Loading...
HomeMy WebLinkAboutA-ID-7-00 - PUBLIC AREA ELEVATIONS - NOTESNEW WORK ELEVATION NOTES 6: FABRICATIONS 6.04 NEW MILLWORK APPLICATION ON TRANSACTION SIDE OF EXISTING RECEPTION DESK MILLWORK. SEE MILLWORK DRAWINGS A.7XX SERIES 6.07 ::�iT'.i 6.13 6.15 6.31 6.32 NEW DIVIDER SCREEN MILLWORK. SEE MILLWORK DRAWING A.7XX SERIES. NEW DIVIDER SCREEN & COUNTER MILLWORK. SEE MILLWORK DRAWING A.7XX SERIES. ADAPTATION OF EXISTING HOST STATION MILLWORK. ADAPTATION OF EXISTING MILLWORK COUNTERS. NEW WALL TRIMS. SEE MILLWORK DRAWING A.7XX SERIES. ADAPTATION OF EXISTING COFFEE GRAB & GO STATION. �'Ay1�169714.Y:����k1��y:7fl �I@[H 9.09 CONTRACTOR SHALL PROVIDE AND INSTALL NEW WALL TILE. THINSET TILES TO SUBSTRATE, GROUT AND COMPACT ALL JOINTS FULL WITH SANDED EPDXY GROUT. MAXIMUN JOINT SIZE TO BE 1I8". SUBMIT GROUT COLOR SAMPLES FOR APPROVAL BY DESIGNER (MAPEI OR EQ.). CLEAN ALL HAZE AND GROUT FROM TILE SURFACE WITH APPROVED CLEANER. 9: PAINTING AND STAINING FINISHES 9.50 CLEAN AND TOUCH UP STAIN ALL WOOD FINISH DOORS, EXISITNG WOOD MILLWORK, WOOD PIERS, WOOD BASE AND WOOD TRIM SURFACES TO PROVIDE NICK & SCRATCH FREE, CONSISTENT STAIN COLOR AND TONE SURFACES, TREATMENT NOT TO EXCEED 50 % OF ALL SURFACES. TREAT ALL SURFACES WITH LIGHT MINERAL SPIRIT SOLVENT TO REMOVE DIRT, DUST AND GREASE. ALLOW DOORS TO DRY, AND LIGHTLY SAND WITH "FINAL STRIPPING PADS", CLEAN RESIDUE WITH "TACK CLOTH". TOUCH UP DOOR SURFACES AND EDGES WITH MATCHING STAIN COLOR. FILL NICKS AND DENTS WITH MATCHING WOOD PUTTY, SMOOTHED AND SANDED TO BE FLUSH. APPLY A COAT OF CLEAR SATIN MINWAX "POLYACRYLIC PROTECTIVE FINISH" USE A FOAM APPLICATOR TYPE BRUSH, ALLOW 8 HOURS TO DRY. DOOR LEVER HARDWARE TO REMAIN IN PLACE DURING REFINISHING, PROTECT DOOR HARDWARE FROM RECEIVING STAIN OR FINISH. 9.52 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL GYP. BRD. I PLASTER FINISH CEILINGS (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR I INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT WC." FOR APPLICATION OF PAINTING SYSTEMS. 9.58 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL ALREADY PAINTED GYP. BRD. / PLASTER FINISH WALLS, SOFFITS, & BULKHEADS (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 9.60 APPLY NEW THREE COAT PAINTING SYSTEM (PRIMER & TWO FINISH COATS) TO ALL EXISTING LOW WALLS AT RESTAURANT BANQUETTES (SEE FINISH SCHEDULE FOR COLORS AND SHEEN). CONTRACTOR / INSTALLER SHALL ADHERE TO ALL SPECIFICATIONS FOR INSTALLATION AS PROVIDED BY "MARRIOTT INC." FOR APPLICATION OF PAINTING SYSTEMS. 12: FURNISHINGS & FF&E 12.01 CONTRACTOR SHALL ASSIST PROPERTY IN INSTALLATION OF ALL OWNER PROVIDED FF&E ITEMS. 12.02 CONTRACTOR SHALL INSTALL OWNER PROVIDED WALL MOUNTED FRAMED MIRRORS & ARTWORK WITH HARDWARE & SECURITY ANCHORS PROVIDED BY ARTWORWMIRROR SUPPLIER. LOCATIONS TO BE AS PER DRAWINGS, TO BE VERIFIED IN FIELD WITH DIRECTION BY DESIGNER. CONTRACTOR SHALL VERIFY AND INSURE THAT ADEQUATE BLOCKING AND SUPPORT BE PROVIDED FOR ALL ITEMS BEING HUNG FROM WALLS. 16: ELECTRICAL / LIGHTING 16.01 PROVIDE & INSTALL NEW OUTLETS AND COVER PLATES AT ALL POWER , GFI, DATA, SWITCH WG & DIMMER OUTLETS, AND PHONE JACKS. COLOR TO BE WHITE. 16.06 CONTRACTOR SHALL INSTALL ALL "OWNER PROVIDED" DECORATIVE LIGHTING IN ACCORDANCE WITH LIGHT FIXTURE SCHEDULE AND / OR FF&E SPECIFICATION MANUAL (SEE ELECTRICAL DRAWINGS AS WELL). CONTRACTOR SHALL COORDINATE INSTALLATION WITH NEW CEILINGS, DUCTWORK, GRILLES, AIV EQUIPMENT, AND ALL OTHER CEILING ELEMENTS. CONTRACTOR SHALL VERIFY COMPATIBILITY OF ALL FIXTURES WITH PROPOSED CEILING TYPE (GYP. BRD., A.T.C., ETC.), AND SHALL PROVIDE ALL NECESSARY STRUCTURAL SUPPORTS / BLOCKING TO SUPPORT DECORATIVE FIXTURES (WEIGHTS TO BE PROVIDED BY FABRICATORS). RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel `�y,:a���'.�`� �,�:;vaYa/„1��. DATE: 06�30�20 Q L N a� - � a � � � a Q _ � o .� °'o��� 7 (n . �� ..: -r .. coNsu�r�rvrs v � c � !°. �� U" C �/� 0 �/ ! d' m c � � a W� ` '° N WCRN W �yJ w 'y o Z qc�ri Z °' a e �� 2::n IL N � ."'. J 6�.d � �� � J (n �Q�M OaZo WZa� UQ�Z ZpK J �z�w (�_�� WO�U �Z� w U Z � Q J cn w �� Q o Z w � ARCHITEQ'S SEAL J g�yq'�•,� sicREa ;NJ'o' 1 Z oEscAiP.io�+ aE�EnsEOFoa� ❑ PRELIMINARY ONLY ❑ 81�OING �4ERMITS ❑ CONSTROCTION �ATE�.00/192W0 PROJECT NO: 5352 orenww �w oesi�rven �w CHECK-TBD SHEETTITLE' ELEVATION NOTES SHEET NO[ I D-7.00