HomeMy WebLinkAboutA-206 - NEW CONST ENLARGED LOBBY LEVEL RCP - MEETING ROOM & POOL�
� � �
25 �
� RESTROOM I ... . . . . . . .. . .
�
� � � � � II � o
O O � . A �. � ,'.
�� o l
O O LJ,L� I��;�� r o
.. � i � B � � O � �
W 26 S � � �
� � RESTR�M � � �
`.O.
O
O
` O
I� o o �� o�
�
o � �
� � u � u � �
�
o ❑ o ❑ o ❑ o
24
ROOM
0 0
� I I � I I � I I �
u u u
�
� o � o � o �
0
�
�
0
/
0 0
o O
0 0
� .: � � ��. 0 0 0
� � ❑ ❑ � �. ...
0
�
RT ESS
CE TER
� � � � �
9.17 �
6.07
� � ( YP.)
� ��.�
(TY J �
� � � � �
❑ ❑ ❑ NI$EX
0
0 17B
RESTRO M
0
�
0
NECESSARY TO COMPLETE THE PROJECT.
15. THE CONTRACTOR SHALL CLEAN SITE AFTER CONSTRUCTION IN A
MANNER CONSISTENT WITH THE CONDITIONS THAT EXISTED PRIOR :�: o o �.
TO CONSTRUCTION.
16. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE CONDITIONS OF
EXISTING MATERIALS THAT ARE TO BE REMOVED OR DEMOLISHED.
NEW WORK PLAN NOTES
9: PAINTING AND STAINING FINISHES
9.02 PROVIDE NECESSARY MATERIALS AND CONSTRUCT NEW 5/8"
GYPSUM WALLBOARD BULKHEAD. USE 3 5/8" MTL. STUD
FRAMING SYSTEM, MIN. 24 GA., FRAMING TO BE 16" O.C. MAX.
EXTEND FRAMING ABOVE CEILING & ANCHOR TO STRUCTURE
ABOVE WITH CLIP ANGLES SET INTO SLAB WITH POWDER
DRIVEN FASTENERS. TAPE AND SPACKLE BULKHEAD SMOOTH
TO RECEIVE NEW THREE COAT PAINT SYSTEM. PROVIDE &
INSTALL CONT. CORNER BEADS AT ALL EXTERIOR GYP. BRD.
CORNERS, TAPE ALL JOINTS BETWEEN GYP. BRD. PANELS,
SKIM COAT ALL GYP. BRD. SURFACES TP PROVIDE FLUSH,
SMOOTH, CRACK FREE SUBSTRATE (SEE FINISH INDEX FOR
FINISH MATERIAL). AREAS TO INCLUDE ALL GYP. BRD. WALLS,
CEILINGS AND BULKHEADS. COMPLY WITH ASTM C587. USE
"DIAMOND FINISH PLASTER" BY US GYPSUM CO. (312-321-4000)
OR EQUAL.
� 1 NEW CONSTRUCTION ENLARGED LOBBY LEVEL REFLECTED CEILING PLAN- MEETING ROOM & POOL
� SCALE:1/4" = 1'-0"
GENERAL NOTES FOR NEW WORK NOTIFY THE OWNER OF TYPE, LOCATION, AND EXTENT OF SAME.
1. ALL WORK SHALL BE DONE IN WORKMAN LIKE MANNER AND W $� ALL ELECTRIC AND MECHANICAL WORK SHALL BE PROVIDED BY
CONFORMANCE WITH MANUFACTURER'S INSTALLATION AND PERSONNEL LICENSED IN THE STATE OF INDIANA IN ACCORDANCE
WARRANTY REQUIREMENTS. WITH ALL LOCAL, STATE, AND FEDERAL CODES.
2. ALL WORK TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE 9� THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS,
LOCAL, STATE, AND FEDERAL AUTHORITIES, RULES, REGULATIONS & REQUIRED BY ALL AGENCIES AND AUTHORITIES HAVING
CODES. JURISDICTION FOR THE WORK INCLUDED IN THIS CONTRACT. PERMIT
3. ALL DIMENSIONS AND FIELD CONDITIONS SHALL BE VERIFIED. ANY SHALL BE CONSPICUOUSLY POSTED AT JOB SITE.
DISCREPANCIES IN DIMENSIONS, CONDITIONS, OR DOCUMENTS 10. THE CONTRACTOR IS SPECIFICALLY RESPONSIBLE FOR ALL MEANS
SHALL BE BROUGHT IMMEDIATELY TO THE ARCHITECT'S ATTENTION. AND METHODS OF JOB SITE SAFETY.
4. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO � 1. CONTRACTOR SHALL ENSURE THAT NUMBER NOTES ARE READ IN
PROTECT ALL EXISTING MATERIALS, SURFACES, & EQUIPMENT TO CONJUNCTION WITH A NUMBER NOTE EXPLANATION, I.E., EACH
REMAIN. SHEET SHOULD NOT BE READ IN ISOLATION BY THE CONTRACTOR'S
5. CONTRACTOR SHALL BE LIABLE FOR, AND TAKE ALL PRECAUTIONS VJORKMEN OR HIS SUBCONTRACTORS.
NECESSARY TO PROTECT ALL EQUIPMENT AND BUILDING FROM 12. ANY CONFLICTS IN THE DRAWINGS OR SPECIFICATIONS, OR BETWEEN
DUST, VIBRATIONS AND WATER DAMAGE. DRAWINGS AND SPECIFICATIONS, SHALL BE BROUGHT TO THE
6. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED IMMEDIATE ATTENTION OF THE ARCHITECT. THE CONTRACTOR
TO THE ARCHITECT AND OWNER PRIOR TO PROCEEDING WITH WORK. SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION OF
7. REMOVE ALL DEBRIS PROPERLY FROM SITE. ALL DEMOLISHED CONFLICTS IS RECEIVED FROM THE ARCHITECT.
MATERIAL, EXCEPT THAT LISTED OR MARKED BY ARCHITECT FOR 13. ALL EXISTING RATED WALLS, FLOORS, CEILINGS, OR SHAFTS MUST BE
----' '-�PERTY OF THE CONTRACTOR. MAINTAINED THROUGHOUT NEW CONSTRUCTION, AND ANY
RELEA5E0 FOR CONSTRUCTION fLY ON TRUCKS OR INTO PENETRATIONS OR INTERRUPTIONS MADE TO THESE RATED
°Rr�� ALLY. DO NOT BURN ON SITE. SYSTEMS MUST BE REPAIRED TO MAINTAIN RATING.
p, Suhjecuocompliancewithall regula�ions 14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL
o4S�a�eantlLocalCodes WERS OR ROOF DRAINS. DO TRADES, FOR COORDINATION OF ALL TESTING AND INSPECTIONS
' Ci ofCarmel fRUCTURE, BLOCK EXITS, OR
� �� � h NECESSARY, AND FOR DELNERY & STORAGE OF ALL MATERIALS
� � �:,,y� , :`�-1 IY HAZARDOUS MATERIALS,
'a �m��-;� � �,u�v3il�C
10.0.���
DATE: 06�30�20
.. � '. " .. � . . .. .. . . .. �._.. u ' _ . .
� ��- '� '� o 0 0 0 0 0 0 0 0 -
� o 0 0 �' o ��� o - �..:..o -�� o :: o � . �
_ . �.. CORRID R
� � � - . " � � o o - o 0 0 � o 0 0 0 �
� � ���� � ��� � � ��� � .;-. . -. �p � I ��. I I .."I �'�� nnn .'.. .. .. � _; .. :. � .:....
U
� o CUKItIU Ko
17
0
o �s o
0
0
0 0
0
�
0 0
0
� o � o
� ..��'. �
���
AD 91N.
)
H H 9.02�
0 16.06 0 12.05-
16.05 (TYPJ
M1� (TYP.)
10'-� 16.06
4� (TYP.)�
0�9.03 0
4� � 9.02 <
� � �
� 9.03 ° �
�I(.
4� �16.06 (T`
(TYP.)
9'-�
o a ro o
C2U�B
LOUNGFiy ro�9.p3 .Ob
10'-� 0"AFF YP
o m ro,, 1(.OS o
� (TYP J
9 _��
16.05
(TYPJ 12.05-
o � o
�
0 0 9.02 -
L6.06 �9.03
�TYPJ 9.52
0 957� o 0
0 0 16.06
(TYP.)
10'-�
� � � �
� �
O
0 0 16.06
9 4
� �
o Os o
O
�
� : N.I.C. �
�
9.03 FURNISH & INSTALL NEW "NON-SAG" 5l8" TAPERED EDGE,
GYPSUM WALLBOARD"SUSPENDED CEILWG SYSTEM"BY
' USG CO." USE "DGLW-26" HEAVY DUTY MAIN TEES @ 4'-0"
O.C., "DGLW-424" CROSS TEES @ 16" O.C.,'DGWM-24"
MOLDINGS @ WALL SURFACES, USE 12 GA. HANGER WIRES @
4'-0" O.C. MAX. TAPE & SPACKLE CEILING SURFACES SMOOTH
FOR RECEIPT OF NEW THREE COAT PAINTING CONTRACTOR
SHALL BE RESPONSIBLE FOR COORDINATION AND
RELOCATION OF ALL EXISTING SPRINKLER HEADS AND
ELECTRICAL SYSTEMS, AND FOR INSTALLATION OF ALL NEW
LIGHTING IN ACCORDANCE WITH LAY-OUT SHOWN IN
DRAWINGS. CONTRACTOR SHALL PROVIDE AND INSTALL
FLUSH MOUNT, PAINTABLE ACCESS DOORS IN CEILINGS IF
NECESSARY FORACCESS TO EQUIPMENT ABOVE.
