Loading...
HomeMy WebLinkAboutM-002 - MECHANICAL -NOTES AND SCHEDULESRELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel r �un��V l�rc�alols�. i DATE: OF)�30�20 PLUMBING GENERAL NOTES: 1. ALLWORKSHALLCONFORMTOTHEINTERNATIONALPLUMBINGCODE-2015EDITIONAN� ALL LOCAL CODES, RULES AND REGULATIONS INCLUDING THE AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY GUIDELINES, OSHA ACTS AN� REGULATIONS, AND THE RE�UIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION. 2. THE CONTRACTOR SHALL OBTAIN ALL PERMITS. FEES, ANO LICENSES, ETC. REQUIRED TO PERFORM THE WORK. THE CONTRAGTOR SHALL FURNISH AN� WSTALL NLL LABOR, MATERIALANDEQUIPMENTTOPROVIDECOMPLETEANDOPERABLESYSTEMS. THE WORK SHALL INCLUDE ANV INCIDENTAL ACCESSORIES NECESSARYTO MAKE THE WORK COMPLETE IN ALL RESPECTS AND REA�Y FOR OPERATION. 3. WORKSHALLCONFORMTOSTANDARDINDl15TRYPRACTICES.ROl1TINGOFALLPIPING AS SHOWN ON THE DRAWINGS IS DIAGRAMMATIC ONLY. INTENDING TO SHOW GENERAL Rl1NS AND LOCATIONS OF PIPING, FIXTl1RE5 AND SPECIALTIES. IT IS NOTTHE IMENT OF THESE DOCUMENTS TO INDICATE ALL OFFSETS AND FITTINGS REQUIRED. GENERALLY, PIPING SHALL BE WSTALLED PARALLEL WITH OR PERPENDICULAR TO WALL CONSTRUCTION. SUPPLV SVSTEMS SHALL BE INSTALLED LEVEL AND PLUMB, GRAVITY SYSTEMS SHALL BE INSTqLLED WITH A UNIFORM SLOPE. 4. ALL PIPING SHOWN ON PLANS OR IN�ICATE� BV NOTES SHALL BE CONCEALED ABOVE THE CEILING, LOCATE� BELOW THE FINISH FLOOR OR WNCEALE� IN WALLS OR CHASES, UNLESS NOTED OTHERWISE. 5. THECONTRACTORSHALLVERIFYALLCONDITIONSBEFORESTARTINGTHEWORKAND SHALL NOTIFY THE ARCHITECT IF A CONDITION EXISTS WHICH PREVENTS THE GONTRACTOR FROM FCCOMPLISHING THE INTENT OF THE DRAWINGS. FAILURE TO NOTIFY THE ARCHITECT IN A TIMELY MANNER SHALL MEAN THE CONTRACTOR HAS PROCEEDED AT HIS OWN EXPENSE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF THE PLUMBING WORK WITH ALL OTHER TRAOES, INC W DING STRUCTURAL, MECHANICAL, AND ELECTRICAL WORK. THE CONTRACTOR SHALL PROVIDE NECESSARY OFFSETS, TRANSITIONS, PIPE ROUTING, MATERIALS AND LABOR TO ARRANGE EQIIIPMENT AND PIPING AS REQUIRED FOR A PROPER AND ACCESSIBLE INSTALLATION WITH MINIMAL CONFLICT. CLOSE COORDINATION WILL BE RE�UIRED FOR ALL SERVICES. 7. DO NOT LOCATE PW MBING PIPINQ EQIIIPMENT, ETC., WER ELECTRICAL PANELS. 8. MATERIALS USED SHALL BE NEW ANO FlRST RATE IN QIIALITV. CARE SHALL BE TAKEN WITH THE HANDLING AND SETTING OF ALL E�UIPMENT AND MATERIALS. ALL WORK SHALL BE FREE FROM DEFECTS. 