SUBSTRATE (SEE FINISH INDEX FOR
FINISH MATERIAL). AREAS TO INCLUDE ALL GYP. BRD. WALLS,
CEILINGS AND BULKHEADS. COMPLY WITH ASTM C587. USE
"DIAMOND FINISH PLASTER" BY US GYPSUM CO. (312-321-4000)
OR EQUAL.
9.03 FURNISH & INSTALL NEW "NON-SAG" 5/8" TAPERED EDGE,
GYPSUM WALLBOARD "SUSPENDED CEILING SYSTEM" BY "USG
CO." USE'DGLW-26" HEAVY DUTY MAIN TEES @ 4'-0" O.C.,
"DGLW-424" CROSS TEES @ 16" O.C., "DGWM-24" MOLDINGS @
WALL SURFACES, USE 12 GA. HANGER WIRES @ 4'-0" O.C. MAX.
TAPE & SPACKLE CEILING SURFACES SMOOTH FOR RECEIPT
OF NEW THREE COAT PAINTING CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATION AND RELOCATION OF ALL
EXISTING SPRINKLER HEADS AND ELECTRICAL SYSTEMS, AND
FOR INSTALLATION OF ALL NEW LIGHTING IN ACCORDANCE
WITH LAY-OUT SHOWN IN DRAWINGS. CONTRACTOR SHALL
PROVIDE AND INSTALL FLUSH MOUNT, PAINTABLE ACCESS
DOORS IN CEILINGS IF NECESSARY FOR ACCESS TO
EQUIPMENT ABOVE.
9.05 PROVIDE AND INSTALL NEW 5/8" GYPSUM WALLBOARD FINISH
(& FRAMING IF NECESSARY) TO PROVIDE FLUSH, SMOOTH
WALL IN HOLES LEFT WHERE RECESSED CANS OR OTHER
LIGHT FIXTURES HAVE BEEN REMOVED. TAPE AND SPACKLE
GYP. BRD. SMOOTH TO RECEIVE NEW V.W.C. OR PAINT
SYSTEM. TYPICAL THROUGHOUT ENTIRE SCOPE OF WORK
AREA.
9.17 CONTRACTOR SHALL FURNISH & INSTALL NEW 2 x 2 ACOUSTICAL
TILE CEILING SYSTEM BY "ARMSTRONG". COORDINATE INSTALLATION
OF NEW CEILINGS WITH LIGHT FIXTURES & ALL OTHER CEILING
ELEMENTS, INCLUDING BUT NOT LIMITED TO SPEAKERS, LOUVERS,
GRILLES, ALARMS, SPRWKLER HEADS, ETC. USE 9116" GRID ,
CONTINUOUS WALL ANGLE SUPPORT TRIM @ ENTIRE CEILING,
WHITE, 1"ACOUSTICAL LAY-IN TILES "CALLA, SQUARE TEGULAR,
SMOOTH TEXTURE, ITEM NO. 2824, SILHOUETTE XL 1/8" REVEAL
SUSPENSION SYSTEM", & WIRE HANGERS ON 2'-0" CENTERS
(LENGTHS AS REQ.).
9.50 CLEAN AND TOUCH UP STAIN ALL WOOD FINISH DOORS, EXISITNG
WOOD MILLWORK, WOOD PIERS, WOOD BASE AND WOOD TRIM
SURFACES TO PROVIDE NICK & SCRATCH FREE, CONSISTENT STAIN
COLOR AND TONE SURFACES, TREATMENT NOT TO EXCEED 50 % OF
ALL SURFACES. TREAT ALL SURFACES WITH LIGHT MINERAL SPIRIT
SOLVENT TO REMOVE DIRT, DUST AND GREASE. ALLOW DOORS TO
DRY, AND LIGHTLY SAND WITH "FINAL STRIPPWG PADS", CLEAN
RESIDUE WITH "TACK CLOTH". TOUCH UP DOOR SURFACES AND
EDGES WITH MATCHING STAIN COLOR. FILL NICKS AND DENTS WITH
MATCHING WOOD PUTTY, SMOOTHED AND SANDED TO BE FLUSH.
APPLY A COAT OF CLEAR SATIN MINWAX "POLYACRYLIC PROTECTIVE
FINISH" USE A FOAM APPLICATOR TYPE BRUSH, ALLOW 8 HOURS TO
DRY. DOOR LEVER HARDWARE TO REMAIN IN PLACE DURING
REFINISHING, PROTECT DOOR HARDWARE FROM RECEIVING STAIN
OR FINISH.
9.51 CLEAN EXISTING REFLECTORS & TRIMS ON ALL EXISTING RECESSED
CAN LIGHT FIXTURES TO REMAIN. CLEAN FREE OF DUST & GREASE
WITH NON-SOLVENT BASED CLEANER.
9.52 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH
COATS) TO ALL GYP. BRD. I PLASTER FINISH CEILINGS (SEE FINISH
SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR I INSTALLER
SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS
PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING
SYSTEMS.
9.57 APPLY NEW THREE COAT "SPECIALITY" PAINTING SYSTEM (PRIMER &
TWO FINISH COATS) TO GYP. BRD. / PLASTER FINISH CEILINGS,
SOFFITS, AND BULKHEADS AS INDICATED ON DRAWINGS (SEE FINISH
SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR SHALL ADHERE
TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY PAINT
MANUFACTURER FOR APPLICATION OF PAINTWG SYSTEMS AND
SHALL USE AUTHORIZED INSTALLER AS APPROVED BY PAINT
MANUFACTURER.