9.17 CONTRACTOR SHALL FURNISH & INSTALL NEW 2 x 2
ACOUSTICAL TILE CEILWG SYSTEM BY "ARMSTRONG".
COORDINATE INSTALLATION OF NEW CEILINGS WITH
LIGHT FIXTURES & ALL OTHER CEILWG ELEMENTS, INCLUDING
BUT NOT LIMITED TO SPEAKERS, LOUVERS, GRILLES,
ALARMS, SPRINKLER HEADS, ETC. USE 9/16" GRID,
CONTINUOUS WALL ANGLE SUPPORT TRIM @ ENTIRE
CEILING, WHITE, 1"ACOUSTICAL LAY-IN TILES "CALLA ,
SQUARE TEGULAR, SMOOTH TEXTURE, ITEM NO. 2824,
SILHOUETTE XL 1/8" REVEAL SUSPENSION SYSTEM", & WIRE
I HANGERS ON 2'-0" CENTERS ( LENGTHS AS REQ. ).
9.50 CLEAN AND TOUCH UP STAIN ALL WOOD FINISH DOORS,
EXISITNG WOOD MILLWORK, WOOD PIERS, WOOD BASE AND
WOOD TRIM SURFACES TO PROVIDE NICK & SCRATCH FREE,
CONSISTENT STAIN COLOR AND TONE SURFACES,
TREATMENT NOT TO EXCEED 50°/ OF ALL SURFACES. TREAT
ALL SURFACES WITH LIGHT MINERAL SPIRIT SOLVENT TO
REMOVE DIRT, DUST AND GREASE. ALLOW DOORS TO DRY,
� AND LIGHTLY SAND WITH "FINAL STRIPPING PADS", CLEAN
RESIDUE WITH "TACK CLOTH". TOUCH UP DOOR SURFACES
AND EDGES WITH MATCHING STAIN COLOR. FILL NICKS AND
DENTS WITH MATCHING WOOD PUTTY, SMOOTHED AND
SANDED TO BE FLUSH. APPLY A COAT OF CLEAR SATIN
MINWAX "POLYACRYLIC PROTECTIVE FINISH" USE A FOAM
APPLICATOR TYPE BRUSH, ALLOW 8 HOURS TO DRY. DOOR
LEVER HARDWARE TO REMAIN IN PLACE DURING
I REFINISHING, PROTECT DOOR HARDWARE FROM RECEIVING
STAIN OR FINISH.
9.52 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO
FINISH COATS) TO ALL GYP. BRD. / PLASTER FINISH CEILWGS
(SEE FINISH SCHEDULE FOR COLORS AND SHEEN).
CONTRACTOR / INSTALLER SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY
I "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS.
9.57 APPLY NEW THREE COAT "SPECIALITY" PAINTING SYSTEM
(PRIMER & TWO FINISH COATS) TO GYP. BRD. / PLASTER
FINISH CEILINGS, SOFFITS, AND BULKHEADS AS INDICATED
ON DRAWINGS (SEE FINISH SCHEDULE FOR COLORS AND
SHEEN). CONTRACTOR SHALL ADHERE TO ALL
SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY PAINT
MANUFACTURER FOR APPLICATION OF PAINTING SYSTEMS
� AND SHALL USE AUTHORIZED INSTALLER AS APPROVED BY
PAINT MANUFACTURER.
9.58 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER 8 TWO
FINISH COATS) TO ALL ALREADY PAINTED GYP. BRD. /
PLASTER FINISH WALLS, SOFFITS, & BULKHEADS (SEE FINISH
SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR /
INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR
I INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR
APPLICATION OF PAINTING SYSTEMS.
12: FURNISHINGS & FF&E
1205 CONTRACTOR SHALL WSTALL OWNER-PROVIDED ROLLER
SHADE WITH BLACKOUT AND SHEER SHADES WITH SIDE
TRACKS, AND ALL ASSOCIATED HARDWARE, BY OWNER.
CONTRACTOR TO CONFIRM ADEQUATE SUPPORT BLOCKING
BEFORE INSTALLATION OF WINDOW SHADES. INSTALL
� SHADES PER MANUFACTURERS INSTALLATION
INSTRUCTIONS.