9. REFERENCETHEARCHITECTURALDRAWINGSFORDIMENSIONE�LOCATIONSOFWALLS, PARTITIONS, PLUMBING FI%TURES AN� FOR PARTITION THICKNE55 AND CONSTRUCTION MATERIALS. DRAWINGS SHALL NOT BE SCALED. 70. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVMG SCRAP MATERIALS AND DEBRIS ASSOCIATED WITH THIS WORK FROM THE SITE. 11. PROVIDEFINALCONNECTIONSTOALLEQUIPMENTFURNISHEDBVTHEOWNERAND/OR OTHERS. 72. PROVIDE ACCESS PANELS PoR ALL ITEMS REQIIIRING ACCESS OR MAIMENANCE WGLUDING SHUT-OFF VALVES, WATER HAMMER ARRESTORS, BALANCING VALVES, ETC. 13. ALL PIPING AND MATERINLS USED IN A PLENUM SPNCE SHALL BE PLENUM RATED. THE CONTRACTOR SHALL FlELD VERIFY EXTENT OF THE AREAS THAT ARE PLENUMS. 14. PIPE SIZES INDICATED ARE MINIMUM. IF A PIPING MATERIAL IS NOT MANUFACTURED OR OTHERWISE AVAILABLE IN THE SIZE INDICATED THEN THE NEXT L4RGER PIPE SIZE SHALL BE PROVIDED AND INSTALLED. 75. ALL EXPOSED WATER PIPING AND P-TRAPS SUBJECT TO FREEZING SHALL BE PROTECTED BV INSULATION AND HEAT TAPE. i6. CONTRACTORSHALLPROVIDECOORDINATIONDRAWINGS(MM.il4"SCALE)BEFORE COMMENCE THEIR WORK. COORDINATION DRAWMGS SHALL INCW�E, BUT NOT LIMRED T0. DUGTWORK, PIPING, WNDUITS LARGER THAN 2". E�UIPMENT, DEVICES THAT NEED ACCESS. ALL DIMENSIONS SHOWN SHALL BE Ol1TSIDE DIMENSIONS. SIZES AND ELEVATIONS OF TOP AND BOTTOM OF DUCTWORKIPIPES/EQUIPMENT SHALL BE CALLED OUT ON COORDINATION DRAWINGS. 77. CONTRACTORSHALLSUBMITSHOPDRAWINGS,PRODUCTDATAANDSAMPLESTOTHE ARCHITECT/ENGINEER FOR APPROVAL. WRITTEN SUBMITTALS SHALL BE FORWARDED IN SIX (6) COPIES AND CLFARLY MARKED TO INDICATE SPECIFIC ITEM, PERFORMANCE OR CAPACITIES, SRE, COLOR AND LOCATION OF USE. ALL SUBMRTALS SHALL BE CHECKED, �ATE�,PRESENTE�AN�LFBELEDINACLEARAN�THOROUGHMANNER. SUBMITTALS SHALLINCLUOE,BUTARENOTLIMITEDTO,THEFOLLOWING: PLUMBMGFIXTURES, WSULATION. VALVES, HANGERS AND ALL PIPING AN� NCCESSORIES. ALL ITEMS LISTED ON DRAWINGS AND/OR IN SPEQFlCATIONS ARE NOT IMENDED TO PREC W DE THE USE OF OTHER PRODUGTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MODIFICATIONS, REROUTING, RELOCATION AND VARIATIONS AT NO EXTRA COST TO THE OWNER WHEN AND IF SUBSTITUTED ITEMS ARE APPROVED FOR USE. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE STATE FN� LOCAL CODES, THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THE ENVIRONMENTAL PROTECTION AGENCv (EPA) AND THE LOCAL AUTHORITIES HAVING JURIS�ICTION. PLUMBING SPECIFICATIONS: GENERAC 1. THEWORKSHALLINCWDEPROVIDINGANDINSTALLINGALLMATERIALSINDICATEDTOPROVIDE COMPLETE AND OPERABLE SYSTEMS. WORK SHALL TERMINATE AT A POINT FNE FEET FROM THE FACE OF THE BUIL�ING, UNLESS NOTED OTHERWISE AN� SHALL INCLUDE CONNECTIONS TO SITE UTILITIES. 2 PROVIDEACCESSPANELSFORALLEQUIPMENTANDMATERIALSREQIIIRINGMAINTENANCEOR INSPECTION INCLUDMG (BUT NOT LIMITED TO) VALVES, MOTORS, WATER HAMMER ARRESTORS, 3. PROVIDECUTTINGANDPATCHINGOFEXISTINGCONSTRUCTIONASREQUIREDTOINSTALLTHEWORK. 4. SUBMITTALS'.THECONTRACTORSHALLSUBMITALLPRODUCTDATAFORREVIEWANDACCEPTANCE BV THE ENGMEER. THE CONTRACTOR SHALL BE PROCEEDING AT THEIR OWN RISK IF THE CONTRACTOR CHOOSES TO PROCEED WITH THE WORK PRIOR TO ACCEPTANCE OF THE MATERIALS AND E�UIPMENT BV THE ENGINEER. PW MBING PIPING SVSTEMS' 5. REFERENCE THE PIPING MATERIAL SCHEDULE FOR PIPING MATERIALS. fi. PROVIDE INSULATION FOR PIPING AND EQl11PMENTAS FOLLOWS: DOMESTIC COLD WATER- 1" FIBERGLASS WITH ASJ DOMESTIC HOT WATER- 1" FlBERGLASS WITH ASJ HORIZONTAL RAINWATER CONDUCTORS (PRIMARV AND SECONOARY�- 1" FIBERGLASS WITH ASJ VERTICAL RAINWATER CONDl1CTORS (PRIMARY AND SECONDARY) -1" FIBERGLASS WITH ASJ ROOF DRAIN BODIES (PRIMARY AND SECONDARY) -1" FIBERGLA55 WITH FOIL FACE WASTE PIPING FROM ELECTRIC WATER COOLERS OR CONDENSATE DRAWS (FIRST 10-FEET OF DRAINAGE)- 1" FlBERGLASS WITH ASJ 7. DOMESTIC WATER SYSTEM VALVES: 2-PIECE, FULL-PORT BRASS BALL VALVES, NI8C0 S-FPLOON OR NON-RISING STEM, FULLPORT BRASS GATE VALVES, NIBCO TI-8. 8. DOMESTIC HOT WATER RETl1RN SYSTEM BALANCING VALVES: BRASS GLOBE VALVES WITH TEST PORTS, NIBCO 51710. 9. HANGERS: HANGERS, BRAGES AND RESTRAINTS SHALL ADEQUATELY SUPPORT THE SVSTEMS HORIZONTALLY AND VERTICALLY AND SHALLALLOW FOR MOVEMENT WITHOl1TTRANSMITTING STRESS OR VIBRATION TO THE STRUCTURE. HANGERS SHALL BE E�UAL TO GRINNELL PRODUCTS. HANGERS ON INSULATED PIPING SHALL BE PROVIDED WITH AN� SHALL BE SIZED TO ACCOMMODATE INSULATION INSERTS AN� HANGER SHIELDS. 10. HORIZONTALSOIL,WASTEANDVENTPIPINGHUNGFROMBUIL�INGCONSTRUCTIONSHALLBE SUPPORTED AT NOT OVER 5 FEET NEXT TO FITTINGS. PROVIDE ADDITIONAL SUPPORTS AT JOINTS, CHANGES IN DIRECTION AND ELSEWHERE AS RE�UIRED TO MAWTAIN PROPER ALIGNMENT. 11. PROVIDE ACRYLIC SNAP-ON LABELS WITH OIRECTIONAL ARROWS FOR ALL PLUMBING PIPING SYSTEMS. LABELS SHALL BE SPACED A MAXIMUM OF 25'-0" APART AND WITHIN 2'-0" OF WALL PENETRATIONS. 12 PENETR4TIONS:ALLPIPINGPENETRATIONSOFRATE�ASSEMBLIESSHALLBESEALEDIN ACW RDANCE WITH UL LISTED THROUGH PENETRATION ASSEMBLIES. PLUMBING SPECIALTIES: 1. CLEANOUTS SHALL HAVE TOPS DESIGNED FOR SPEQFIC FLOOR FINISHES IN WHICH THEYARE INSTALLED SUCH AS CARPET, TILE, ETC., UNLESS NOTED OTHERWISE. 