HomeMy WebLinkAboutRev_D102_Demo1. WHERE CEILINGS ARE TEXTURED, ADD NEW LAYER OF SMOOTH 5/8"
DRYWALL CEILINGS THROUGHOUT AT 9' -10" +/-A.F.F.
2. REMOVE ALL LIGHT FIXTURES. REFERENCE REFLECTED CEILING
PLAN A201.
3. PATCH CORE DRILLS/HOLES IN FLOOR AS REQUIRED.
4. REMOVE HVAC DIFFUSERS AND RETURNS AS REQUIRED. REUSE
FIXTURES IN GOOD CONDITION.
5. REMOVE ALL EXISTING FINISHES. REFERENCE FINISH PLAN A400
FOR FINAL FINISH PLAN.
GENERAL NOTES
LEGEND
NEW CONSTRUCTION
SOLID LINES INDICATE EXISTING ITEMS TO REMAIN.
NOTE: REFERENCE THE COVER SHEET FOR GENERAL
DEMOLITION NOTES.
KEYED NOTES
DASHED LINES AND SYMBOLS INDICATE EXISTING
ITEMS TO BE REMOVED OR SALVAGED. REFERENCE
PLAN NOTES.
PATCH AND PREP WALLS WHERE DEMOLITION
OCCURS ADJACENT AN EXISTING WALL. TERMINATE
PLUMBING AT THE NEAREST LOCATION.
REUSE EXISTING FIXTURES IF IN GOOD CONDITION.
AREA NOT IN CONTRACT
AREA OF WORK
1[PROJECT NUMBER][DATE][DRAWN BY][CHECKED BY]ALL DESIGNS, CONCEPTS, ARRANGEMENTS AND PLANS
INDICATED OR REPRESENTED BY THESE DRAWINGS ARE
OWNED BY PARALLEL DESIGN GROUP, INC. AND SHALL NOT BE
USED BY OR DISCLOSED TO ANY PERSON, FIRM OR CORP. FOR
ANY REASON WHATSOEVER WITHOUT THE WRITTEN CONSENT
OF PARALLEL DESIGN GROUP INC.
CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL
DIMENSIONS ON THE JOB SITE. PARALLEL DESIGN GROUP INC.
MUST BE NOTIFIED OF ANY DISCREPANCIES OR VARIATIONS
FROM THE DIMENSIONS SHOWN ON THE PLAN.
N [ P ][ W ]8940 River Crossing Blvd. Ste 150Indianapolis, IN 46240ParallelDG.com317.721.4399 2020.16909.02.2020BWSB & BDD102
THIRD FLOOR
DEMOLITION PLANPYATT BUILDERS630 3RD AVENUE SOUTHWEST -2ND & 3RD FLOORCARMEL, INDIANA 460321 REMOVE RAILING.
3/16" = 1'-0"
THIRD FLOOR DEMOLITION PLAN1 MARK DATE DESCRIPTION09/16/20