16: ELECTRICAL / LIGHTWG
16.01 PROVIDE & INSTALL NEW OUTLETS AND COVER PLATES AT
ALL POWER , GFI, DATA, SWITCHING & DIMMER OUTLETS,
AND PHONE JACKS. COLOR TO BE WHITE.
I 16.05 CONTRACTOR SHALL PROVIDE & INSTALL ALL LIGHTING NOT
PURCHASED "BY OWNER" IN ACCORDANCE WITH LIGHT
FIXTURE SCHEDULE (SEE ELECTRICAL DRAWINGS).
CONTRACTOR SHALL COORDINATE INSTALLATION WITH NEW
CEILINGS, DUCTWORK, GRILLES, A/V EQUIPMENT, AND ALL
OTHER CEILING ELEMENTS. CONTRACTOR SHALL VERIFY
COMPATIBILITY OF ALL FIXTURES WITH PROPOSED CEILING
TYPE (GYP. BRD., A.T.C., ETC.), AND SHALL PROVIDE ALL
NECESSARY STRUCTURAL SUPPORTS / BLOCKING TO
SUPPORT LIGHT FIXTURES.
16.06 CONTRACTOR SHALL INSTALL ALL "OWNER PROVIDED"
DECORATIVE LIGHTING IN ACCORDANCE WITH LIGHT FIXTURE
SCHEDULE AND / OR FF&E SPECIFICATION MANUAL (SEE
ELECTRICAL DRAWINGS AS WELL). CONTRACTOR SHALL
COORDINATE INSTALLATION WITH NEW CEILINGS,
DUCTWORK, GRILLES, NV EQUIPMENT, AND ALL OTHER
CEILING ELEMENTS. CONTRACTOR SHALL VERIFY
COMPATIBILITY OF ALL FIXTURES WITH PROPOSED CEILING
TYPE (GYP. BRD., A.T.C., ETC.), AND SHALL PROVIDE ALL
NECESSARY STRUCTURAL SUPPORTS / BLOCKWG TO
SUPPORT DECORATIVE FIXTURES (WEIGHTS TO BE PROVIDED
BY FABRICATORS).
16.07 CONTRACTOR SHALL RE-INSTALL ALL LIGHT FIXTURES
TEMPORARILY REMOVED OR RELOCATED IN ORDER TO
PROVIDE SPACE TO CONSTRUCT NEW WORK, IN
ACCORDANCE WITH NEW CONSTRUCTION DRAWINGS.
CONTRACTOR SHALL COORDINATE RE-INSTALLATION WITH
NEW AND EXISTING CEILINGS, DUCTWORK, GRILLES, A/V
EQUIPMENT, AND ALL OTHER EXISTING AND / OR NEW
CEILING ELEMENTS.
17: COATING SYSTEMS (PER SHERWIN WILLIAMS SYSTEMS)
17.09 SUBSTRATE - 9: ACOUSTICAL TILE GRIDS (FACTORY FINISH) - FLAT.
CLEAN AND REMOVE GREASE PRIOR TO APPLICATION.
PRIMER: DTM ACRYLIC PRIMER / FINISH B66W1. TOP COAT:
DTM ACRYLIC PRIMER / FINISH B66W1.
NOTES (TYPICAL IN ALL SCOPE OF WORK):
9.50 9.52 9.58 16.01
a
� -
d � � � a
0 ��a
;O N oU' �'�
a�+ -
y_,�_.-;
�a�s��,A�,s
u
� c
��
O =
U "_
W c°�
�m
w=
O `a
a
c
m
� W C R N
W w 'v �
Z � C N
> ^ O�
� a �
� "E^
Z � �
WNU=
3 �
� O
� �
J (�
F��M
OZQ7
UQOZ
Zp��
v¢iZgw
l�=��
Z�ma
wO�U
�Z�
w
u
Q �
�i cn w
r�.� Q o
x
Z
W
K
ARCHRECi55EHL
����„� �� 5��„
'�o�;:� ��s:ERew;Nsz ;
= i No "
* : AR11800182 : * _
_ v. SU�S aF : c
aE�EnsEOFoa�
❑ PRELIMINARY ONLY
❑eiooiNc
� PERMITS
❑CONSTROQION
onre o3i3v�ozo
PROJEQ NO.: 5952
ORPWN' LW
oesi�rveo� �w
cneck-.rao
SHEETTITLE�
NEW 60NSTRUCTION
ENLARGEDLOBBYLEVEL
REFLECTE� CEILING PLAN-
MEETMG ROOM & PWL