2. QEANOUTS SHALL BE PROVIDED WITH TAPERED BRONZE PWGS. 3. WALL CLEANOUTS SHALL BE PROVIOED WITH ROUN� STAINLESS STEEL ACCESS COVERS. PLUMBING FIXTURES: L FIXTURES 8 TRIM: FIXTURES SHALL BE PROVIDEO IN ACCORDANCE WITH THE PROJECT REQUIREMENTS. ASSEMBLIES SHALL BE COMPLETE AN� SHALL INCLUDE FIXTURES AN� ALL REQUIRED APPURTENANCES, TRIM AND FlTTMGS TO PROVIDE A COMPLETE INSTALLATION. ALL FlXTURES SHALL BE SEGURELV ANCHORED AN� FASTENED IN PLACE AND SHALL BE PLUMB AND LEVEL AND AT HEIGHTS REQUIRED BY REFERENCED PLUMBING CODE, ACCESSIBILITY CO�E AND THE AMERICANS WITH DISABILITIES ACCESSIBILITV GUIDELINES. 2. PROVIDESILICONCAULK(DOW-CORNING]841NTERIORSEALANTORE�VAL�ATTHEJOINTBETWEEN PWMBING FlXTURES AND ADJACEM FLOORS. WALLS, ETC. ADJUSTING AND START-UP: 1. THISCONTRACTORSHALLCLEANALLFIXTURES,ADJUSTALLVALVES,ANDLEAVETHESYSTEMIN GOOD WORKING ORDER, REMOVE ALL DEBRIS AN� RUBBISH CAUSED BV HIS WORK, AND REPAIR ANv DAMAGE CAUSED BY HIS WORKMAN. 2. ADJUSTMENT:THISCONTRACTORSHALLINCLUDEINHISBIDARETURNVISITTOTHESITEATATIME TO BE DETERMINED, TO RE-ADJUST VALVES, AND CHECK FOR LEAKS AFTER THE SYSTEM HAS BEEN IN OPERATION. PROJECTCLOSE-OUT 1. THECONTRACTORSHALLPROVIDETOTHEENGINEERACOMPLETESETOFPROJECTDOCUMENTS INDICATING ALL CHANGES TO THE WORK NOT MCORPORATED IN THE DOCUMENTS. CHANGES SHALL BE ANNOTATED WITH A CONTRASTMG COLOR (RED�. THE ANNOTATE� SET SHALL ALSO MC W DE MANUFFCTURER'S MODEL NUMBERS OF FIXTURES AN� E�UIPMENT WHICH ARE �IFFERENT FROM THE PROJECT DOCUMENT INDICATED MODEL NUMBERS. 2. THECONTRACTORSHALLPROVIDETOTHEOWNERACOMPLETESETOFOPERATIONAND MAINTENANCE MATERIALS INDICATING MAINTENANCE SCHEDULES, TROUBLESHOOTING GUIDELINES AND MANl1FACTURER'SISUPPLIERS CONTACT MFORMATION. FIRE STOPPING: 1. FIRE-RATE�CONSTRUCTION'MAINTAINBARRIERANDSTRUCTURALFLOORFIRE RESISTANCE RATINGS WCLUDING RESISTANCE TO COLD SMOKE ATALL PENETRATIONS. 2. ALL PIPING PENETRATIONS MUST BE SEALED IN ACCORDANCE WITH "UL" LISTED ASSEMBLIES. 3. VERIFYEXISTINGCONDITIONSANDSUBSTRATESBEFORESTARTINGWORK.CORRECT UNSATISFACTORV CONDITIONS BEFORE PROCEEDING. 4. ALL FIRESTOPPING PRODUCTS SHALL BE FROM A SINGLE MANUFACTURER 5. THEGONTRACTORSHALLSUBMITFORREVIEWANDACCEPTANCETHEPROPOSEDTHROUGH PENETRATION ASSEMBLV DETAILS PRIOR TO STARTING THE WORK. fi. CLEAN SURFACES TO BE IN CONTACT WITH PENETRATION SEAL MATERIALS. OF DIRT, GREASE, OIL, LOOSE MNTERIALS, RUST, OR OTHER SUBSTANCES THAT MAV AFFECT PROPER FlTTING, ADHESION, OR THE RE�UIRED FlRE RESISTANCE. 7. INSTALL PENETRATION SEAL MATERIALS IN ACCORDANCE WITH PRIMED INSTRUCTIONS OF THE U.L FIRE RESISTANGE DIRECTORY AND IN ACCOR�ANCE WITH MANUFACTURER'S INSTRl1CTI0N. B. EXAMWE PENETRATION SEALEO AREAS TO ENSURE PROPER INSTALLATION BEFORE CONCEALING OR ENCLOSING AREAS. 9. KEEP AREAS OF WORK ACCESSIBLE UNTIL MSPECTION BY APPLICABLE CODE AUTHORITIES. 10. PERFORM PATCHING AND REPAIRING OF FIRESTOPPING CAUSED BY CUTTING OR PENETRATION BY OTHER TRADES. 11. FIRESTOPPINGMATERIALSSHALLBECOMPATABLEWITHPIPINGMATERIALS,AS RECOMMEN�EDBVTHEMANUFACTURERS. PLUMBING LEGEN� SVMBOLS �OMESTIC COLD WATER ---- ooMesricnoTwnTee�no°F� �OMESTIC HOT WATER RETl1RN (110° F) ----140- �OMESTICHOTWATER�140°F) ----140- �OMESTICHOTWATERRETURN(140°F) SANITARY VENT STORM�Sn - - STORM BELOW SLAB/GRADE STORM OVERFLOW (STO) - G - NATURALGAS - C� CONDENSATE � PIPETURNINGDOWN PIPE TURNING UP - TEETURNINGDOWN TEE TURNING UP � PIPECAP ��� 'P'TRAP �� �OH SHUT-0FF VALVE N CHECKVALVE �O� BALANCWGVALVE �O� GASCOCK CG PRESSURE REDUCINGIREGULATING VALVE � STRAINER �'�" SAFETYORRELIEFVALVE W SOLENOIDVALVE � OS&YVALVE �TS OS&YVALVEWITHTAMPERSWRCH �� FD4 FLOOR DRAIN (Sl1FFlX INDICATES DRAIN TYPE) � HD HUBDRAIN --� FS4 FLOOR SINK (SUFFIH INDICATES DRAIN NPE) � TRENCH DRAIN � RD-7 ROOFDRAIN�SUFFlXINDICATESDRAINTYPE) �u FLOOR CLEANOUT �� WALL OR END-OF-LINE CLEANOUT � � PRESSURE6A6E � THERMOMETER �WHA WATERHAMMERARRESTOR�SUFFIXINDICATESPDISIZE) �I� UNION z"� BACKFLOW PREVENTER (REDUCED PRESSURE ZONE) � BACKFLOWPREVEMER(DOUBLECHECK) �� METER (GAS OR WATER) � PUMP �WH WALLHYDRANT(SUFFIHINDICATESHVDRANTNPE) HB HOSEBIBB(Sl1FFlXINDICATESHOSEBIB6TYPE) F�TP TRAPPRIMER 4 FLOWSWITCH �IRECTION OF FLOW - � PIPEANCHOR � DIRECTIONOFDRAINAGEPIPEPITCH OSPECIFIC OR NEW WORK NOTES � REVISION NOTES e� SANITARVWASTEAN�VENTRISERDESIGNATION eWATERRISERDESIGNATION � 5T � STORM RISER �ESIGNATION OETAIL OR PLAN N0. DETAIL OR PLAN 5 SVMBOL SHEETONWHICHDETAILORPLANISDRAWN SHEET ON WHICH DETAIL OR PLAN IS TAKEN ABBREVIATIONS @ AT ' DEGREES � DELTA 0 DIAMETER ii POUND,NUMBER ABV ABOVE AFF ABOVE FINISH FLOOR AD AREADRAIN AHJ AUTHORITY HAVING JURISDICTION AP ACCESSPANEL BEL BELOW BET BETWEEN BFF BELOW FINISH FLOOR BOT BOTTOM BTUH BRITISHTHERMAWNIT/HOUR CFM CUBIC FEET PER MINUTE G CASTIRON t CENTERLME CNDS CONDENSATE CO CLEANOl1T CW COLD WATER DIA DIAMETER DN DOWN DP DRV-PIPE os oowNSPour DET DETAIL DWG DRAWING E� EQIIAL EQPT E�UIPMEM EWC ELECTRIC WATER COOLER F FARIENHEIT,FIRE FCO FLOOR CLEANOUT FD FLOOR DRAIN FlN FlNISH FFE FINISHED FLOOR ELEVATION FL FLOOR FR FROM FS FLOOR SINK, FLOW SWITCH FSEC FOODSERVICEEQIIIPMENTCONTRACTOR FT FOOT GAL GALLON GC GENERALGONTRAGTOR GPM GALLONSPERMINUTE HCP HANDICAP HW HOTWATER HWR HOT WATER RETURN IE INVERTELEVATION INV INVERT IBC INTERNATIONAL BUILDING CO�E IPC INTERNATIONALPLUMBINGCO�E KW KITCHEN WASTE LAV LAVATORV MBH 10�OBTUH MH MANHOLE MTD MOUNTED NTS NOTTOSCALE OFCI OWNER FURNISHED CONTRACTOR INSTALLEO OSBV OUTSIDESCREWANDYOKE P, PLBG PLUMBING PC PLUMBING CONTRACTOR P01 PLUMBINGAN�DRAINAGEINSTITUTE PIV POSTIN�ICATORVALVE PRV PRESSURE REDUCING(REGl1LATING)VALVE RD ROOF �RNIN RM ROOM RPM REVOWTIONSPERMINUTE RWC RAINWATERCON�UCTOR SA SHOCKARRESTOR SAN SANITARV SCHED SCHEDULE SF S�VAREFOOT SS SERVICESINK,STAWLESSSTEEL ST STORM WATER STO STORMWATEROVERFLOW T&P TEMPERATUREANDPRESSURERELIEFVALVE T� TRENCH DRAIN TLT TOILET TW TEMPERED WATER TYP TVPICAL UNO 11NLESS NOTED OTHERWISE UR URINAL V VENT VAC VACUUM VB VACUUM BREAKER VLV VALVE VTR VENTTHRUROOF VUSBC VIRGINIAUNIFORMSTATEWIDEBUIL�INGGO�E W WASTE,WIDE WC WATERGLOSET WCO WALLCLEANOUT WH WALLHVDRANT,WATERHFATER WST WASTE XH EXTRA HEAVY MARK DESCRIPTION PLUMBING FIXTURES (SUBSTITUTES REQUIRES ARCHITECTI OWNER'S APPROVAL) LAVATORV-PUBLIC ARES; UN�ERMOUNT, VITREOUS CHINA, LS GPM P40 SINGLELEVERFAUCETWITHOFFSETGRIDDRAINANDSTEEL BRAI�ED SUPPLIEQ ACCESSIBLE LAVATORV- GUESTROOM; UNDERMOUNT, VITREOUS CHINA, 1.5 GPM P-1 SINGLE LEVER FAUCET WITH OFFSET GRID DRAIN AND STEEL BRAIOED Sl1PPLIES LAVATORY - GUESTROOM; UNDERMOUNT, VITREOUS CHINA, 7.5 GPM P-0A SINGLELEVERFAUCETWITHOFFSETGRIDDRAINAN�STEEL BRAIDE� SUPPLIES, ACCESSIBLE SHOWER- GUESTROOM; MIXING VALVE AND 1.5 GPM HANDHELD P"z SHOWER @ FUNCTION) WITH 36" SLIDE BAR, AGCESSIBLE ROLL-W SHOWER-GUESTROOM; FIBERGLASS SHOWER PAN p_pq WITH MIRING VALVE, HANDHELD SHOWER HEAD AND WALL MOUNTED SHOWER HEA�, WITH 36" SLIDE BAR, ACCESSIBLE WATERCLOSET-GUSETROOM ELONGATEDTOILET"128GPF P-3 (Wq7ERSENSE CERTIFIE��, 30" X 18" X 29-114", FLOOR MOUNTED. WHITE, ACCESSIBLE SERVICECONNECTIONS MOl1NTMG WASTE VENT CW HW HEIGHT REMARKS FIXTURE'. KOHLER K-2682 FAUCET:KOHLERK-7518 2'• 1_1/T' 1l2" 1/2" COUNTER 7EMPERINGVALVE:APOLLOVALVEMVDR(NOTE2) INSULATION KIT: TRUBRO SOAP DISPENSER �. DELTA 72055T FIXTURE�. AMERICAN STANDARD STUDI00614.000 2" 1-0/2" 1/2" 112" GOUNTER FAUCET:BRR066088LF-ECO TEMPERING VALVE APOLLO VALVE MVDR (NOTE 2) FIXTURE'. AMERICAN STANDARD STU�100614000 FAUCET:BRIZO65088LFEC0 7• 1 V2' V2" 7/2" COUMER 7EMPERINGVALVE:APOLLOVALVEMVDR(NOTE2) INSl1LATI0N KIT�. TRUBRO 2" 1-0/2" il2" 1/2" FLOOR SHOWER'DELTAPROCRYLIC60"x3P' TRIM: DELTA T13H332 FLOOR DRAIN' JR SMITH 2O05-AHP-CP 2" i ll2" V2" V2" FLOOR SHOWER'KOHLERK-02102-GZZ60"x3fi" TRIM' DELTA T13H303�25 FLOOR DRAIN: JR SMITH 2O05-AHP-CP 3^ �_��p^ 3�q^ - FLOOR FIXTURE:OELTA,C43908-WH,WHITE SEAT:BERM15,7900TDGSL.WHITE 1. MOUNTING HEIGHT IS TO FLOOD LEVEL RIM OF FIXTURE UNLESS NOTED OTHERWISE. 2.LOCATETEMPERMGVALVEABOVEACCESSIBLECEILINGORBEHINDANACCESSPANELBELOWTHEFlXTURE. TEMPERINGVALVESHALLBELOCATE�ASCLOSETOTHEFAUCETASPOSSIBLE. 3. SEE MNNUFACTUROR'S INSTALLATION MSTRUCTIONS FOR BLOCKING RE�URMENTS FOR MOUNTING SUPPORT BRACKETS. PWMBING PIPMG MATERIALS SVSTEM MATERIAL STANDARD REMARKS DOMESTIC WATER, BELOW GROUND, 3" AND SMALLER TYPE K COPPER ASTM B88 NOTES 1& 2 DOMESTIC WATER, ABOVE GROUND TYPE L COPPER, INSULATE� ASTM B88 NOTE 7 8 5 PIPING INSULATION - COLD WATER 1" FlBERGLASS, ASJ PIPINGINSULATION-HOTWATERANDRECIRCULATION 1"FlBERGLASS,ASJ SANITARY WASTE , ABOVE GROUND PVC - SOLIO CORE ASTM D2729 SANITARY VENT, ABOVE GROUND PVC - SOLIO CORE ASTM D2729 SANITARY WASTE 8 VENT, BELOW GROUND PVC -SOLIO CORE ASTM D 2fi65 NOTE 4 GENERALNOTES'. A. THROUGH PENETRATION ASSEMBLIES AT RATED WALLS SHALL BE COMPATIBLE WITH PIPING MATERIALS. B. SUPPLV PIPING SHALL CONFORM TO THE REQUIREMENTS OF NSF 61. C. PIPE AND FITTINGS FOR A GNEN SYSTEM SHFLL BE PROVIDED BY A SINGLE MANUFACTURER. NOTES: 1. INSTALL PIPING USING WROUGHT OR CAST FITTINGS AND SOLDER JOINTS USING 95-5 TIN-ANTIMONY SOLDER. 2 USE CONTINllOUS LENGTH OF ANNEALED COPPER COIL FOR PIPING LOCATED BELOW SLAB-ON-GRADE CONSTRUCTION. 3.NOTUSED. 4. SOLVENT CEMENT AN� PRIMER SHALL COMPLV WITH RE�UIREMENTS FOR LOW VOC CONTEM. 5. FITTINGS FOR �OMESTIC WATER PIPING SHALL BE COPPER, NO PLASTIC FITTINGS WILL BE ACCEPTED. Q L N � - C a � � � a � °-c'mo :0 d o�«� y � m O � y���e� CONSOLTAVTS Vr VI �L � W a ry /w '~"� N c r � w v � m ry c C � m j � W + � w o c 3Z Sw�� N � Jw ��o v Q \o.P`O°PNiENk (U�O. ; �STnR� = ��No.v ird],{ooi,9a,�..� ' •```\�� 1X��" STATE OF �, �q'�iF; . irvo i nc�a \�$'\.�� /�SSiii�iLii��� . 04I16I20 J (� ~J�M OZQ7 UQ�Z Zp�'� (�Z�w (�_�� Z�'6JQ wO�U �Z� W U �Q � (n w N � Q o Z W � 1 nacnr�crvs s'�n� 1 suevissior�s I REVISIONS: aE�EnsEOFoa� ❑ VHELIMINARY ONLY ❑91��ING � aEamirs ❑ coNsraucnoN onreov3vzozo VROJECT N0.:5352 �RAWM LW oes�rveo��w cHecK�.leo sHee.nne. NOTESANDSCHEDULES � S�EETM . 002