9.58 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH
COATS) TO ALL ALREADY PAINTED GYP. BRD. / PLASTER FINISH
WALLS, SOFFITS, & BULKHEADS (SEE FINISH SCHEDULE FOR COLORS
AND SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT
INC." FOR APPLICATION OF PAINTING SYSTEMS.
11:EQUIPMENT
11.06 CONTRACTOR SHALL PROVIDE & INSTALL NEW CEILING MOUNTED
AN PROJECTOR WHERE INDICATED ON I.D. DRAWINGS.
16: ELECTRICAL / LIGHTING
16.01 PROVIDE & INSTALL NEW OUTLETS AND COVER PLATES AT ALL
POWER , GFI, DATA, SWITCHING & DIMMER OUTLETS, AND PHONE
JACKS. COLOR TO BE WHITE.
16.05 CONTRACTOR SHALL PROVIDE & WSTALL ALL LIGHTWG NOT
PURCHASED "BY OWNER" IN ACCORDANCE WITH LIGHT FIXTURE
SCHEDULE (SEE ELECTRICAL DRAWINGS). CONTRACTOR SHALL
COORDINATE INSTALLATION WITH NEW CEILINGS, DUCTWORK,
GRILLES, AN EQUIPMENT, AND ALL OTHER CEILING ELEMENTS.
CONTRACTOR SHALL VERIFY COMPATIBILITY OF ALL FIXTURES WITH
PROPOSED CEILING TYPE (GYP. BRD., A.T.C., ETC.), AND SHALL
PROVIDE ALL NECESSARY STRUCTURAL SUPPORTS / BLOCKING TO
SUPPORT LIGHT FIXTURES.
16.06 CONTRACTOR SHALL INSTALL ALL "OWNER PROVIDED" DECORATIVE
LIGHTING IN ACCORDANCE WITH LIGHT FIXTURE SCHEDULE AND I OR
FF&E SPECIFICATION MANUAL (SEE ELECTRICAL DRAWMGS AS
WELL). CONTRACTOR SHALL COORDINATE INSTALLATION WITH NEW
CEILWGS, DUCTWORK, GRILLES, AIV EQUIPMENT, AND ALL OTHER
CEILWG ELEMENTS. CONTRACTOR SHALL VERIFY COMPATIBILITY OF
ALL FIXTURES WITH PROPOSED CEILING TYPE (GYP. BRD., A.T.C.,
ETC.), AND SHALL PROVIDE ALL NECESSARY STRUCTURAL
SUPPORTS I BLOCKING TO SUPPORT DECORATIVE FIXTURES
(WEIGHTS TO BE PROVIDED BY FABRICATORS).
16.10 CONTRACTOR SHALL PROVIDE & INSTALL NEW TRACK LIGHT FIXTURE
IN ACCORDANCE WITH LIGHT FIXTURE SCHEDULE (SEE ELECTRICAL
DRAWINGS). CONTRACTOR SHALL COORDINATE INSTALLATION WITH
NEW CEILWGS, DUCTWORK, GRILLES, AIV EQUIPMENT, AND ALL
OTHER CEILING ELEMENTS. CONTRACTOR SHALL VERIFY
COMPATIBILITY OF ALL FIXTURES WITH PROPOSED CEILING TYPE
(GYP. BRD., A.T.C., ETC.), AND SHALL PROVIDE ALL NECESSARY
STRUCTURAL SUPPORTS / BLOCKING TO SUPPORT LIGHT FIXTURES.
NOTES (TYPICAL IN ALL SCOPE OF WORK):
9.50 9.52 9.58 16.01
Q
L
�
d � � m n
O - � a
� N o� �'_
y
f� � `.
cousu�,nrv,s
N
T
�
�
v
❑�
d' 9
O =
U "_
W c°�
� �
w
O d
c
. R
W C R N
wwa�
Z �=m
� .�. a�o
Z � E �
WNi�=
�
��
J (n
FQ�M
OzQ�
UQ�Z
Zp�
J
�z�w
c�=��
z�rna
wO�U
�z�
w
U
z
� Q J
cn w
��
0
¢�
�
ARCHITEQ'S SEAL
5 � SN' ��'�.
�.����y.P ......... ;qNJ� �.
` �o.; pEGs.e.eeo •. o ;
= i No '�=
* : ARr1�00�82 .: * _
aE�EASEOFoa�
❑ PRELIMINARY ONLY
❑ aioowc
�PEamirs
❑ CONSTROLTION
onre. osavmzo
PROJECT NO.-595P
�RNWM LW
oesi�rven �w
CHECM TBD
sHEErnr�e
NEW CONSTRUCTION
ENLARGEDLOBBVLEVEL
REFLECTE� CEILING PLAN-
LOBBV & RESTROOMS
S�EE,�A 204
� 2 NEW CONSTRUCTION ENLARGED LOBBY LEVEL REFLECTED CEILWG PLAN- RESTROOMS
2�4 SCALE:1/2" = 1'-0" � : N.I.C. �
